第五章
Chapter Review Questions
1. The procurement phase precedes the design phase since it involves the bidding and award
of architect service. True or false?F
采购阶段之前的设计阶段,因为它涉及到建筑服务的招投标和奖励
2. The feasibility stage of a project requires heavy owner involvement. True or false?T
一个项目的可行性研究阶段需要大量的业主参与
3. It is imperative for project success that the feasibility, design, procurement, construction,
turnover, and operation stages described in this chapter occur in linear fashion. That is , no stage proceed without the prior stage being completed. True or false? T
当务之急是项目成功的可行性研究,设计,这一章中所描述的采购,施工,营业额,经营阶段发生的以线性方式。也就是说,没有舞台没有进行事先阶段已经完成
4. Project design typically proceeds as follows: programming, design development, schematic,
and construction documents. True or false?F
项目设计一般过程如下:规划,设计开发,原理图和施工文件。
5. As interest rates increase, income in future years become more valuable in offsetting
up-front construction costs. True or false? F
随着利率的上升,收入在未来几年中抵消变得更有价值的前期建设成本
6. Advertising for subcontractors, review of subcontractors’ bids, and awarding of contracts
occurs during which project phase? a
a. Procurement b. Construction c. Design d. Turnover e. Feasibility
7. As-built drawing, warranties, guarantees, and operation manuals are all provide to the
owner during which project phase? d
a. b. c. d. e. Feasibility analysis Design
Construction Turnover Procurement
8. The production of drawing and specifications occurs in which project phase? b
a. b. c. d. e.
Feasibility analysis Design
Construction Turnover Procurement
9. Which of the following are considered in determining the feasibility of a project? e
a. b. c. d. e.
Cost of money Estimated cost Market demand Project timing All of the above
10. The design of project system occurs during which of the following design phase? c a. b. c. d. e.
Programming Schematic
Design development Construction documents None of the above