(22)机械挖土照明组

Kx = 1.00,Cosφ = 1.00,tgφ = 0 Pjs = Kx×Pe = 1.00× 1.00 = 1.00kW Qjs = Pjs×tgφ = 1.00× 0 = 0.00kVar

(23)警卫照明(1000W/km)组

Kx = 1.00,Cosφ = 1.00,tgφ = 0 Pjs = Kx×Pe = 1.00× 5.00 = 5.00kW Qjs = Pjs×tgφ = 5.00× 0 = 0.00kVar

(24)蛙式夯机组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 2.80 = 1.96kW Qjs = Pjs×tgφ = 1.96× 1.02 = 2.00kVar

(25)塔式起重机_QTZ63组

Kx = 0.30,Cosφ = 0.70,tgφ = 1.02 将Jc = 40%统一换算到Jc = 25%的额定容量

Pe = n×(Jc/Jc1)1/2×Pn = 1×(0.40/0.25)1/2×44.00 = 55.66kW Pjs = Kx×Pe = 0.30× 55.66 = 16.70kW Qjs = Pjs×tgφ = 16.70× 1.02 = 17.03kVar

(26)建筑施工外用电梯_SCD100/100A组 Kx = 0.30,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.30× 11.00 = 3.30kW Qjs = Pjs×tgφ = 3.30× 1.02 = 3.37kVar

(27)插入式振动器_ZX50组

Kx = 0.70,Cosφ = 0.68,tgφ = 1.08 Pjs = Kx×Pe = 0.70× 1.10 = 0.77kW Qjs = Pjs×tgφ = 0.77× 1.08 = 0.83kVar

(28)混凝土输送泵_HB-15组

Kx = 0.70,Cosφ = 0.68,tgφ = 1.08 Pjs = Kx×Pe = 0.70× 32.20 = 22.54kW Qjs = Pjs×tgφ = 22.54× 1.08 = 24.30kVar

(29)钢筋切断机组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29

6 / 59

河南四建股份有限公司 通许县产业聚集区30万㎡厂区2#、3#、4#楼临时用电施工组织

设计

Pjs = Kx×Pe = 0.70× 5.50 = 3.85kW Qjs = Pjs×tgφ = 3.85× 2.29 = 8.82kVar

(30)钢筋弯曲机组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 1.00 = 0.70kW Qjs = Pjs×tgφ = 0.70× 2.29 = 1.60kVar

(31)钢筋调直切断机_GT4/14组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 4.00 = 2.80kW Qjs = Pjs×tgφ = 2.80× 2.29 = 6.42kVar

(32)圆盘锯组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 5.00 = 3.50kW Qjs = Pjs×tgφ = 3.50× 1.02 = 3.57kVar

(33)灰浆搅拌机_UJ325组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 3.00 = 2.10kW Qjs = Pjs×tgφ = 2.10× 1.02 = 2.14kVar

(34)水泵组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 12.00 = 8.40kW Qjs = Pjs×tgφ = 8.40× 1.02 = 8.57kVar

(35)蛙式夯土机_HW-32组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 1.50 = 1.05kW Qjs = Pjs×tgφ = 1.05× 1.02 = 1.07kVar

(36)塔式起重机_QTZ63组

Kx = 0.30,Cosφ = 0.70,tgφ = 1.02 将Jc = 40%统一换算到Jc = 25%的额定容量

Pe = n×(Jc/Jc1)1/2×Pn = 1×(0.40/0.25)1/2×44.00 = 55.66kW Pjs = Kx×Pe = 0.30× 55.66 = 16.70kW Qjs = Pjs×tgφ = 16.70× 1.02 = 17.03kVar

(37)建筑施工外用电梯_SCD100/100A组

7 / 59

河南四建股份有限公司 通许县产业聚集区30万㎡厂区2#、3#、4#楼临时用电施工组织

设计

Kx = 0.30,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.30× 11.00 = 3.30kW Qjs = Pjs×tgφ = 3.30× 1.02 = 3.37kVar

(38)插入式振动器_ZX50组

Kx = 0.70,Cosφ = 0.68,tgφ = 1.08 Pjs = Kx×Pe = 0.70× 2.20 = 1.54kW Qjs = Pjs×tgφ = 1.54× 1.08 = 1.66kVar

(39)钢筋调直切断机_GT4/14组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 4.00 = 2.80kW Qjs = Pjs×tgφ = 2.80× 2.29 = 6.42kVar

(40)钢筋调直机组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 2.80 = 1.96kW Qjs = Pjs×tgφ = 1.96× 2.29 = 4.49kVar

(41)钢筋弯曲机_WJ40组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 3.00 = 2.10kW Qjs = Pjs×tgφ = 2.10× 2.29 = 4.81kVar

(42)交流电焊机_BX3-300-2组

Kx = 0.45,Cosφ = 0.45,tgφ = 1.98

将Jc = 40%统一换算到Jc = 100%的额定容量

Pe = n×(Jc/Jc1)1/2×Pn = 1×(0.40/1.00)1/2×10.53 = 6.66kW Pjs = Kx×Pe = 0.45× 6.66 = 3.00kW Qjs = Pjs×tgφ = 3.00× 1.98 = 5.95kVar

(43)圆盘锯组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 5.00 = 3.50kW Qjs = Pjs×tgφ = 3.50× 1.02 = 3.57kVar

(44)木工圆锯_MJ106组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 5.50 = 3.85kW Qjs = Pjs×tgφ = 3.85× 1.02 = 3.93kVar

8 / 59

河南四建股份有限公司 通许县产业聚集区30万㎡厂区2#、3#、4#楼临时用电施工组织

设计

(45)灰浆搅拌机_UJ100组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 2.20 = 1.54kW Qjs = Pjs×tgφ = 1.54× 1.02 = 1.57kVar

(46)水泵组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 1.50 = 1.05kW Qjs = Pjs×tgφ = 1.05× 1.02 = 1.07kVar

(47)钢筋室外加工照明组

Kx = 1.00,Cosφ = 1.00,tgφ = 0 Pjs = Kx×Pe = 1.00× 8.00 = 8.00kW Qjs = Pjs×tgφ = 8.00× 0 = 0.00kVar

(48)木材加工模板照明组

Kx = 1.00,Cosφ = 1.00,tgφ = 0 Pjs = Kx×Pe = 1.00× 8.00 = 8.00kW Qjs = Pjs×tgφ = 8.00× 0 = 0.00kVar

(49)警卫照明(1000W/km)组

Kx = 1.00,Cosφ = 1.00,tgφ = 0 Pjs = Kx×Pe = 1.00× 10.00 = 10.00kW Qjs = Pjs×tgφ = 10.00× 0 = 0.00kVar

(50)塔式起重机_QTZ63组

Kx = 0.30,Cosφ = 0.70,tgφ = 1.02 将Jc = 40%统一换算到Jc = 25%的额定容量

Pe = n×(Jc/Jc1)1/2×Pn = 1×(0.40/0.25)1/2×44.00 = 55.66kW Pjs = Kx×Pe = 0.30× 55.66 = 16.70kW Qjs = Pjs×tgφ = 16.70× 1.02 = 17.03kVar

(51)建筑施工外用电梯_SCD100/100A组 Kx = 0.30,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.30× 11.00 = 3.30kW Qjs = Pjs×tgφ = 3.30× 1.02 = 3.37kVar

(52)插入式振动器_ZX50组

Kx = 0.70,Cosφ = 0.68,tgφ = 1.08 Pjs = Kx×Pe = 0.70× 3.30 = 2.31kW

9 / 59

河南四建股份有限公司 通许县产业聚集区30万㎡厂区2#、3#、4#楼临时用电施工组织

设计

Qjs = Pjs×tgφ = 2.31× 1.08 = 2.49kVar

(53)钢筋调直机组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 2.80 = 1.96kW Qjs = Pjs×tgφ = 1.96× 2.29 = 4.49kVar

(54)钢筋切断机组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 5.50 = 3.85kW Qjs = Pjs×tgφ = 3.85× 2.29 = 8.82kVar

(55)钢筋弯曲机组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 1.00 = 0.70kW Qjs = Pjs×tgφ = 0.70× 2.29 = 1.60kVar

(56)交流电焊机_BX3-120-1组

Kx = 0.45,Cosφ = 0.45,tgφ = 1.98

将Jc = 40%统一换算到Jc = 100%的额定容量

Pe = n×(Jc/Jc1)1/2×Pn = 1×(0.40/1.00)1/2×4.05 = 2.56kW Pjs = Kx×Pe = 0.45× 2.56 = 1.15kW Qjs = Pjs×tgφ = 1.15× 1.98 = 2.29kVar

(57)钢筋调直切断机_GT4/14组

Kx = 0.70,Cosφ = 0.40,tgφ = 2.29 Pjs = Kx×Pe = 0.70× 4.00 = 2.80kW Qjs = Pjs×tgφ = 2.80× 2.29 = 6.42kVar

(58)灰浆搅拌机_UJ325组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 3.00 = 2.10kW Qjs = Pjs×tgφ = 2.10× 1.02 = 2.14kVar

(59)圆盘锯组

Kx = 0.70,Cosφ = 0.70,tgφ = 1.02 Pjs = Kx×Pe = 0.70× 5.00 = 3.50kW Qjs = Pjs×tgφ = 3.50× 1.02 = 3.57kVar

(60)木工圆锯_MJ104组

10 / 59


2#、3#、4#楼临时用电施工方案(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:三国演义阅读测试题(题目多有答案)

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: