年产 16 万吨炭黑及 30MW 尾气发电工程项目可行性研究报告

2018-12-29 17:49

可行性研究报告

年产16万吨某及30MW尾气发电工程项目

可行性研究报告

1

可行性研究报告

第一章 1.1 1.2 第二章 2.1 2.2 第三章 3.1 3.2 第四章 4.1 4.2 4.3 第五章 5.1

5.2

目 录

总论·········································1-1 至 1-11

概述·········································1-1 至 1-6

项目研究结论·································1-6 至 1-11

市场预测·····································2-1 至 2-8

国内外市场预测·······························2-1 至 2-6 产品价格分析·································2-6 至 2-8

产品方案及生产规模···························3-1 至 3-2

产品方案·····································3-1 至 3-1

生产规模·····································3-1 至 3-2

工艺技术方案·································4-1 至 4-8

工艺技术方案的选择···························4-1 至 4-3 工艺流程和消耗定额···························4-3 至 4-6 自控技术方案·································4-7 至 4-8

原料的供应和贮运·····························5-1 至 5-3

主要原料的品种、年需用量、来源及运输条件·····5-1 至 5-3 原料油的贮运·································5-3 至 5-3

2

可行性研究报告

第六章 建厂条件和厂址方案···························6-1 至 6-3

6.1 建厂条件·····································6-1 至 6-3

3

可行性研究报告

6.2 厂址方案·····································6-3 至 6-3

第七章 公用工程和辅助设施方案·······················7-1 至 7-8

7.1 总图运输·····································7-1 至 7-1

7.2 给水、排水···································7-1 至 7-2 7.3 供电及电讯···································7-2 至 7-3 7.4 7.5 7.6 7.7 7.8 第八章8.1 8.2 第九章9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 第十章10.1

采暖通风及空气调节···························7-4 至 7-5 生产装置压缩空气的供给·······················7-5 至 7-6 维修·········································7-6 至 7-6

土建(建筑物、构筑物)························7-6 至 7-8 生活福利设施·································7-8 至 7-8 节能·········································8-1 至 8-2

单位产品能耗水平·····························8-1 至 8-1 节能降耗的措施和效果·························8-1 至 8-2 环境保护·····································9-1 至 9-11

厂址与建厂地区环境现状·······················9-1 至 9-2 报告采用的环境保护标准·······················9-2 至 9-3 污染物的排放标准·····························9-3 至 9-4 新建 16 万吨/年某装置污染物的排放情况·······9-4 至 9-6综合利用与治理方案···························9-6 至 9-10 环境保护投资概算·····························9-10 至 9-10 存在的问题及建议·····························9-10 至 9-10 附表·········································9-11 至 9-11

消防与职业安全卫生··························10-1 至 10-5

消防········································10-1 至 10-3

4

可行性研究报告

10.2 职业安全卫生································10-4 至 10-5

第十一章 工厂组织、劳动定员和人员培训··············11-1 至 11-2

11.1 工厂组织··································11-1 至 11-1 11.2 生产制度及定员····························11-1 至 11-1 11.3 人员来源及培训····························11-2 至 11-2 第十二章12.1 12.2 第十三章第十四章14.1 14.2 14.3 第十五章15.1 15.2 15.3 15.4 15.5 15.6 15.7 第十六章16.1 16.2

项目实施规划······························12-1 至 12-2

项目前期准备工作··························12-1 至 12-1 实施进度规划······························12-1 至 12-2 2×15KW 某尾气发电工程···················13-1 至 13-18

投资估算及资金筹措························14-1 至 14-3

投资估算··································14-1 至 14-3 资金筹措··································14-3 至 14-3 总投资····································14-3 至 14-3 财务评价··································15-1 至 15-7

概述······································15-1 至 15-1 总成本费用估算····························15-1 至 15-3 销售收入计算······························15-3 至 15-3 税收及利润分配····························15-3 至 15-4 盈利能力分析······························15-4 至 15-4 清偿能力分析······························15-4 至 15-4 不确定性分析······························15-5 至 15-7 结论······································16-1 至 16-1

综合评价··································16-1 至 16-1 结论······································16-1 至 16-1

5


年产 16 万吨炭黑及 30MW 尾气发电工程项目可行性研究报告.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:XX银行消费者权益保护工作自评报告

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: