检验合格
6、 进风准备巷一部溜子(44kw)处短路电流Id5计算: 敷设电缆的巷道长度:
1503二配至出煤巷掘进动力460m, 选用二根MYP 0.66/1.14 3×95+1×35电缆 出煤巷掘进动力至皮带机开关30m,
选用二根MYP 0.66/1.14 3×70+1×25电缆
专用回风巷皮带机开关至进风准备巷一部溜子开关220m
选用一根MYP 0.66/1.14 3×70+1×25和一条MYP 3×50+1×16电缆 溜子开关至电机10m,选用一根MYP 0.66/1.14 3×16+1×10电缆 折算后电缆长度:
LH=(0.53×460×2+0.73×30×2+0.73×220+1×220+3.01×10 )×1.1=(487.6+43.8+160.1+220+30.1)×1.1 =941.6×1.1=1035.8m=1.0358km
查《煤矿电工手册》3×50电缆的电阻、电抗值为: R0=0.491Ω/km X0=0.081Ω/km RZ1=0.491×1.0358=0.50858Ω
XZ1=0.081×1.0358=0.083899Ω
∑R=0.0101+RZ1=0.0101+0.50858=0.51868Ω ∑X=0.01001+XZ1=0.01001+0.083899=0.0939Ω
Id2(2)=Ue/2√(∑R)2+(∑X)2=690/2×√(0.518682+0.09392) =690/2×√0.26903+0.008819=690/2×0.5271 =690/1.018=677.8.A
灵敏系数校验:
)
K=Id(2(短路电流)/I(电机额定电流)=677.8/63.2=10.72>1.5 检Z
验合格
7、进风顺槽皮带机电机处短路电流Id5计算:
第 36 页 共 41 页 继电保护整定计算专用纸
敷设电缆的巷道长度:
1503二配至出煤巷掘进动力460m,
选用二根MYP 0.66/1.14 3×95+1×35电缆 出煤巷掘进动力至皮带机开关30m,
选用二根MYP 0.66/1.14 3×70+1×25电缆 专用回风巷皮带机开关至进风准备巷一部溜子开关220m
选用一根MYP 0.66/1.14 3×70+1×25和一根 3×50+1×16电缆 进风准备巷一部溜子开关至二部溜子开关20m 选用二根MYP 0.66/1.14 3×50+1×16电缆 二部溜子开关至三部溜子开关50m
选用一根MYP 0.66/1.14 3×95+1×35电缆 三部溜子开关至皮带机开关10m
选用一根MYP 0.66/1.14 3×70+1×16电缆
皮带机开关至电机10m选用一根MYP 0.66/1.14 3×10+1×16电缆 折算后电缆长度:
LH=(0.53×460×2+0.73×30×2+0.73×220+1×220+1×20×2+0.53×50+0.73×10+4.75×10×22)×1.1=(487.6+43.8+160.1+220+40+26.5+7.3+47.5)×1.1=1080.3×1.1=1188.3m=1.183km 查《煤矿电工手册》3×50电缆的电阻、电抗值为: R0=0.491Ω/km X0=0.081Ω/km RZ1=0.491×1.183=0.5808Ω
XZ1=0.081×1.183=0.0958Ω
∑R=0.0101+RZ1=0.0101+0.5808=0.5909Ω ∑X=0.01001+XZ1=0.01001+0.0958 =0.10581Ω
Id2(2)=Ue/2√(∑R)2+(∑X)2=690/2×√(0.59092+0.105812)=690/2×√0.3492+0.011196=690/2×0.6002 =690/1.2004=574.8A
第 37 页 共 41 页 继电保护整定计算专用纸
灵敏系数校验:
K=Id(2)(短路电流)/IZ(电机额定电流)=574.8/50.6=11.36>1.5 检验合格
8、进风顺槽溜子电机出短路电流Id5计算: 敷设电缆的巷道长度 :: 1503二配至出煤巷掘进动力460m,
选用二根MYP 0.66/1.14 3×95+1×35电缆 出煤巷掘进动力至皮带机开关30m,
选用二根MYP 0.66/1.14 3×70+1×25电缆
专用回风巷皮带机开关至进风准备巷一部溜子开关220m 选用一根MYP 0.66/1.14 3×70+1×25和一根 3×50+1×16 进风准备巷一部溜子开关至二部溜子开关20m 选用二根MYP 0.66/1.14 3×50+1×16电缆 二部溜子开关至三部溜子开关50m
选用一根MYP 0.66/1.14 3×95+1×35电缆 三部溜子开关至皮带机开关10m
选用一根MYP 0.66/1.14 3×70+1×16电缆 皮带机开关至进风顺槽溜子开关900m 选用一根MYP 0.66/1.14 3×35+1×16电缆
进风顺槽溜子开关至电机10m选用一根MYP 0.66/1.14 3×25+1×16电缆 折算后电缆长度:
LH=(0.53×460×2+0.73×30×2+0.73×220+1×220+1×20×2+ 0.53×50+0.73×10+1.37×900+1.91×10 )×1.1
=(487.6+43.8+160.1+220+40+26.5+7.3+1233+19.1)×1.1 =2237.4 ×1.1=2461.1m=2.461km
查《煤矿电工手册》3×50电缆的电阻、电抗值为: R0=0.491Ω/km X0=0.081Ω/km
第 38 页 共 41 页 继电保护整定计算专用纸
RZ1=0.491×2.461=1.208Ω
XZ1=0.081×2.461=0.1993Ω
∑R=0.0101+RZ1=0.0101+1.208=1.2181Ω ∑X=0.01001+XZ1=0.01001+0.1993=0.20935Ω
Id2(2)=Ue/2√(∑R)2+(∑X)2=690/2×√(1.21812+0.209352)=690/2×√1.4838+0.04383=690/2×1.236 =690/2.472=279.13A
灵敏系数校验:
K=Id(2)(短路电流)/IZ(电机额定电流)=279.13/50.6=5.52>1.5 检验合格
9、150310进风顺槽最远端潜水泵电机(13kw)处短路电流Id5计算: 敷设电缆的巷道长度: 1503二配至出煤巷掘进动力460m,
选用二根MYP 0.66/1.14 3×95+1×35电缆 出煤巷掘进动力至皮带机开关30m,
选用二根MYP 0.66/1.14 3×70+1×25电缆
专用回风巷皮带机开关至进风准备巷一部溜子开关220m
选用一根MYP 0.66/1.14 3×70+1×25和一根MYP 3×50+1×16 进风准备巷一部溜子开关至二部溜子开关20m 选用二根MYP 0.66/1.14 3×50+1×16电缆 二部溜子开关至三部溜子开关50m
选用一根MYP 0.66/1.14 3×95+1×35电缆 三部溜子开关至皮带机开关10m
选用一根MYP 0.66/1.14 3×70+1×16电缆 皮带机开关至进风顺槽溜子开关900m
选用一根MYP 0.66/1.14 3×35+1×16电缆 进风顺槽溜子开关至探水钻开关4m
选用一根MYP 0.66/1.14 3×25+1×16电缆
第 39 页 共 41 页 继电保护整定计算专用纸
探水钻开关至潜水泵开关6m选用一根MYP 0.66/1.14 3×16+1×10电缆 潜水泵开关至电机10m选用一根MYP 3×6+1×6电缆 折算后电缆长度:
LH=(0.53×460×2+0.73×30×2+0.73×220+1×220+1×20×2+ 0.53×50+0.73×10+1.37×900+1.91×4+3.01×6+8.11×10)×1.1 =487.6+43.8+160.1+220+40+26.5+7.3+1233+7.64+18.1+81.1 =2325.14×1.1=2557.7m=2.5577km
查《煤矿电工手册》3×50电缆的电阻、电抗值为: R0=0.491Ω/km X0=0.081Ω/km RZ1=0.491×2.557=1.2555Ω
XZ1=0.081×2.557=0.0.2071Ω
∑R=0.0101+RZ1=0.0101+1.2555=1.2656Ω ∑X=0.01001+XZ1=0.01001+0.2071=0.2171Ω
Id2(2)=Ue/2√(∑R)2+(∑X)2=690/2×√(1.26562+0.21712)=690/2×√1.6017+0.04713=690/2×1.284 =690/2.568=268.69A
灵敏系数校验:
K=Id(2)(短路电流)/IZ(电机额定电流)=268.69/14.9=18.03>1.5 检验合格 三、接地系统
1、井下保护接地系统是由主接地极、局部接地极、接地母线、接地导线和接地引线等组成。
2、36V以上和由于绝缘置换可能带有危险电压的电气设备的金属外壳,构架等必须有保护接地。信号综保设一处辅助接地极。
2、通过高低压电缆,将工作面所有电气设备外壳,包括五小电器外壳连接起来,并利用接地母线、连接导线与主接地极、辅助接地极、局部接地极可靠连接起来,形成一个接地保护网,保证任何一处接地电阻不大于2欧姆。
第 40 页 共 41 页 继电保护整定计算专用纸
3、回风顺槽掘进巷道内至少应分别设置一个局部接地极。局部接地极可设置于巷道水沟内或其他就近的潮湿处。设置在水沟中的局部接地极应用面积小于0.6m2,厚度不小于3mm的钢板或相同有效面积的钢管制成。并应平放于水沟深处;设置在其他地点的局部接地极,可用直径不小于35mm,长度不小于1.5m的钢管制成,管上至少钻20个直径不小于5mm的透眼,并垂直埋入底下。
四、信号系统
相邻两设备间有可靠的语音声光信号。照明信号综合保护装置选择一台ZXZ-4.0/660MA型照明信号综合保护装置,放置于1503出煤巷和动力总开相邻
五、漏电保护措施
一、 变压器中性点不直接接地供电系统的漏电保护措施。
1、装设灵敏可靠的漏电保护装置(漏电继电器)并与屏蔽电缆配合使用,提高工作可靠性。
2、采用保护接地装置。
3、对电网对地电容电流进行有效的补偿,减小漏电电流值。 4、提高漏电保护装置和自动馈电开关的动作速度,采用超前切断电流装置等。
二、对低压电网漏电保护的要求
1、正常情况监视电网的绝缘状态,当绝缘电阻降低到下列数值时,应切断供电电源; 660v电网——相对地绝缘电阻为11kΩ.
2、动作迅速。
3、检漏继电器监视电网对地的绝缘电阻值,不反应电容大小。
4、电网的绝缘电阻值无论是对称下降还是不对称下降,动作电阻值不变。
5、检漏继电器内部阻抗值应很大,正常时保证电网对地的绝缘,不增加人身触电的危险
6、动作灵敏可靠,既不拒绝动作也不误动作。 7、检漏继电器的动作电阻不受电网波动的影响。 8、对电网对地电容电流能够进行有效补偿。
9、送电前,发现漏电,应该将电源开关闭锁,以防向故障电网送电。 10、动作要有选择性,以便缩小故障范围。
第 41 页 共 41 页 继电保护整定计算专用纸