施工测量方案最终1 - 图文(4)

2020-08-23 22:52

工程141班第五组《土木工程施工》课程实训

7.组员照片

15

广东技术师范学院天河学院实训成果

8.CAD图

16

工程141班第五组《土木工程施工》课程实训

9.测量成果

数据整理:

V1=100(0+2.13+0.98+1.54)=465m3

V2=100(2.13+2.14+1.3+0.98)=3069m3

V3=100(2.19+2.11+1.71+1.3)=731m3

V4=100(2.11+2.27+2.13+1.71)=822m3

V5=100(1.54+0.98+0.96+1.46)=494m3

V6=100(0.98+1.3+1.37+0.96)=261m3

V7=100(1.3+1.71+0.87+1.31)=519m3

V8=100(1.71+2.13+2.19+0.87)=690m3

挖:V9=100(0.61*0.61)/(1.46+0.96+0.37+0.61)=11m3

17

广东技术师范学院天河学院实训成果

V9=100(1.46+0.96+0.37)(1.46+0.96+0.37)/(1.46+0.96+0.37+0.61)

=228.94m3

V10=100(0.96+1.31+0.61+0.37)=325m3

V11=100(1.31+0.87+2.68+0.61)=547m3

V12=100(2.19+2.21+2.68+0.87)=795m3

挖:V13=100*0.61*0.61/(0.61+0.37+1+1.56)=10.5m3

V13=100(0.37+1+1.56)(0.37+1+1.56)/(0.61+0.37+1+1.56)=242.51m3

V14=100(0.37+0.61+1.15+1)=313m3

V15=100(0.61+2.68+3.21+1.15)=765m3

V16=100(2.68+2.21+2.20+3.21)=1030m3

V17=100(1.56+1+0.86+1.18)=460m3

挖:V18=100*0.04*0.04/(1+1.15+0.04+0.86)=0.05m3

18

工程141班第五组《土木工程施工》课程实训

V18=100(1+1.15+0.86)(1+1.15+0.86)/(1+1.15+0.04+0.86)=297.05m3

挖:V19=100*0.04*0.04/(3.21+1.15+0.29+0.04)=0.03m3

V19=100(3.21+1.15+0.29)(3.21+1.15+0.29)/(3.21+1.15+0.04+0.29)=461.03m3

V20=100(3.21+2.20+2.09+0.29)=779m3

V21=100(1.18+0.86+1.43+1.61)=508m3

挖:V22=100*0.04*0.04/(0.86+0.04+1.73+1.61)=0.04m3

V22=100(0.86+1.61+1.73)(0.86+1.61+1.73)/(0.86+0.04+1.73+1.61)=416.04m3

挖:V23=100*0.04*0.04/(0.04+0.29+1.79+1.73))=0.04m3

V23=100(0.29+1.79+1.73)(0.29+1.79+1.73)/(0.04+0.29+1.79+1.73)=377.04m3

V24=100(0.29+2.09+2+1.79)=617m3

19


施工测量方案最终1 - 图文(4).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:生产现场安全生产确认制度

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: