-0.24) ×2]×0.24×0.18 =(79.12+21.42+31.56+14.52) ×0.043 =6.305 V圈=6.305-0.125 =6.18 m3
序项目号 1 名称 2三~六层圈梁(QL)截面240×300 2三~六2 层圈梁(QL) 截面240×180 2混凝 V= V总- V洞- V柱 3 土墙外墙 240厚 V总=墙长×墙高×墙厚 =124.8×11.2×0.24 =335.462 L中=(45.24-0.24)×2+(11.04-0.24)×2+3.3×4 =124.8 V柱=0.24×0.24×11.2×(23+8) =19.999 V洞=[(1.8×2.5×6+1.5×1.5×12+0.9×1.5×8+0.6 ×1.5×4+1.06×1.5×4) ×0.24] ×4 =17.942×4 =71.768
30
3工程量计算式 V圈=4.03×4 =16.12 m3 3单位 m数量 16.12 V圈=6.18×4 =24.72 m 33m .72 24m 243.695
V=335.462-71.768-19.999 =243.695 m3
序项目号 名称 2混凝 V= V总- V洞- V柱 4 土墙内墙 L净=(3.3+1.8+2.1+1.8+2.1+3.2-0.24)×2+3工程量计算式 位 单m数量 446.545 240厚 (2.3 +3.3+3.3+2.3-0.24)+(45.24-0.48)+(3.3 -0.24)×11+(4.2-0.24)×6+(3.3+4.2-0.24)×2+(2-0.24)×3+(4.2+1.3-0.24)×6 =192.62 V总=192.62×11.2×0.24 =517.763 V洞=[(0.8×2.1×4+0.9×2.1×16+1.8×2.7×6) ×0.24] ×4 =63.476 V柱=0.24×0.24×11.2×5+0.24×0.28×11.2×6 =7.742 V= V总- V洞- V柱 =517.763-63.476-7.742 =446.545 m3 现浇混凝土板清单工程量计算说明: 按设计图示尺寸以体积计算,不扣除构件内钢筋、预埋铁件及单个面积0.3 m2以内的孔洞所占体积。有梁板(包括主、次梁与板)按梁板体 31
积之和计算,板伸入墙内的板头并入板体积内计算。
序项目号 5 2名称 一层×2 顶板 板厚80 =7.8×3.3×2 =25.74×2 =51.48 SB2=2.9×2.1×2 =19.596 SB3=(3.3+3.6) ×1.42×2 =(3.3+3.6) ×1.42×2 =19.596 SB4=3.3×1.42×2 =9.372 V=( SB1+ SB2+ SB3+ SB4) ×0.08 =(51.48+12.18+19.596+9.372) ×0.08 =7.41 构造柱体积: V构= VGZ +VGZ1 =0.24×0.24×16×0.08+0.24×0.24×1×0.08 =7.41 圈梁体积: VQL=[(1.8+2.1+0.6+1.2+2.1-0.24)×2+(2.1-0.24) ×2] ×0.24×0.08 =(15.12+3.72)×0.0192 =0.362 VQL1=[(1.5+1.8-0.24) ×8+(2.9-0.24) ×4] ×0.24×0.08 =(24.48+10.64)×0.0192 =0.674
32
3工程量计算式 SB1=(1.8+2.1+0.6+1.2+2.1)×(1.5+1.8) 位 单m数量 6.296
序号 项目工程量计算式 V板=V- V构- VQL- VQL1 =7.41-0.078-0.362-0.674 =6.296 m3 单位 数量 名称 26 一层顶板 板厚100 SB5=(1.5+1.8)×3.3×2 =21.78 SB6=(1.5+1.8)×3.2×2 =21.12 SB7=(1.5+1.8)×2.3×2 =15.18 SB8=(1.5+1.8)×(3.3+3.3) =21.78 SB9=(1.3+2) ×(3.3+3.3) ×2 =43.56 SB10=(1.3+3.2+2.1+1.2+0.6)×(1.3+2) ×2 =8.4×3.3×2 =55.44 SB11=(1.3+2.3+3.3) ×(1.3+2) ×2 =45.54 SB12=3.3×(2.9+1.3) ×2 =27.72 SB13=3.3×(2.9+1.3) ×4 =55.44 SB14=(3.3+3.6) ×(2.9+1.3) ×2 =57.96 3m 31.364 序号 项目名称 工程量计算式 位 单 数量 STL=2.4×1.3×2 =6.24 构造柱面积: 33
S构=SGZ+SGZ1+SGZ2 =0.24×0.24×24+0.24×0.24×8+0.24×0.28×6 =1.382+0.46+0.403 =2.245 圈梁面积: SQL=[45-(1.8+2.1+0.6+1.2+2.1)×2-2.1×2+10.8 ×2]×0.24-0.24×0.24×28 =11.232-1.613 =9.619 SQL1=[(3.3+3.2-0.24)×2+(2.3+3.3+3.3+2.3-0.24) +(45-0.24) + (1.5+1.8-0.24) ×5+(2.9+1.3 -0.24) ×6+(2.9+1.3+1.3-0.24)×6+(2.9 +1.3+1.3+2-0.24)×2+(2-0.24)×3]×0.24 -0.24×0.24×5-0.24×0.28×6 =38.078-0.288-0.403 =37.387 V板=(SB5+SB6+SB7+SB8+SB9 +SB10+SB11+SB12+ SB13+SB14-STL -S构-SQL-SQL1)×板厚 =(21.78+21.12+15.18+21.78+43.56+55.54 +45.54+27.72+55.54+57.96-6.24-2.245-9.619 -33.787)×0.1 =31.364 m3 序号 项目名称
工程量计算式 位 34
单数量