新版CCNA 640-802例题分析
CCNA:640-802“例题”分析3(CCNA考生必看) 640-802-0002
1.This topology contains 3 routers and 1 switch. Complete the topology Drag the appropriate device icons to the locations labeled Device. Drag the appropriate connections to the locations labeled Connections
Drag the appropriate IP addresses to the locations labeled IP Address.(Hint : Use the given host addresses and the Prime router information given) To remove a device or connection,drag it away from the topology.
http://www.77cn.com.cne information gathered from the Prime router to complete the configuration of any additional routers. No passwords are required to access the Prime router . The config terminal command has been disabled for the HQ router.This router does not require configuration. Configure each additional router with the following