11、施工架体的搭设

11. erection of construction frame

12、配电箱及防护棚的标准化配置

12. Standard allocation of distribution boxes and protective sheds

37

13、危险品的独立设置

13. the independent setting of dangerous goods

38

14、钢筋、木工加工棚的设置

14. Installation of 14, steel bar, woodworking shed

15、单位工程标识牌的设置

15. installation of unit engineering signs

39

6.3 HSE作业人员岗前评价培训

6.3 Pre-job evaluation training for HSE operators

1、开工前,项目部对参加施工的人员主要人员(包括项目管理人员、HSE管理人员、焊工、机械操作手、司机、防腐工等)的工作经验、工作能力、资历等进行评价,合格后方可上岗,不合格者将接受培训。

1. Before starting work, the project department evaluates the work experience, working ability and qualifications of the main personnel (including project managers, welders, mechanical operators, drivers, anticorrosion workers, etc.) who participate in the construction. Qualified only after the post, not qualified will receive training.

2、培训目的

2. Purpose of training

为了提高员工HSE意识,丰富员工HSE知识,强化员工专业技能,从而达到能胜任本岗位工作的能力,认知本岗位的HSE风险、会运用HSE风险削减措施,积极参与紧急事件的应急反应行动,履行好自己的责任与义务,从而确保HSE目标的实现。

In order to improve the awareness of HSE, enrich the knowledge of HSE, strengthen the professional skills of the staff, so as to be able to be

40


HSE-中英-施工方案(8).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:《那些年,我们一起加过的班》小品剧本v2.1

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: