基层作业队岗位责任制
should be equal to that of drilling string to be pulled out. Otherwise, stop POOH immediately, analyze the causes and take proper measures.
起钻及时灌泥浆,灌入的泥浆体积必须与起出钻具的体积相等,如灌入泥浆量小于起出钻具体积,应及时停止起钻,分析原因并采取措施;
3) While RIH, if the volume of drilling string being run into the hole is smaller than
that of returned mud, stop RIH immediately, analyze the causes and take proper measures.
下钻中,下入钻具的体积小于排出泥浆的体积,应及时停止下钻,分析原因并采取措施;
4) While drilling, if the volume of returned mud is larger than that of mud pumped in,
stop drilling at once, analyze the causes and take proper measures. If there is mud flowing out of empty well without any drill string inside it, it seems that a kick is occurring.
钻进中,泥浆排出量大于泵入量,应及时停止钻进,分析原因并采取措施;空井,出口流出泥浆视为溢流。
第 31 页 共 93 页
基层作业队岗位责任制
5. HSE岗位作业指导卡
岗位名称:司钻 持卡人: 素质要求 岗位要求 技能资质 年龄45岁以下,具有石油钻井工程及相关专业高中及以上学历。 持有岗位合格证书及资格证书、持有井控操作合格证书和HSE培训合格证书等。 熟悉钻井工艺和钻井设备工具的操作及维护保养,具有5年以上钻井现场工作经验,其中从事电驱动钻机司钻工作2年以上、有顶驱操作经验者优先。基本具备外语口语交流能力。 向本班带班队长负责 负责本班员工的技术教育,按时召开班前班后会,安排检查各岗工作;带领全班认真完成班作业计划,遵守操作规程,安全优质完成各项生产任务,确保人身、井下和设备安全。 有权拒绝一切违章指挥、违章作业。 按HSE作业指导书中的规定的程序执行。 保证工作质量,安全第一,确保井下、设备、人身安全。 夜间作业尤其注意安全 碰天车、绞车失去刹车、遇卡、溢流等。 按应急预案中有关本岗位的责任执行。 按有关规定执行 按有关规定执行 工作经历 对上向谁负责 岗位对下负责什么 职责 权利和义务 工作程序 操作工作要求 指南 注意事项 风险岗位风险 应急 应急责任 奖励 考核 处罚
第 32 页 共 93 页
基层作业队岗位责任制
5. Post instruction card
title:driller card owner: Quality Under the age of 45, at least a secondary specialized degree in well drilling engineering or relevant. Have a qualified post license, IADC or IWCF certificate , HSE certificate. Basic oral English skills. Familiar with drilling technology &drilling equipment, minimum 5 years working experience on the well site, at least 2 years as a driller, preferably top drive and electric driven rig working experience. Be responsible to toolpusher To give tour members the occupational ethic and drilling technology training. Hold pre-job and after-job meeting. Designate everyone the specific job and guide everyone to complete drilling operation to achieve the nondamage of personnel, borehole and equipment as per drilling procedure. Never force yourself and the others to do something against HSE procedure. Have the right to refuse any instruction against HSE procedure. Technical ability requirement Working experience Responsible to Job responsibilities In charge of Right and obligation Work procedures Perform the post duty as per HSE procedures. Operation guideline Ensure drilling operation to be done in high standard. Always Work requirement keep safety at the first place and prevent personnel, borehole and equipment from any accident. Attention Emergency response for risks Duty risk Responsibilities Praise assessment punish Many. Pay closer attention to drilling operation at night Collide crown block, lose control of drawwalk brake, sticking and well kick. To perform his own duties as stipulated in the emergency response plan. As per the award and punishment discipline of GWDC Drilling Branch Co., the relevant project team and rig. As per the award and punishment discipline of GWDC Drilling Branch Co., the relevant project team and rig.
6. Reports and forms 记录报表
6.1 Driller hand-over record each tour
司钻交接班记录 每班
第 33 页 共 93 页
基层作业队岗位责任制
副司钻岗位职责Assistant Driller 第1版第1次修改 2007年06月发布 1.Post duties岗位职责:
1) Strictly implement and perform GWDC HSE policy and practice.
严格执行公司的规章制度,遵守和执行本岗位的HSE 规定。
2) To obey orders from tool-pusher and driller. To be ready for filling in driller
position in case that the driller is absent.
听从带班队长和司钻的指令。当司钻不在时,顶替司钻工作。
3) To clean, operate and maintain mud pump and high pressure manifold&line. To
operate, maintain supercharge pump, mixing pump and tripping pump in the mud system.
清理、操作和维护泥浆泵和泥浆高压管汇系统。操作和维护泥浆系统灌注泵、混合泵和补给泵等设备。
4) To check mud pump running condition (noise, temperature etc) and its lubrication,
also screen, super-charge pump, suction line, high-pressure discharge lines, safety pop-off valve, pulsation dampener, drive belts and covers.
检查泥浆泵的运行情况(噪音、温度等)、润滑情况等,包括:筛网、灌注泵、吸入管线、排出管线、安全阀、空气包、驱动皮带和护罩等。
5) Ensure mud high-pressure manifold and valves are hooked up properly. All
connections are tight and secured. 高压管汇和阀门,确保连接完好。 6) Check mud property records and mud volume sensor.
泥浆性能记录和泥浆液面传感器。
7) Check valves and volume on the mud reserve tank.
检查泥浆储备罐的阀门和容积量。
8) To keep mud pump area, mud tank area and water tank area clean and tidy.
保持泥浆泵、泥浆罐、水罐区域干净、整齐。
第 34 页 共 93 页
基层作业队岗位责任制
9) To fill in forms for mud pump, mixing pump, feeding pump, transfer pump,
high-pressure manifold correctly and completely.
正确、全面地填写泥浆泵、混合泵、供液泵、转液泵、高压管汇的使用记录。 10) To clean, maintain remote control unit and the other accessory equipment or
tools.
清理、维护防喷器远程控制以及其它附属设备和工具。
11) To be in charge of keeping all of the equipment, tools in mud pump area against
any loss or damage.
负责泥浆泵区域的设备和工具免受丢失和损坏。
12) Help the driller to hold different meetings in the drilling tour and make records.
协助司钻开好班组各种会议并做好记录。 13) Check the working condition of fire fighting unit.
检查、落实消防设施的工作情况。
2. Tour inspection route and checking points巡回检查路线及要点
1) BOP and Koomey unit→mud circulation system→mud pump (in good condition,
well lubricated&cleaned, spare parts supply, maintenance card)→air compressor with nitrogen→geology unit(formation, lithology, drilling log)→dog house 井口防喷器和远程控制系统装置→循环系统→泥浆泵(运转正常;润滑、清洁、备用件、工具齐全、保养牌填写规范)→充氮压风机→地质室(层位、岩性、钻时记录)→值班房。
3.Tour handover rules交接班制
1) Arrive at the well site half an hour in advance to perform pre-tour inspection as
per post inspection route and point out the existing problems to be corrected to on-duty employees.
提前半小时到井场,按岗位巡回检查路线进行检查,向当班人员提出待整改的问题。 2) Arrange pre-job and after-job meeting. Be on-duty in time.
参加班前会后,在岗位上正点交接班。
3) The items to be handed-over: well depth, hook load, drilling parameters,
formation, lithology, mud properties and down hole condition, drilling tools to be
第 35 页 共 93 页