议工程造价预结算存在的问题及改善措施

2019-02-15 17:31

议工程造价预结算存在的问题及改善措施

摘要:随着经济的快速发展,现代化管理理念在我国企业中得到广泛的应用。在建筑行业的现代化管理中,工程的预结算管理是工程造价管理的重要内容之一。工程预结算的管理直接关系到工程项目造价工作的进展和效果、工程的进度和工程质量,以及工程项目的经济效益和社会效益,因此强化工程造价预结算的质量控制是十分必要的。本文简要分析当前造价预结算工作中存在的问题,以及改善的措施。

关键词:工程造价;预结算;问题;措施

Abstract: With the rapid development of economy, modern management concept has been widely applied in the enterprises of our country. Modern management in the construction industry, the settlement management of project is one of the important contents of the project cost management. Is directly related to the project cost work progress and effect, project progress and project quality management, project budget, and project economy benefit and social benefit, so to strengthen the quality control of the engineering cost is very necessary. This paper briefly analyzes the current cost problem in the work, and the improvement measures.

Keywords: engineering cost; budget; problems; measures

引言

当前预结算管理中存在的问题 近年来,工程造价预结算管理已经取得了很大的发展,基本实现了预结算管理的科学化和现代化。但是,在实际进行预结算管理工作时还是出现了一些问题和弊端,需要改进和完善。

1.1 缺乏健全的管理组织。

当前,我国工程预决算工作普遍存在着缺乏健全的管理组织的问题。由于建筑工程的造价预结算管理工作内容含量大且较为复杂,需要的工作人员较多,这就需要建立一个组织机构来进行监督管理。另外,部分工程项目为节省项目资金,大量压缩管理人员的数量,这也是管理组织难以建立起来的重要原因,导致管理制度的制定和落实不能得到全面的保障。

1.2 招投标制度不完善

实行招投标的制度,是将竞争机制引入建筑市场,符合社会主义市场经济的内在要求。招投标制度是工程预结算工作的前提和基础,它对规范市场行为、避免腐败滋生起到了很好的作用。但是我国现阶段的招投标制度还不完善,规避招标、不合理分标、串标、行业封锁等现象时有发生,让招投标制度成为一种表面


议工程造价预结算存在的问题及改善措施.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:2009年3月到2010年8月思想汇报

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: