基坑降水井抽水台班记录表(2)

2021-04-05 07:41

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

2013-1-2 2013-1-3 2013-1-4 2013-1-5 2013-1-6 2013-1-7 2013-1-8 2013-1-9 2013-1-10 2013-1-11 2013-1-12 2013-1-13 2013-1-14 2013-1-15 2013-1-16 2013-1-17 2013-1-18 2013-1-19 2013-1-20 2013-1-21 2013-1-22 2013-1-23

100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw 100QJ3.2-55/8、0.75kw

6 6 6 6 6 6 6 6 6 6 6 6 6 5 6 6 6 6 6 6 6 6

12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12

9 9 9 9 9 9 9 9 9 9 9 9 9 7.5 9 9 9 9 9 9 9 9

J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J12 J1、J3、J5、J

8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12 J1、J3、J5、J8、J9、J12

2013-2月份降水情况应基本同1月份,只是有个别水泵出现过故障,正在认真统计。

基坑降水究竟持续到什么时候结束,设计单位无法确定,这一问题设计单位说自己并非万能,不能确切答复。要求施工单位及相关各单位根据实际情况而定。

深圳市中深建设监理有限公司

2013-2-25


基坑降水井抽水台班记录表(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:第十讲 方差、相关系数与切比雪夫不等式

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: