O. A new distributed fault-tolerant algorithm for the Simple(21)

2021-04-05 13:00

In this paper the Simple Assembly Line Balancing Problem 1 is considered. This well known NP-hard problem has been widely studied in the last thirty years. Therefore several sequential algorithms have been designed for solving it. But although these algori

Work distribution:

2 O(p)So the whole period requires runtime31: O(p+ n+ L log p+ gdqp=B e)= O(p+ n+ L logp+ gdp=B e):= C 32 By assuming that the whole work is independent from the number of processors used for it and every processor is busy in all rounds T is set to its maximal value that is de ned by Tmax= kC log n after a few rounds. So if the sequential algorithm takes runtime Tseq there arel

Tseq pkC log n

m

rounds to be executed for the distributed one.

So the whole computation time can be estimated by:seq C+ kC log n]= pkTlog n+ Tseq 2 O Tseq: p p Note that this asymptotically analysis neglects the in uence of changing searching-tree-sizes caused by using di erent number of processors. Postive as well as negative e ects by increasing processor sizes are imaginable. Assuming successful load-balancing the result shows that if these e ects are omitted or at least of the same probability the algorithm can reach an optimal speedup by solving instances of su cient complexity. This trend can be accelerated by higher values for the constant k33.

Tseq pkC log n

The described algorithm has been widely tested on several distributed systems. In this paper the results that have been measured on the largest network (GCel), a 1024 Transputer T805 processor system, are presented. The programms are written in Ansi-C using MPI-libraries. By compiling these MPI-functions are translated Problem Time/Speedup SALOME EXT-SAL 16 Proz N=26 ND=1.45 Time 1288.3 1232.4 89.1 Speedup 1 13.83 N=28 ND=1.45 Time 687 693.35 46.85 Speedup 1 14.66 N=30 ND=1.45 Time>852.2>807.15 38.75 Speedup 1>20.83 N=46 ND=4.9 Time>2177.55>2168.2 66.85 Speedup 1>32.43 N=48 ND=4.9 Time 1043.25 1055.4 70.25 Speedup 1 14.85 N=50 ND=4.9 Time>1821.6>1783.2 71.75 Speedup 1>24.85 32 Proz 48.05 25.65 26.25 26.17 23.3>34.64 57.05>38.01 39.55 26.38 44.5>40.07 64 Proz 128 Proz 27.7 17.65 44.49 69.82 16.35 11.65 42.02 58.97 17.35 14.25>46.52>56.64 45.1 18.05>48.08>120.12 26.05 20.6 40.05 50.64 21.65 15.75>82.36>113.22

3.6 Computational results

Table 2: The average execution-times (in seconds) and the computed speedups for 20 probably chosen instances of the de ned sizes. Note that N stands for the number of operations and ND for the average node out-degree. A">" in front of a number is used if there have been some instances that could not be solved in the written time. to PARIX which is the parallel environment for using the system. Note that since this translation is not very e cient on the GCel the bottleneck of communication is raised up. As mentioned above no special attribute ofNote that there are many po

ssibilities to reduce the runtime required by this period. 33 Note that this is only true if a higher value for k do not prevent successful load-balancing.

31 Note that q is a constant (in the implemented algorithm it is reduced to four integers). 32 Tests are made with a relaxed not optimized version on a transputer system leads to time requirements of nearly 0:003p seconds.


O. A new distributed fault-tolerant algorithm for the Simple(21).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:AIAA-2005-565-450Acoustic Testing of the dielectric barrier

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: