1st Element of Standard Work18

Issue Date:TIME AVAILABLE CALCULATIONHOURS per SHIFT**

Prepared by:DEMAND CALCULATIONUNITS on Order Leadtime

x 60 min x 60 sec =

28800 Seconds minusSeconds Seconds

2201

/ /

5

= =

440 +

UNITS per DAY

PAST DUE BACKLOG UNITS DAYS TO ELIMINATE

Lunch (if paid) TPM* Break Wash-up 5 S*

UNITS per DAY

equalsDAILY DEMAND

600 Seconds 300 Seconds 600 SecondsSeconds Seconds DAILY DEMAND

440

UNITS per DAY

# OF SHIFTS**

DEMAND = 440UNITS per SHIFT

440

/

1

equalsTime Available w/out Set-Up

# OF STATIONS** Seconds

UNITS PER STATION

27300 minus

/

1

=

440

Set-Up (if known)*

Seconds PER SHIFT - PER STATION

equals TIME AVAILABLE 27300 Seconds

TIME AVAILABLE

DEMAND

27300

/

440

TAKT TIME = Sec. 62


IE培训资料(7).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:《职业卫生档案管理规范》(安监总厅安健〔2013〕171号)

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: