Subcontracting Costing Configuration
1. Sub-contracting is a special procurement, which is defined as F+30 in the material master.
1) The special procurement type is defined in the IMG
Special procurement type mainly includes: subcontracting, consignment, stock transfer etc
Below is the special procurement type 30
19 / 22
2. Specify that a material is sub-contracting material (special procurement type is 30), TCodeMM01
Please note that R-B100 is a semi-finished product, it should have BOM.
3.Define valuation method for sub-contracting(using OKKN). Valuation method is defined in costing variant. Below is the configuration of costing variant PPC1