毕业设计终稿(3)

2021-04-06 06:18

污水处理标准三卷式毕业设计全套

ABSTRCT

The design for the preliminary design of the north city wastewater treatment plant effluent from a sewage treatment plant, requirements according to the "urban sewage treatment plant pollutant discharge standard" (GB18918-2002) of a standard B emission. Because the sewage originates is mainly the sanitary sewage, the nitrogen phosphorus content is high, from this designs needs to consider the denitrogenation eliminates the phosphorus. This factory second-level biological treatment mainly uses a2/O processing craft, the main construction is: Before the pump, the grill, promotes the pump house, the thin grill, the eddy sand collector, the advection type sedimentation pond, a2/O response pond, the spoke class type

sedimentation pond, the ultraviolet ray disinfection ditch. The sludge treatment construction includes: Gravity concentration basin, sludge dewatering engine room and so on.

The process of the wastewater plant that the wasterwater treatment plant adopted is as following:

Wastewater treatment process: middle bar screen → pump station → fin bar screen → aeration desilting tank → A/O process→ disinfection of contact pool→measurement groove → drain;

Sludge handling and disposal process: excess activated sludge → concentrated pool → sludge tank → machine dewatering → disposal of sludge cake.

Key words: sludge conditioning; A2/O craf ; Nitrogen and phosphorus removal

II


毕业设计终稿(3).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:岗位职责汇编工程部2

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: