Work Station I Eligible a b,c,e, (tie) Assign A B C E D F G H Time Remaining 1.1 0.7 0.4 0.3 0.0 0.5 0.2 0.1 Idle Time 0.3 0.0 0.2 0.1 0.6 II III d f,g IV

h 3. Idle percent??(idle time).6??11.54 percent

NxCT4(1.3)

4. Output?OT420 min./day??323.1 (rounds to 323)copiers/day CT1.3 min./cycleTotal time4.6??2.3 minutes N2

b. 1. Total time?4.6, CT?

2. Assign a, b, c, d, and e to station 1: 2.3 minutes [no idle time]

Assign f, g, and h to station 2: 2.3 minutes

3. Output?4.

OT420 ??182.6 copiers/day CT2.3Maximum Ct is 4.6. Output?420 min./day?91.30 copiers/day

4.6 min./cycle7.

1 3 6 5 8 2 4 7 6 / 22

Solutions_Problems_OM_11e_Stevenson

Chapter 06 - Work Design and Measurement

3.

Element PR OT 1 2 3 4

Total

.90

.46

NT AFjob ST

.414 1.15 .476

.85 1.505 1.280 1.15 1.472 1.10

.83

.913 1.15 1.050

1.00 1.16 1.160 1.15 1.334

4.332

8. A = 24 + 10 + 14 = 48 minutes per 4 hours

A?

48?.20240

NT?6(.95)?5.70min.ST?5.70x1?7.125min.1?.20 9.

a.

b.

Element PR OT 1 2 3

NT A ST

1.10 1.19 1.309 1.15 1.505 1.15 1.05

.83 .56

.955 1.15 1.098 .588 1.15 .676

x?.83

s?.034?zs??2(.034)? n????67.12~68observations ???.01(.83)ax???z?2.00?A?.012222

7 / 22

?zs??2(.034)?c. e = .01 minutes n???????46.24, round to 47

?e??.01?Solutions_Problems_OM_11e_Stevenson

Chapter 07- Location Planning and Analysis

1.

Factor Local bank 1. Convenience for

customers H 2. Attractiveness of

building H 3. Nearness to raw

materials L 4. Large amounts of

power L 5. Pollution controls L 6. Labor cost and

availability L 7. Transportation

costs L 8. Construction

costs M

Steel mill

L L H H

H M M–H H

Food warehouse

M–H M L L L L M–H M

Public school

M–H M–H M L L L M M–H

4.

Factor

1. Business Services 2. Community Services 3. Real Estate Cost 4. Construction Costs 5. Cost of Living 6. Taxes 7. Transportation

Total

Location (a) A B C 9 7 3 5 4 5 6 39

5 6 8 6 7 5 44

5 7 7 5 8 5

Weight 1/9 1/9 1/9 1/9

Location (b) A B 7/9 3/9 4/9 5/9

6/9 8/9 7/9 5/9

C 7/9 7/9 8/9 4/9

2/9 18/9 10/9 10/9

2/9 10/9 12/9 10/9

7 8 45

1/9 6/9 7/9 8/9 1.0 53/9 55/9 54/9

Each factor has a weight of 1/7.

39 44 45 7 7 7

a. Composite Scores

B or C is the best and A is least desirable.

b. Business Services and Construction Costs both have a weight of 2/9; the other factors each have a weight of 1/9.

5 x + 2 x + 2 x = 1 ? x = 1/9

c. Composite Scores

A B C 53/9 55/9 54/9

B is the best followed by C and then A.

8 / 22

Solutions_Problems_OM_11e_Stevenson

5.

Location A

B C D E Totals

x y

3 7 8 2 4 6 4 1

6 4 25 20

= 25 = 5.0

5

?y =

?yi n

= 20

5

= 4.0

?x =

?xi n

Hence, the center of gravity is at (5,4) and therefore the optimal location.

Chapter 08 - Management of Quality

1.

Checksheet Work Type Lube and Oil Brakes Tires Battery Transmission

Total

Pareto 12 Lube & Oil

Frequency

12 7 6 4 1 30

7 6 4 1 Brakes

Tires

Battery

Trans.

9 / 22

Solutions_Problems_OM_11e_Stevenson

2 .

The run charts seems to show a pattern of errors possibly linked to break times or the end of the shift. Perhaps workers are becoming fatigued. If so, perhaps two 10 minute breaks in the morning and again in the afternoon instead of one 20 minute break could reduce some errors. Also, errors are occurring during the last few minutes before noon and the end of the shift, and those periods should also be given management’s attention.

3 2 1 ? 0

? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

?

? ? ? ? ? ? ?

?

break lunch break

4

Person Missing Didn’t turn completely on Lamp Burned out Loose Lamp fails to light Not plugged in Power off Outlet defective Other

10 / 22

Defective Cord


《运营管理》课后习题答案(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:小学填空题常见错题

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: