VB程序设计试题与答案解析

2019-02-20 20:46

Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity. This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high-strength bolt connection JGJ82-91 7, the technicalspecification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic beam material Q345B. mechanical properties and chemical composition are in line with the GB/T1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to preventexcessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.

VB程序设计试题

1. 多窗体程序是由多个窗体组成,在缺省情况下,VB在应用程序执行时,总是把( )指定为启动窗体。

A. 不包含任何控件的窗体 B. 设计时的第一个窗体 C. 包含控件最多的窗体 D. 命名为Frm1的窗体

2. 应用程序打包后,其包文件的后缀为( )。

A. .exe B. .cab C. .txt D. .ocx

3. 当一个工程中含有多个窗体时,其中的启动窗体是( )。

A. 启动VB时创建的第一个窗体 B. 第一个添加的窗体

C. 最后一个添加的窗体 D. 在“工程属性”对话框中指定的窗体

4. 能够改变标签Label控件显示标题的属性是( )。

A. Capion B. Name C. Click D. Text

5. 下面关于工程的概念中错误的是( )。

A. Visual Basic 的工程是相关应用程序文件的集合

B. Visual Basic 的工程实际上为了管理构成应用程序的所有文件 C. 一个大的Visual Basic应用程序才能构成一个工程

D. 建立只有一个窗口的应用程序,会生成多个程序文件,也称为一个工程

6. 将一个VB程序保存在磁盘上,至少会产生的文件是( )。 A. .doc、.txt B. .txt、.exe C. .vbp、.frm D. .bat、.frm B.

7. 一个VB应用程序可以包含几个vbp文件( )

8. A. 1个 B. 2个 C. 可以没有 D. 不受限制 9.

8. 当运行程序时,系统自动执行启动窗体的( )事件过程。

A. Load B. Click C. Unload D. GotFocus

9. 对于定时器(Timer)控件,设置其定时是否开启的属性是( )

A. Index B. Tag C. Enabled D. Left

10. 启动VB后,就意味着要建立一个新( )。

A. 窗体 B. 程序 C. 文件 D. 工程

Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity. This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high-strength bolt connection JGJ82-91 7, the technicalspecification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic beam material Q345B. mechanical properties and chemical composition are in line with the GB/T1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to preventexcessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.11. 假定已在窗体上画了多个控件,并有一个控件是活动的,为了在属性窗口中设置窗体的属性,预先应执行的操作是( )

A. 单击窗体上没有控件的地方 B. 单击任一个控件 C. 不执行任何操作 D. 双击窗体的标题栏

12. 下面各种高级语言中,不是面向对象程序设计语言的是( )。

A. Visual Basic B. C++ C. Pascal D. Java

13. Visual Basic应用程序处于执行模式时,这时( )。

A. 既不能设计界面,也不能编写代码 B. 可以编辑代码,不能设计界面 C. 可以设计界面,不能编辑代码 D. 既能设计界面,也能编写代码

14. 要改变控件的宽度,应该修改控件的( )属性。

A. Top B. Left C. Width D. Height

15. 将定时器的时间间隔设置为1秒,则定时器的Interval属性值应设为( ) A. 1 B. 100 C. 1000 D. 10

16. 应用程序设计完成后,应将程序保存,保存的过程是( )。

A. 只保存窗体文件即可 B. 只保存工程文件即可 C. 先保存工程文件,之后还要保存工程文件 D. 先保存窗体文件(或标准模块文件),之后还要保存工程文件

17. Visual Basic是一种面向对象的程序设计语言,所采用的编程机制是( )。 A. 从主程序开始执行 B. 按过程顺序执行 C. 事件驱动 D. 按模块顺序执行

B. 18. 对象的性质和状态特征称为( )

A. 事件 B. 方法 C. 属性 D. 类

19. 在VB6.0集成开发环境中有三种工作模式,下列不属于三种工作模式之一的是( )

A. 设计模式 B. 中断模式 C. 执行模式 D. 编写代码模式

20. 如果要在文本框中键入字符时,只显示某个字符,如星号(*),应设置文本框的( )属性。

A. Caption B. PasswordChar C. Text D. Char

21. Visual Basic应用程序处于中断模式时,应用程序暂时中断,这时不可( )。 A. 编辑代码 B. 设计界面和编辑代码 C. 继续运行程序 D. 设计界面

22. 以下关于MsgBox的叙述中,错误的是( )。

Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity. This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high-strength bolt connection JGJ82-91 7, the technicalspecification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic beam material Q345B. mechanical properties and chemical composition are in line with the GB/T1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to preventexcessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.A. MsgBox函数返回一个整数

B. 通过MsgBox函数可以设置信息框中图标和按钮的类型 C. MsgBox语句没有返回值

D. MsgBox函数的第一个参数是一个整数,该参数只能确定对话框中显示的按钮数量

23. 无论何种控件,共同具有的属性是( )

A. Text B. Name C. Caption D. ForeColor

24. 下列说法中错误的是( )。

A. 应用程序的界面是窗体 B. 应用程序的界面是对象

C. 每个应用程序都要生成一个工程 D. 一个应用程序由若干个Visual Basic 文件组成

25. 下列选项中,属于VisualBasic程序设计方法的是( )。

A. 面向对象、顺序驱动 B. 面向对象、事件驱动 C. 面向过程、事件驱动 D. 面向过程、顺序驱动

Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity. This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high-strength bolt connection JGJ82-91 7, the technicalspecification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic beam material Q345B. mechanical properties and chemical composition are in line with the GB/T1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to preventexcessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.答案解析

1 B 若未对工程属性进行更改,设计时的第一个窗体即为启动窗体(工程属性中的启动窗体)

2 B 打包后的文件后缀名为cab 3 D 在工程属性中可以设置启动窗体

4 A label的caption属性用于显示标签的标题 5 C 任何一个vb程序都可以构成一个工程 6 C vbp、frm为工程所必须的文件 7 A 一个工程包含一个vbp文件

8 A 程序运行时,窗体被加载,自动运行load事件

9 C enabled属性设置为true时启动计时器,设置为false时关闭计时器

10 D 启动VB就是新建工程

11 A 单击没有控件的地方就是选中了窗体,就可以对窗体的属性进行设置

12 C pascal是面向过程的语言 13 A 工程执行时不可以进行其他操作

14 C top:改变顶边位置、left:改变左边位置、width:改变宽度、height:改变高度 15 C 1表示1毫秒

16 D 工程(vbp)文件最后保存 17 C VB采用事件驱动的编程机制 18 C 属性可以设置对象的性质和状态

19 D 编写代码模式不属于vb的三种工作模式之一

20 B 设置password属性可以将文本框的内容以特定的形式显示 21 D 中断时无法设计界面

Wuhan intelligent elevator co production workshop and warehouse steel structures at the donghu development zone, Wuhan University Science and Technology Park, Park Road. 1, an area of the steel: production workshop is 7344.00 square meters; finished goods warehouse is 1036.80 square meters. 2, light steel structure fabrication and installation costs of the project are: 4.35 million Yuan. 3, the project designed by Wuhan Polytechnic Institute, Zhejiang, the light steel structure limited the production and installation of steel structures. 4, the installation period of the project is: 70 days (workshop and warehouse were 70 days). 5, the technology requirements for the production and installation of engineering and construction quality, duration control, supervision of contract performance commissioned by the owners corporation and Zhejiang, the Palace to complete steel structure, a QC, and monitor in real time to ensure the completion of the project according to the quality and quantity. This project by the Zhejiang plant production system to do immediately after the steel structure, organized by the Engineering Department for field installation. Design and production based on installation procedure the project by Wuhan Polytechnic Institute of design, Zhejiang, the steel structure, based on intelligent elevator company and Wuhan steel, signed production and installation contract for production of detail design. Quality acceptance code for architectural design of light steel structure and construction profiles: 1, GB5009-2001 2, of the structural specification of the building code for seismic design of GB50011-2001 3, GB50017-2003 4, of the code for design of steel structure of the standard specification for cold-formed thin-walled steel structure GB50018-2002 5, the steel structure project construction quality approval standard GB50205-2001 6, the Specification for construction and acceptance of steel structure design of high-strength bolt connection JGJ82-91 7, the technicalspecification for steel structure welding JBJ81-2002 8, the technical specification for steel structure of door-like steel frame light house CECS102-2002 material selecting overview support section: production workshop roof pitch i=5%. Finished products warehouse roof slope of 8%. Roof: a single layer Board + insulation wool + steel wire mesh roof plate with 0.50mm blue HXY-820 color steel plate aluminum-plating zinc. thick fiberglass insulation cotton with 75mm density 12Kg per cubic metre. Wall surfaces (workshop): double Board + insulation cotton, outer wall surface with 0.50mm white galvanized HXY-840 color steel plate, wall plate white galvanized HXY-900 0.40mm color steel plate, uses 50mm fiberglass insulation cotton, density 12Kg per m3. Part of the main structure: steel column correction after his time on column bottom and base top surface gaps without the secondary water shrinkage of fine stone concrete. Steel columns, beams, frames, beams, columns, a wind column, traffic beam material Q345B. mechanical properties and chemical composition are in line with the GB/T1591-94 provision of the low-alloy structural steel. Brace, knee brace ... Surface protection of steel structure paint according to the contract, be dealt with separately. Located ± 0.000 2% NaN02 steel surface coating cement weight cement mortar, and C10 concrete packages to 0.15M, package thickness of 100 feet of concrete. Steel structure installation overview: installation and acceptance of steel structure should be carried out according to the GB50205-2001, strict construction quality and construction of the installation order. Single component production after the immediate classification number should be placed, it is forbidden to place. Structure before installing the widget should be a comprehensive inspection, such as member number, length, perpendicularity, flatness, it meets the design requirements and specifications. Structure lifting and appropriate measures should be taken to preventexcessive torsion deformation of components. Main steel frame installed, grasp the rope should be set up in time, and support system in place before they can remove temporary installation and adjustment range Rover wind rope. All round support should finally install regulated tension. All the superstructure must be installed in the lower part of the structural adjustment in place and fix the following. High-strength bolt connections within the contact surface using sandblasting process and components, not brushing paint or defaced.22 D msgbox的第一个参数是字符串,第二个参数是整数,第三个参数是字符串

23 B 任何控件都有name属性

24 D 一个工程由若干个文件组成,一个应用程序可以需要若干个文件的支持,但只是一个文件

25 B VB是面向对象的高级编程语言,采用事件驱动的编程机制


VB程序设计试题与答案解析.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:七年级英语下册Unit7Itsraining词汇篇试题新版人教新目标

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: