双上侧壁导坑隧道开挖施工工艺

2020-05-11 12:02

浅析双上侧壁导坑隧道开挖施工工艺

中图分类号:

摘要:双上侧壁导坑施工技术是根据新奥法原理,通过对双侧壁导坑法的改进,同时与台阶法相结合进行大跨度隧道开挖的新技术。该技术采用双侧壁导坑法与台阶法相结合进行施工,既能保证施工安全,又能降低造价,加快施工进度,能够满足对变形要求严格的项目施工。本文详细介绍了双上侧壁导坑施工方法与注意事项。

关键词:隧道; 双上侧壁导坑; 起拱线; 施工工艺

abstract: double wall daokeng construction technology is in new orleans method according to the principle of

meshshotcreting firstly the improvement of the method, and the steps method of large span tunnel excavation of the new technology. the technology uses meshshotcreting firstly method and steps method for construction, which can ensure the construction safety and reduce cost, speed up the construction progress and can meet the requirements of the project construction strictly deformation. this paper introduces the construction method of the double wall daokeng and precautions.

keywords: tunnel; double wall on daokeng; bulging lines; construction technology


双上侧壁导坑隧道开挖施工工艺.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:九年级思品导学案(D)

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: