In this paper the Simple Assembly Line Balancing Problem 1 is considered. This well known NP-hard problem has been widely studied in the last thirty years. Therefore several sequential algorithms have been designed for solving it. But although these algori
considered at rst that can still reach a solution with at most llb2 stations. After considering all those stationloads the local-lower-bound is increased. If this new value is still less than the already found upper-bound the other station-loads are considered. The intended e ect of the local-lower-bound-technique is to prefer at rst the actual best solutions to get good upper-bounds fast. With that found solutions it is often possible to fathome parts of the tree earlier. Besides this technique Scholl gives a rule that enables SALOME-1 to decide dynamically about the planning-direction (cf. SCHO95] pp. 138-142). This means that SALOME-1 opens a new station in forward or in backward direction depending on the allocateable operations. This exible rule often reduces the size of the search-tree because of the fact that nodes with smaller degree get a lower depth. Additionally SALOME-1 uses a lot of extended bounds and rules (cf. SCHO95] pp. 135-138) to reduce the searching-tree. Because of the intention of this paper they are only enumerated brie y:
Bounding concepts
1. Lower Bound-1 (LB-1): This bound summarizes the processing-times of the operations, that are still not allocated to a station and divides this sum through the cycle time C. The quotient is rounded o to the next natural number (cf. BAYB86]). 2. Lower Bound-2 (LB-2): This bound works in the same way but uses the fact that the operations with execution times exceeding C=2 can not share a station with another operation. So the lower-bound can be computed by the number of such operations and the half of the number of operations with execution time equal to C=2 (cf. JOHN88]). 3. Lower Bound-3 (LB-3): By seperating the operations into more than two groups the lower-bound-2 can be extended to a further bound. There the operations with execution-times exceeding 2=3C are placed in the rst group and increase the lower-bound by a whole station. While the operations with execution-time 2=3C gets the value 2=3 the
operations with execution-times exceeding 1=3C and less than 2=3C can share only together a further station. Because of that the lower-bound is increased by the half of the number of such operations, while the quantity of the last group of operations with execution-times equal to 1=3C is weighted with 1=3 (cf. JOHN88]). 4. Lower Bound-4 (LB-4): This bound that is only computed in the root node interpretes the operations as jobs that have to be scheduled on one machine. In this connection every operation has a tail as a lower-bound for the stations that are required by (direct and indirect) succeding operations of this operation. By allocating them in the sequence of non-increasing tails an optimal solution is found for the related one-machine-problem. The makespan of this solution can be interpreted as a lower-bound for the SALB-Problem-1. By computing this tails for every operation recursively starting by the sinks the global lower-bound is computed as a tail of an imaginary operation that is the predecessor of every other operation. Because of the fact that this lower-bound takes computation time O(n2) it is only used in the root-node. Therefore the bound is computed for both directions which leads to tails and heads for every operation (cf. JOHN88]). 5. Lower Bound-5 (LB-5): This bound computes earliest and latest stations for every operation to nd the minimal number of stations where for every operation the latest station is greaterequal to the rst possible station (cf. SABA87]). 6. Lower Bound-6 (LB-6): This bound is a combination of LB-2 and LB-3 while further aspects are respected. (cf. BERG92]). 7. Lower Bound-7 (LB-7): By using the duality of SALBP-1 and SALBP-2 a further bound can be computed. Therefore a lower bound for the cycle-time is computed to be compared with C. As a consequence the actual lower-bound can be increased if C is not greaterequal to this lower-bound.
Logical concepts
2 llb is the value of the actual local-lower-bound in this node.
1. Maximum load rule: If a non-allocated operation is assignable to the last station of a non-completed solution without exceeding the cycle time the actual node is fathomed by this rule, because of the fact that there is a solution where this operation belongs additionally to this station (cf. JACK56]). 4