浅谈水电站大坝施工组织设计
摘要:本文结合金沙江溪洛渡水电站水垫塘边坡工程施工实例,对施工总平面布置、施工导截流等进行了比较全面的探析,旨在为同类水利工程施工组织设计提供参考借鉴。
关键词:水电站;施工组织;施工布置;施工导截流
abstract: this paper from xiluodu hydropower jinshajiang river water cushion slope engineering construction then example, the general layout, construction construction such as the initial compared comprehensive analysis, in the same water conservancy project aims to provide a reference for the construction organization design.
keywords: hydropower station; the construction
organization; construction layout; construction the initial
中图分类号: tv7 文献标识码:a 文章编号: 1工程概况
金沙江溪洛渡水电站水垫塘边坡混凝土高程范围为
el.343.0m~el.412.0m。边坡坡比在高程360.0m以下部位为1:1.2,高程360.0m至高程386.0m为1:1.0,高程386.0m至高程404.67m为1:0.75,高程404.67m以上为直立边坡,在高程360.0m和高程386.0m处设有5.0 m宽马道。高程360.0m以下边坡混凝土厚4.0m,高程360.0m至高程386.0m边坡混凝土厚3.0m,高程386.0m至高