11
Range Planning,2003,36:337-353.
[13]Patrick
T.I.Lam.Asartorial
review
of
risks
associated
with
major
infrastructure
Projects.International Journal of Project Management,1999,17:77-87.
[14]Darrin Grimsey,Mervyn K.Lewis.Evaluating the risks of public-private partnerships for infrastructure projects.International Journal of Project Management,2002,20:107-118.
[15]A.Ucbechukwu.Elinwa and Silas A.Buba Construction cost factors in Nigeria[J].Journal of construction engineering and Management,Vol.119No.4.1993:698-713.
[16]L.Y.Shen project risks Management in Hong Kong Intemational[J].Journal of project Management,Vol.15 No.5.1997:101-105.
[17]Arndt RH.Risk Allocation in the Melbourne City Link Pro-ject[J].Project Finance,1998,4:11-24. [18]Li B.Risk Management of Public/Private Partnership Pro-jects.Un-published PhD Thesis[M].School
of
the
Builtand
Natural
Environment.Glasgow
Caledonian
University.Glasgow,Scotland.2003.
[19]Li
Bing,A.Akintoye,Peter
J.Edwards,and
C.Hardcastle,The
allocation
of
risk
in
PPP/PFIConstruction projects in the UK,in International Journal of Project Management.2005,Elsevier Ltd,Oxford,OX5 1GB,United Kingdom.
[20]Li-Yin Shen,Andrew Platten,X.P.Deng Role of public private partnerships to manage risks in publicsector projectsin Hong Kong[J].International Journal of Project Manage-ment 24(2006):587-594.
[21]Martinus P.Abednego,Stephen O.Ogunlana Goodproject governance for proper risk allocation in public pri-vate partnerships in Indonesial[J]International Journal of Project Management 24(2006)622-634.
[22]Loosemore
M,Raftery
J,Reilly
C,Higgon
D.Risk
management
in
projects[J].London:Taylor&Francis,2006.
[23]Grimsey D,Lewis KK.Public private partnerships[J].Chelt-man,UK:Edward Elgar;2004. [24]Zhang
X
Q.Kumaraswamy
M.Procurement
protocols
for
public-private
parterner
projects[J].Journal of Construction Engineering and Management,2001,126(3):172.
[25]Zhang X Q,Kumara swamy M M Zheng W Concessionaire selection for Build Operate-Transfer tunnel projects in Hong Kong[J].Journal of Construction Engineering and Management,2002,128(2):156-164.
[26]Frederick A.Entrepreneurial risk allocation in public-private infrastructure provision in
12
SouthAfrica[J].South A frican Journal of Business Management,2002,33(4):29-40.
[27]Lemos T,Eaton D,Betts M.Risk management in the Lusoponte concession-a case study of the two bridges in Lisbon,Portugal[J].International Journal of Project Management.
[28]World Development Report1994:infrastructure for development[R].World Bank.1994(06). [29]Dr
Paul
H
K
Ho.Development
of
Public
Private
Partnerships(PPPs)in
China[R].TheHongKongInstituteofSurveyors.2004.
[30]Pauline Vaillaneourt、Rosenau.Public Private Poliey Partnerships[M].Cambridge.MIT Press.2000.
[31]World Development Report 1994:infrastrueturefor.
[32]孙建平,李胜.蒙特卡洛模拟在城市基础设施项目风险评估中的应用[J].上海经济研究,2005. [33]张星,孙建平,李胜.BOT项目风险的模糊综合评价[J].上海财经研究,2004(10). [34]刘新平,王守清.论PPP项目的风险分配原则和分担框架[J].建筑经济,200(2). [35]刘子卫.工程风险及风险分担机制探讨[J].经济论坛,2007,18:59-61.
[36]宋志东.BOT融资中的风险分担及合同管理[J].吉林省经济管理干部学院学报,2004,18:28-31. [37]李秀辉,张世英.PPP:一种新型的项目融资方式[J],中国软科学,2002(2):51-54. [38]王丽娅.PPP在国外基础设施投资中的应用及对我国的启示[J].海南金融,2003(11):36-40. [39]王周喜,张勇.P即融资模式在西部基础设施建设中的可行性分析[J].西北农林科技大学报,2003,3(2):106-110.
[40]李秀辉、张世英.PPP与城市公共基础设施建设[J].城市规划,2002,26(7):74-76
[41]杨斌武,杨基成,蒋文举.试论通过即P模式处理我国城市垃圾[J].中国人口.资源与环境,2003,13(2):101-105.
[42]李晓宇,张文桂.借鉴即P模式对高校教学公共设施建设及管理的探索[J].实验技术与管理,2005,22(6):112-115.
[43]刘志强,郭彩云.基础设施建设项目引入P即融资方式探讨[J].建筑经2005(6):40-42.
[44]王颧.加快PPP模式的研究与应用,推动轨道交通市场化进程[J].宏观经济研究,2004(1):47-49. [45]刘雷.即P(公私协作)在北京轨道交通建设运营中的应用研究[博士学位论文].北京:对外经济贸易大学,2005.
[46]宋志东.BOT融资中的风险分担及合同管理[J].吉林省经济管理干部学院学报,2004,18:28-31. [47]彭桃花,赖国锦.PPP模式的风险分析与对策[J].中国工程咨询,2004,7:11-13. [48]李永强,苏振民.PPP项目风险分担的博弈分析[J].基建优化,2005,26:16-21.
13
[49]程述,谢丽芳.工程项目风险分担模型探讨[J].工程项目管理,2006,11:93-96. [50]刘江华.项目融资风险分担研究[J].工业技术经济,2006,258.
[51]刘新平、王守清.试论PPP项目的风险分配原则和框架[J].建筑经济,2006,2:59-63. [52]刘子卫.工程风险及风险分担机制探讨[J].经济论坛,2007,18:59-61.
[53]涂铭,汪霄.PPP项目风险因素和承担机制研究J].基建优化,2007,28:25-28.