2017美赛MCM A题M奖获奖论文(5)

1970-01-01 08:00

VII. References

[1] Christine NORET,Jean-Christophe GIRARD,M.C. MUNODAWAFA et al.Kariba

dam on Zambezi river: stabilizing the natural plunge pool [J]. La Houille Blanche, 2013, 2013 (1) :34-41.

[2] E.F.R. BOLLAERT,M.C. MUNODAWAFA,D. Z. MAZVIDZA et al.Kariba Dam

Plunge Pool Scour:quasi-3D Numerical Predictions[J].La Houille Blanche,2013,2013(1):42-49.

[3] Paolo Ronco,Giacomo Fasolato,Michael Nones et al.Morphological effects of

damming on lower Zambezi River[J].Geomorphology,2010,115(1/2):43.

[4] Morphological effects of damming on lower Zambezi River[J]. Geomorphology,

2010, 115(1/2):43.

[5] Khan, Omar,Mwelwa-Mutekenya, Elenestina,Crosato, Alessandra et al. Effects of

dam operation on downstream river morphology: the case of the middle Zambezi River[J]. Proceedings of the Institution of Civil Engineers. Water management, 2014, 167 (10):585-600.

[6] Christopher H. D. Magadza.Kariba Reservoir: Experience and lessons learned

[J].Lakes & reservoirs: Research and management,2006,11(4):271-286.

[7] Financing approved for Kariba dam repairs[J].International journal on hydropower

& dams,2015,22(1):16-16.

[8] UN OCHA head warns of need to prepare for Kariba dam collapse[J].Water asset

management international,2014,10(2):1-1.

[9] Michael James Tumbare.Managing Lake Kariba sustainably: threats and

challenges[J].Management of Environmental Quality,2008,19(6):731-739.

[10] Nyatsanza, F. F.,Graas, S.,van der Zaag, P. et al.The Impact of Dynamic

Environmental Flow Releases on Hydropower Production in the Zambezi River Basin[J].Journal of the American Water Resources Association,2015,51(4):1029-1042.

[11] Technical audit consultant sought for Kariba rehabilitation[J].International

journal on hydropower & dams,2015,22(2):21-21.

[12] Chris Herold.Kariba Crisis?[J].Civil Eengineering,2014,22(5):25-28.

[13] Paolo Ronco,Giacomo Fasolato,Giampaolo Di Silvio et al.The case of the

Zambezi River in Mozambique: Some investigations on solid transport phenomena downstream Cahora Bassa Dam[C].//International Conference on Fluvial Hydraulics vol.1; 20060906-08; Lisbon(PT).2006:1345-4354.

[14] Ute Collier.The true cost of ignoring the World Commission on

Dams[J].International journal on hydropower & dams,2003,10(6):102-0.

[15] J.P. Matos,T. Cohen,J.-L. Boillat et al.Analysis of flow regime changes due to

operation of large reservoirs on the Zambezi River[C].//Environmental hydraulics. Volume 1. 2010: 337-342.

[16] DAMS AND CIVIL STRUCTURES[J].Hydro review worldwide:

HRW,2015,23(2):36-36.


2017美赛MCM A题M奖获奖论文(5).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:型钢悬挑式外脚手架的施工控制要点

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: