PURCHACE CONTRACT
NO:
--------------------------------------------------------------------------------
BUYERS (END USER): 买方: ADDRESS: ZIP CODE: 地址: 邮编:
TEL: FAX: ATTN: 电话: FAX: SELLERS : 卖方: ADDRESS: 地址:
TEL: FAX: 电话: Forwarder: 运输代理: ADDRESS: 地址:
Tel: , Fax: ATTN: 电话; ,
传真: 联系人: ATTN: 传真: 联系人: 联系人: PAGE 1
OF 7 PURCHACE CONTRACT
NO:
--------------------------------------------------------------------------------
1. COMMODITIES SPECIFICATION, QUANTITY, UNIT PRICE AND TOTAL 1.产品名称、规格, 数量、生产商、单价及总价 ITEM PART NUMBER DESCRIPTION 序号 件号 1 2. 3 4 5 6. 7 8 9 品名 QTY U/P 数量 单价 $ T/P 总价 $ TOTAL: 总价 USD 200.00 美元 200.00 MFG 生产商 Elotest M3 Eddy current test 1EA l M3-BA1 M3-NT-3 CAL-M3-NC BTU-20 KA-35-H instrument M3 Manual M3 battery Battery Charger M3 Calibration 1台 1EA 1EA 1EA 1EA 1EA 1EA Eddy current bolt 1EA Inspection system Probe 1EA NOTE: None 备注:无 TOTAL VALUE: CIF incl. insurance and freight charges USD ONLY 总价: 北京到岸价,包括保险费和运费 美元 2. COUNTRY OF ORIGIN AND MANUFACTURING: .
PAGE OF 7 2
PURCHACE CONTRACT
NO:
--------------------------------------------------------------------------------
2. 原产地国及制造商 :
3. PACKING: Usual original export packing in wooden cases/carton boxes, suitable for long distance sea/air transportation with particular attention to preventing from breakage and moisture on any part of the goods. Any losses caused by commodity damage due to improper packing or protection will be Seller’s responsibility . An additional copy of documents specified in Clause 10 shall be provided with the materials inside the box.
3. 包装:标准出口包装木箱/纸箱,适合长途海运/空运, 特别注意:要避免货物受损、受潮。任何由于不当包装和防护导致的商品受损,损失由卖方负责。箱中与货物一起还另外提供一套第10条所列单据的副本。
4. SHIPPING MARK: To be stenciled on each package with the following
marks: Contract number,BEIJING, P.R.CHINA 4. 运输标识:每个包装上都要标注: 合同号, 北京,中国。 5. TIME OF SHIPMENT: 60 days after contract is effective. 5.交货时间: 合同生效后 60天。
6. PORT OF SHIPMENT: Intl. Airport in USA 6.运输港口 : 美国境内的国际机场
7. PORT OF DESTINATION: . Zip Code: 7.目的港: 邮编:
PAGE OF 7 3
PURCHACE CONTRACT
NO:
--------------------------------------------------------------------------------
8. INSURANCE: To be covered by the seller. 8. 保险:由卖方承担货物保险费用。
9. PAYMENT: The Buyer shall make the payment by wire transfer not later than thirty (30) days after the check and approval of the products. 9.付款:买方将用电汇方式付款。付款期限为:货到验收合格之后的30天内。 10.DOCUMENTS: The Sellers shall provide the following documents: 10.单据:卖方应提供以下单据: (1) For the shipment: (1) 用于运输的单据:
A. Two (2) Invoices and Packing lists should be provided to seller’s Freight Forwarder for Customs Clearance of China.
A. 2份发票和装箱单正本提交给卖方货运代理,用于中国海关的清关。 B. Two (2) Invoices, packing lists and certificates/test report of MFG in packing box for Receiving Inspection.
B. 2份发票、装箱单及合格证/ MFG测试报告正本臵于包装箱内,用于货物验收。
(2). For payment: (2). 用于付款的单据
One (1) original Invoices and packing lists, one copy of the AWB/Ocean Bill and two (2) copies of the COC/Test report of MFG should be mailed to after shipment.
1份原始发票和装箱单正本,一份空运/海运提单副本,2份COC证书/ MFG检测
PAGE OF 7 4
PURCHACE CONTRACT
NO:
--------------------------------------------------------------------------------
报告副本在发货后邮寄到 。
(3). Other documents required on Contract. (3).合同规定的其他单据.
11. QUALITY ASSURANCE REQUIREMENT: 11.质量保证要求:
(1). Supplier’s quality management system should meet ISO 9001 (1). 供应商质量管理系统应该符合ISO9001标准。
(2). The Sellers shall guarantee that the commodities are all factory new and shall be given at least (12) months warranty from the date of arrival of the commodities at the port of destination.
(2). 卖方应保证所提供的商品为全新出厂产品,并提供从到达目的港口之日起计算至少12个月的保修期。
(3). Certification required should strictly adhere to the commodities:
A. OEM’s Certificate. B. Operating and Maintenance Instructions. (3).所提供的证书应该严格按照产品要求: A.原厂证书. B. 操作维护说明书
12. CLAIMS: If discrepancies are found according to the contract regarding quality, specification and/or weight, quantity, except that the responsibilities lie with insurance company or shipping company ,the Buyers shall, within thirty (30) days after the arrival of the commodities at the destination, have the right to claim against the Sellers.
PAGE OF 7 5