河南老鸦岔金矿区泥石流灾害治理工程设计 - 图文(2)

2020-02-21 18:17

The Henan Laoyacha off the mining area mud-rock flow

disaster to govern the engineering design

SHI Qiang, Wang Wan-qian, Zhang Tian-zeng

(The first Geological Survey Branch,Henan Bureau of Geology and Mineral Resources Exploration and Development Luoyang,471023)

Abstract:TheLaoyacha gold mine mudslide niche is at the river south works properly Laoyacha

brain in treasure City on taking, the its mineral mountainous country quality environment problem is miniaturing of the whole little Qin Ling the gold mine area geology environment problem.This text only chooses to appease swollen mountain stream and mire stone be in transit of block the residue dam prevention and cure engineering to carry on elaborating.Pass to carry on comparing to choose to the different dam type structure project, recommend Wu work deeply water comb a Chi dam to choose a project for design, and to the discharge of Hong Feng, block the residue dam dam crest to overflow to flow over the discharge, block a residue dam stability to carry on to check calculate, completed to manage an engineering design.Should manage engineering to always invest 3,000,000 dollars, make the geology environment of the mineral mountain parts of districts can initial instauration, manage engineering to have the aggressive demonstration the function to the little Qin Ling Gong3 area environment.

Key words:Debris Flow ;manage ;block a residue dam;geology environment;model function

6


河南老鸦岔金矿区泥石流灾害治理工程设计 - 图文(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:上机实习2:超星数字图书馆

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: