3.3 设计人人员
3.4 设计分包
3.5 联合体
4. 工程设计 ······················································· 23
4.1 提供工程设计资料
4.2 逾期提供的责任
5. 工程设计要求 ······················································· 24
5.1 工程设计一般要求
5.2 工程设计保证措施
5.3 工程设计文件的要求
5.4 不合格工程设计文件的处理
6. 工程设计进度与周期 ·············································· 27
6.1 工程设计进度计划
6.2 工程设计开始
6.3 工程设计进度延误
6.4 暂停设计
6.5 提前交付工程设计文件
7. 工程设计文件交付 ················································· 31
8. 工程设计文件审查 ················································· 32
9. 施工现场配合服务 ················································· 34
10. 合同价款与支付 ·················································· 34
10.1 合同价款组成