伊泰煤炭股份有限公司纳林庙煤矿二号井准备队 连采B区回采作业规程
负载损耗ΔPN=4.5KW
RT=ΔPNU22/SN2=4500×1.22/8002=0.010125Ω ZT =u% U22/SN=0.0409×1.22/0.8=0.07362Ω
X1?zr?R2?0.00541990442?0.000102515622?0.07292043?2
(4)干线电缆电阻
查表得电缆MYP-3×70+1×25 r0=0.315Ω/Km x0=0.078Ω/Km
X2=x0L2=0.078×0.3=0.0234Ω
R2=r0L2=0.315×0.3=0.0945Ω
(5)给采煤机供电的支线电缆阻抗
查表得电缆MYP-3×70+1×25 r0=0.315Ω/Km x0=0.078Ω/Km
X3=x0L3=0.078×0.5=0.039Ω R3=L3r0=0.315×0.5=0.1575Ω
(6)短路电流计算
∑R=R1+RT+R2+R3+0.01=0.0012096+0.010125+0.0945+0.1575+
0.01
=0.279385Ω
∑X=X+X1+X2+X3+XT=0.0288+0.00138+0.0234+0.039+0.07292043 =0.16550043Ω
Z1??R??X22?0.32472?50 7
IS(2)=U2/2Z=1.2/2×0.32472507=1.848KA
灵敏度校验 Kr= IS(2)/Isb=1848/400=4.62>1.5 大于1.5,所以过流整定满足要求。
2、梭车最远点两相短路电流的计算及保护灵敏度校验 (1)系统折算电抗
X=U22/Sbr=1.22/50=0.0288Ω
(2)高压电缆折算阻抗
- 36 -
伊泰煤炭股份有限公司纳林庙煤矿二号井准备队 连采B区回采作业规程 查表得MYPTJ-3×50+1325/3+332.5 高压电缆r0=0.42Ω/Km x0=0.08Ω/Km
X1=X0L1(U2/U1)2=0.08×1.2×(1.2/10)2=0.00138Ω
R1=L1 r0(U2/U1)=0.42×1.2×(1.2/10)2=0.00726Ω (3)移动变电站阻抗
查表得KBSGZY-500/10移动变电站 阻抗电压u%=4.09%
负载损耗ΔPN=3.1KW
RT=ΔPNU22/SN2=3100×1.22/5002=0.017856Ω ZT =u% U22/SN=0.0409×1.22/0.5=0.117792Ω
X1?zr?R2?0.1177922?0.0178562?0.11642903?
2(4)干线电缆电阻
查表得电缆MYP-3×70+1×25 r0=0.315Ω/Km x0=0.078Ω/Km
X2=x0L2=0.078×0.3=0.0234Ω R2=r0L2=0.315×0.3=0.0945Ω
(5)给梭车供电的支线电缆阻抗
查表得 电缆MYSP-3×16 r0=1.369Ω/Km x0=0.09Ω/Km
X3=x0L3=0.09×0.5=0.045Ω R3=L3r0=1.369×0.5=0.6845Ω
(6)短路电流计算
∑R=R1+RT+R2+R3+0.01=0.00726+0.017856+0.0945+0.6845+0.0
1
=0.814116Ω
∑X=X+X1+X2+X3+XT=0.0288+0.00138+0.0234+0.045+0.11642903 =0.21420903Ω Z??R??X22?0.8418?3
IS(2)=U2/2Z=1.2/2×0.84183=0.7127KA 灵敏度校验 Kr= IS(2)/Isb=712.7/80=8.9>1.5 大于1.5,所以过流整定满足要求。
- 37 -
伊泰煤炭股份有限公司纳林庙煤矿二号井准备队 连采B区回采作业规程 3、破碎机最远点两相短路电流的计算及保护灵敏度校验 (1)系统折算电抗
X=U22/Sbr=1.22/50=0.0288Ω
(2)高压电缆折算阻抗
查表得MYPTJ-3×50+1325/3+332.5 高压电缆r0=0.42Ω/Km x0=0.08Ω/Km
X1=X0L1(U2/U1)2=0.08×1.2×(1.2/10)2=0.00138Ω
R1=L1 r0(U2/U1)=0.42×1.2×(1.2/10)2=0.00726Ω (3)移动变电站阻抗
查表得KBSGZY-500/10移动变电站 阻抗电压u%=4.09%
负载损耗ΔPN=3.1KW
RT=ΔPNU22/SN2=3100×1.22/5002=0.017856Ω ZT =u% U22/SN=0.0409×1.22/0.5=0.117792Ω
X1?zr?R2?0.117792?0.017862?0.11643?
2(4)干线电缆电阻
查表得电缆MYP-3×70+1×25 r0=0.315Ω/Km x0=0.078Ω/Km
X2=x0L2=0.078×0.3=0.0234Ω R2=r0L2=0.315×0.3=0.0945Ω
(5)给破碎机供电的支线电缆阻抗
查表得 电缆MYP-3×50+1×16 r0=0.448Ω/Km x0=0.081Ω/Km
X3=x0L3=0.081×0.5=0.0405Ω R3=L3r0=0.448×0.5=0.224Ω
(6)短路电流计算
∑R=R1+RT+R2+R3+0.01=0.00726+0.017856+0.0945+0.224+0.01 =0.353616Ω
∑X=X+X1+X2+X3+XT=0.0288+0.00138+0.0234+0.0405+0.11643 =0.68031Ω
- 38 -
伊泰煤炭股份有限公司纳林庙煤矿二号井准备队 连采B区回采作业规程 Z??R??X22?0.7667?2 4 IS(2)=U2/2Z=1.2/2×0.766724=0.7826KA 灵敏度校验 Kr= IS(2)/Isb=782.6/120=6.5>1.5 大于1.5, 所以过流整定满足要求。
4、皮带最远两相短路电流的计算及保护灵敏度校验 (1)系统折算电抗
X=U22/Sbr=0.692/50=0.009522Ω
(2)高压电缆折算阻抗
查表得MYPTJ-3×50+1325/3+332.5 高压电缆r0=0.42Ω/Km x0=0.08Ω/Km
X1=X0L1(U2/U1)2=0.08×1.2×(1.2/10)2=0.00138Ω
R1=L1 r0(U2/U1)=0.42×1.2×(1.2/10)2=0.00726Ω (3)移动变电站阻抗
查表得 KBSGZY-800/10/0.69KV移动变电站 阻抗电压u%=4.09%
负载损耗ΔPN=3500W
RT=ΔPNU22/SN2=3500×0.692/5002=0.0066654Ω ZT =u% U22/SN=0.0409×0.692/0.5=0.03894498Ω
XT?ZT?RT?0.0.038944982?0.00666542?0.1229743?22
(4)干线电缆电阻
查表得电缆MYP-3×70+1×25 r0=0.448Ω/Km x0=0.081Ω/Km
X2=x0L2=0.081×0.3=0.0243Ω R2=r0L2=0.448×0.3=0.1344Ω
(5)一部皮带机支线电缆阻抗
查表得电缆MYP-3×70+1×25 r0=0.448Ω/Km x0=0.081Ω/Km
X3=x0L2=0.081×0.3=0.0243Ω R3=r0L2=0.448×0.3=0.1344Ω
(6)短路电流计算
∑R=R1+RT+R2+R3+0.01=0.00726+0.0066654+0.1344+0.1344+0.
- 39 -
伊泰煤炭股份有限公司纳林庙煤矿二号井准备队 连采B区回采作业规程 01
=0.2927254Ω
∑X=X+X1+X2+X3+XT=0.009522+0.00138+0.0243+0.0243+0.1229743 =0.1824763Ω Z??R2??X2 ?0.3449?4IS(2)=U2/2Z=0.69/2×0.34494=1.0001KA
灵敏度校验 Kr= IS(2)/br=1000/200=5>1.5 大于1.5,所以过流整定满足要求。
5、风机最远两相短路电流的计算及保护灵敏度校验
(1)系统折算电抗
X=U22/Sbr=0.692/50=0.009522Ω
(2)高压电缆折算阻抗
查表得MYPTJ-3×50+1325/3+332.5 高压电缆r0=0.42Ω/Km x0=0.08Ω/Km
X1=X0L1(U2/U1)2=0.08×0.3×(0.69/10)2=0.0001143Ω
R1=L1 r0(U2/U1)=0.42×0.3×(0.69/10)2=0.0005999Ω (3)移动变电站阻抗
查表得 KBSGZY-200/10/0.69KV移动变电站 阻抗电压u%=4.1%
负载损耗ΔPN=1800W
RT=ΔPNU22/SN2=1800×0.692/2002=0.0214245Ω ZT =u% U22/SN=0.041×0.692/0.2=0.0976005Ω
XT?ZT?RT?0.00952585762?0.0004590092222?0.09522?
(4)干线电缆电阻
查表得 电缆MYP-3×25+1×10 r0=0.864Ω/Km x0=0.088Ω/Km
X2=x0L2=0.088×0.05=0.0044Ω R2=r0L2=0.864×0.05=0.0432Ω
- 40 -