餐厨垃圾处理 PPP 项目财务评价研究第5章(2)

2019-03-10 12:19

Calculation of the Profit Rate[C]// International Conference on Ecosystems and Sustainable Development. 2011:1129-36.

[45] Xu X, Bureau T F. Research on the Financial Investment Audit Risk Management

of PPP Project[J]. State Academy of Forestry Administration Journal, 2016. [46]Jeerangsuwan T, Said H, Kandil A, et al. Optimization Application for Financial Viability Evaluation of PPP Toll Road Projects[M]// Construction Research Congress 2012. 2012:2329-2338.

[47] Jeerangsuwan T, Said H, Kandil A, et al. Optimization Application for Financial

Viability Evaluation of PPP Toll Road Projects[C]// Construction Research Congress. 2012:2329-2338.

[48] Kurniawan F, Mudjanarko S W, Ogunlana S. Best Practice for Financial Models of

PPP Projects ☆[J]. Procedia Engineering, 2015, 125:124-132.

[49] Tao P, Ji W. Cost-Benefit Analysis of PPP Project Financing Based on the

Government’s Position[C]// International Conference on Construction and Real Estate Management. 2015:792-797.

[50] Patrinicola S. Financial valuation within the context of Project Financing and

PPP[J]. Luiss Guido Carli, 2010.

[51] Ismail K, Takim R, Nawawi A H. The evaluation criteria of Value for Money (VFM)

of Public Private Partnership (PPP) bids[C]// International Conference on Computer Communication and Management(icccm. 2011.

[52] Sotirchos A, Karmperis A C, Aravossis K G, et al. Financial Sustainability of the

Waste Treatment Projects that follow PPP contracts in Greece: a Formula for the Calculation of the Profit Rate[C]// International Conference on Ecosystems and Sustainable Development. 2011:1129-36.

[53] Bai L, Li Y, Du Q, et al. A Fuzzy Comprehensive Evaluation Model for

Sustainability Risk Evaluation of PPP Projects[J]. Sustainability, 2017, 9(10):1890. [54]Yan L I, Zhao L, Management S O. An Empirical Study on Building Risk Evaluation System of the PPP Project under the Background of New Urbanization——A Case Study of Shanghai Xinzhuang CCHP Project[J]. Reform of Economic System, 2015.

71

[55] Wang X, Sun Y, Gao Y. Factors Influencing the Financial Efficiency of PPP Projects

and Their Relations Based on DEMATEL[J]. 2015.

[56] Wei L, Yun T. Real Estate Project Financial Evaluation Based on Cash Flow

Estimation[J]. Open Construction & Building Technology Journal, 2015, 9(1):135-141.

[57] Huang X. Cost-Volume-Profit Analysis and Financial Evaluation on Straw Biogas

Project for Central Gas Supply[J]. China Biogas, 2016.

[58] Zhang J, Wang Y. Financial Evaluation System of PV Project[J]. Economic

Research Guide, 2015.

[59] Wang D, Ming M A, Xiao N. Research on the benchmark yield and risk analysis

method for the financial evaluation of railway construction project[J]. Railway Economics Research, 2015.

[60] Kim E, Hewings G J D, Amir H. Project Evaluation of Transportation Projects: an

Application of Financial Computable General Equilibrium Model[C]// ERSA conference papers. European Regional Science Association, 2015.

[61] Zhai S. Audit of the Financial Evaluation of Construction Project[J]. Engineering

Economy, 2015.

72

致 谢

时光飞逝,岁月如梭,研究生生涯即将结束,在研究生期间,需要感谢和感恩的太多。首先,要感谢我的导师。这篇论文从开题到最后定稿,从分段立章到整体结构,凝聚了她很多的心血。论文一次次的修改过程中,导师都悉心指导, 希望可以臻于完善,使我深深体会到了她严谨认真的治学作风和春风化雨的育人之道,明白了论文和做人的道理,这将使我在未来的工作和学习过程中受益匪浅。

其次,要感谢学校的其他老师和我的同学们,她(他)们给了我许多的帮助, 使我的论文可以比较顺利地完成。

再次,要感谢我的家人,是她们无私的奉献和默默的支持使我比较圆满地完成研究生阶段的学业,为我以后的人生路打下一个良好的基础。

最后,要感谢各位在临答辩的老师,谢谢你们的指导。

73


餐厨垃圾处理 PPP 项目财务评价研究第5章(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:2011年贵州《行政职业能力测试》试卷及详细解析

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: