Pjs = Kx×Pe = 0.3× 10 = 3kW (9)木工圆锯组
Kx = 0.3,Cosφ = 0.7,tgφ = 1.02 Pjs = Kx×Pe = 0.3× 9 = 2.7kW (10)手电锯组
Kx = 0.3,Cosφ = 0.7,tgφ = 1.02 Pjs = Kx×Pe = 0.3× 1.92 = 0.58kW (11)高压水泵组
Kx = 0.3,Cosφ = 0.7,tgφ = 1.02 Pjs = Kx×Pe = 0.3× 60 = 18kW (12)潜水泵组
Kx = 0.7,Cosφ = 0.7,tgφ = 1.02 Pjs = Kx×Pe = 0.7× 30 = 21kW (13)临电组
Kx = 1,Cosφ = 0.9,tgφ = 1.48 Pjs = Kx×Pe = 1× 30 = 30kW (14)混凝土输送泵组
Kx = 0.3,Cosφ = 0.7,tgφ = 1.02 Pjs = Kx×Pe = 0.3× 60 = 18kW
(15)总的计算负荷计算,干线同期系数取 Kx = 0.8 总的有功功率
Pjs = Kx×ΣPjs = 0.8×(47.25+2.8+2.1+2.8+8.4+4.2+37.8+3+2.7+ 0.58+18+21+30+22.5+18) = 176.8kW 总的无功功率
Qjs = Kx×ΣQjs = 0.8×(86.47+2.86+2.14+2.86+8.57+4.28+71.06 +3.06+2.75+0.59+18.36+21.42+44.4+22.95+18.36) = 248.1kVA 总的视在功率
Sjs = (Pjs2+Qjs2)1/2 = (176.82+248.12)1/2 = 304.65kVA 因此甲方提供的350 kVA总负荷能够满足施工需求。 总的电流计算
Ijs = Sjs/(1.732×Ue) = 304.65/(1.732×0.38) =462.88A