摘 要
城市污水处理厂是现代城市发展和水资源保护不可缺少的组成部分。本课题是设计一座日处理量为 6万m3的城市生活污水处理厂。其核心处理工艺选用的是卡鲁塞尔氧化沟工艺流程。污水在氧化沟中经曝气设备的搅动与活性污泥充分接触后,大部分的污染物被除去。最后出水达到国家的有关排放标准。本文设计介绍了该工艺的特点,并有相关的城市污水处理厂的工艺设计过程。
关键词:污水处理厂 工艺设计 氧化沟工艺 污泥处理
Abstract
The city sewage treatment plant is essential constituent of the modern urban development and the water resources conservation. This topic designs a city life sewage treatment plant which can treat 60,000 m3 sewage one day. Its core processing craft selects the Carrousel oxidation ditch technicalprocess. Sewage in oxidation ditch after aerator mixing and active sludgefull contact, most of pollutants of which are removed. Last, the water leakage achieved the country related discharges standard. This article introduceds the characteristic of this craft and supplies the correlated process of the city sewage treatment plant.
Key words: Sewage treatment plant Technological design Oxidation ditch craft Sludge processing
- 1 -
目录
第一章 设计概述 ............................................. - 4 -
1.1城市生活污水处理现状及发展 .................................................................... - 4 - 1.1.1 目前存在的问题 ................................................................................ - 4 - 1.1.2 今后的发展趋势 ................................................................................ - 5 -
1.2 毕业设计任务的主要内容(含主要技术参) ..................... - 5 -
1.2.1 污水处理厂服务范围及建设规模 .................................................. - 5 -
1.2.2 污水处理厂进水水质 ...................................................................... - 5 - 1.2.3 污水处理厂出水水质 ...................................................................... - 6 - 1.2.4 污水处理厂厂区概况 ...................................................................... - 6 - 1.3 毕业设计应完成的工作(含图纸数量) ................................................. - 7 -
1.3.1 毕业设计最终成果 .......................................................................... - 7 - 1.3.2 要求 .................................................................................................. - 7 - 1.3 设计目的 ..................................................................................................... - 7 -
第二章 工艺流程确定 ............................................ - 9 -
2.1 设计原则 ....................................................................................................... - 9 -
2.1.1 设计原则 ............................................................................................ - 9 - 2.1.2 设计依据 ............................................................................................ - 9 - 2.2 适合中小型污水处理厂的脱氮除磷工艺 ............................................... - 10 -
2.2.1 处理工艺大方案的比选 ................................................................ - 10 - 2.2.2 处理工艺小方案的比选 ................................................................ - 16 - 2.2.3 处理工艺流程 ................................................................................ - 19 -
第三章 处理系统构筑物计算 ..................................... - 25 -
3.1 进水井 ....................................................................................................... - 25 -
3.2 粗格栅 ....................................................................................................... - 25 - 3.3 提升泵房 ................................................................................................... - 29 - 3.4 细格栅 ....................................................................................................... - 30 - 3.5 曝气沉砂池 ............................................................................................... - 34 - 3.6 厌氧池 ......................................................................................................... - 38 - 3.7 卡鲁塞尔氧化沟 ......................................................................................... - 39 - 3.8 二沉池 ....................................................................................................... - 49 - 3.9 接触池 ....................................................................................................... - 56 - 3.10 计量槽 ..................................................................................................... - 58 - 3.11 污泥泵房 ................................................................................................... - 58 - 3.12 污泥浓缩池 ............................................................................................. - 60 - 3.13 储泥池 ..................................................................................................... - 62 - 3.14 污泥脱水间 ............................................................................................. - 63 -
- 2 -
第四章 水头损失确定 ........................................... - 65 -
4.1 废水处理水的高程布置计算 ..................................................................... - 65 -
4.1.1 管段选择及沿程损失的计算 .......................................................... - 65 - 4.1.2 污水管的弯头处局部损失的计算 .................................................. - 67 - 4.1.3 流过构筑物时水头损失的确定 ...................................................... - 68 - 4.1.4 总水头损失 ...................................................................................... - 68 - 4.2 污泥高程的计算 ......................................................................................... - 68 -
第五章 污水处理厂总体布置 ...................................... - 69 -
5.1 污水厂厂址选择 ......................................................................................... - 69 -
5.1.1 遵循原则 .......................................................................................... - 69 - 5.2 污水厂平面布置 ......................................................................................... - 70 -
5.2.1 污水处理厂平面布置原则 .............................................................. - 70 - 5.3 污水厂的高程布置 ..................................................................................... - 71 -
第六章 劳动定员 ............................................... - 72 -
6.1 生产组织 ..................................................................................................... - 72 -
6.2 劳动定员 ..................................................................................................... - 72 - 6.3 人员培训 ..................................................................................................... - 72 -
第七章 工程技术经济分析 ........................................ - 73 -
7.1 土建费用及主要设备材料费用 ................................................................. - 73 -
7.1.1 土建费用造价列表 .......................................................................... - 73 - 7.1.2 主要设备清单 .................................................................................. - 73 - 7.1.3 直接投资费用 .................................................................................. - 74 - 7.2 运行费用计算 ............................................................................................. - 74 -
7.2.1 成本估算 .......................................................................................... - 74 - 7.2.2 运行费用 .......................................................................................... - 75 - 7.2.3 工资福利开支 .................................................................................. - 75 - 7.2.4 生产用水水费开支 .......................................................................... - 75 - 7.2.5 运费 .................................................................................................. - 76 - 7.2.6 维护维修费 ...................................................................................... - 76 - 7.2.7 管理费用 .......................................................................................... - 76 - 7.2.8 运行成本核算 .................................................................................. - 76 -
第八章 环境保护 、建筑防火和职业安全防护 ....................... - 77 -
8.1 环境保护 ..................................................................................................... - 77 -
8.1. 污水 ............................................................................................................ - 77 - 8.2 厂区绿化 ..................................................................................................... - 77 - 8.3 建筑防火 ..................................................................................................... - 77 - 8.4 职业安全防护 ............................................................................................. - 78 -
参考文献(References) ......................................... - 78 - 致 谢 - 80 -
- 3 -
第一章 设计概述
1.1城市生活污水处理现状及发展
世界任何国家的经济发展,都会推进社会进步、促进工农业生产能力得到提高,使人民生活得到进一步改善,但是也随之带来不同程序的环境污染。污水也是造成环境污染的来源之一。这个污染源的出现引起了世界各国政府的关注,治理水污染环境的课题被列入世界环保组织的工作日程。中国政府历来重视环保治理工作,历届政府提出根治海河、三河三湖的治理的要求。由于各界政府的高度重视,我国的污水处理事业得到了长足的发展,但是我们要清醒的看到,我国工农业生产发展的步伐很快,特别是改革开放的20年乡镇企业的诞生使我国的企业结构发生了变化,有些企业在追求经济效益时忽视了社会、环境效益,若长此下去将带来环境受到严重污染的后患。为此当今环境污染的治理不能停留在各级政府的重视,而要深化到全民族每位公民环保意识的提高。我们不仅要达到经济发展了,生活水平提高了,还要做到经济与环境保护协调发展,生活的质量不断提高。为此我们要唤起民众为21世纪可持续发展目标的实现,为人类健康的生存,为子孙后代留下优质的环境而努力完成自己的责任。
1.1.1 目前存在的问题
1. 污水处理厂建设资金的短缺 2. 污水处理厂运行经费不能到位 3. 进口设备的维修及设备备件的开发
- 4 -
4. 污水处理工艺选择有一阵风的现象,不结合本地区的实际情况选热门艺
5. 污水处理后的再生水得不到充分的利用 6. 污泥没有真正达到无害化,没有最终处置的途径 7. 污水处理厂没有除臭装置
1.1.2 今后的发展趋势
1. 经济发展与污水处理事业协调发展 2. 扶植国内环保产业(污水处理行业)的发展
3. 多方筹资加速污水处理厂的建设,以最短的时间控制、治理已造成污染的水环境
4. 改变污水处理行业的运营机制,由事业型向企业经营型转变 5. 加强污水处理工艺选择机制,为各地区污水处理厂建设的工艺审查把关
6. 政府应给予污水处理行业优惠的政策 7. 再生水回用
8. 加大宣传力度,提高全民水的忧患意识
1.2 毕业设计任务的主要内容(含主要技术参) 1.2.1 污水处理厂服务范围及建设规模
本污水处理厂设计规模为6×104m3/d。其中,生活污水和工业废水所占比例为7:3。
1.2.2 污水处理厂进水水质
根据该污水处理厂工程可行性研究报告和环境影响报告书的批复,并
- 5 -