耳板尺寸并对吊耳板强度进行验算。

门槽埋设构件

确定门槽各轨道型式,断面尺寸,对主轨进行强度校核。 确定止水座及门槽护角构件型式。 闸门锁室装置设计。 启闭机械选择

计算启门力,确定启闭机类型、型号。 计算闭门力,校核是否应采取工程措施降门。 吊具设计:由启门力设计吊索。

关键词:水闸;闸室;平面闸门;防渗排水;主梁

Design the leader

The sluice is irriated and arranged one of the main buildings among the project,it is a kind of low flood peak water conservancy project builing utilizing the gate to block water or sluice, can control the adjustable water level of the flow. While closing the gate, it can block the big conservation storage, the tide of the shelf or improving the water level in front of the floodgate, can release floodwater, drain flooded fields or supple water of the downstream river or the channel while opening the gate. We design the check gate built on plain and river mainly this time.

The check gate generally crosses over the river to build, used in dry season conservation storage, redound water level for sluice fetch water, turn on floodgate release floodwater flood period. In canal is it prop up to lie in generally among the department, lateral canal divide into water mouth low reaches slightly, use for redounding the water level of branch canal, for propping up, the lateral canal fetch water

This design is divided into six following parts mainly:

1.It is analysed that the materials and sluice pivot are fixed up. The materials that offered are basic bases designed, in order to

7 edable designing the achievement safe, suitable, economy, should be familiar with and analyse various kinds of materials at first, for instance topographical, geological situation, each about according to floodgate location, topography, geology, rivers, etc, terms and every building of function, characteristic, use demanding to confirm the pivot is decorateds of the pivot this, accomplish the structure compactness, rational, coordinates, beautiful.

2.Water conservancy is calculated:

Including floodgate , is it can is it wash the design, prevention of seepage drain off water and design to defend to disappear mainly.

⑴The the floodgate give design flow definitely confirm according to sluice form and materials that draft above floodgate checking computations plan floodgate defend and print designing for dispel water flow through energy of floodgate,is it disappear strength pool, sea overflow and defend and wash the trough to design.

①Disappear in the strength pool calculate in design water storage level under the terms, gate turn on in various kinds of form, operating mode of operation and symmetrically, three and different flow of letting out while opening the to need, want according to condition of can disappearing,is it disappear depth, strength of pool to calculate, thickness of the length baseplate and construction material used.

②The sea overflowing disappear strength pool can dispel rivers 50% energy,other energy all over the place to dispel from sea,according to different letting out amount of the sluice,confirm long degree and construction material of sea.

③ Defend and wash the trough calculate sea overflow end wash form and size to defend to design.

⑶The prevention of seepage drains off water and designs: Draft the underground outline line at first, confirm the length

8 tentatively, then confirm the floodgate room baseplate, length of the bedding and material sequentially, design and strain layer and drain off water in the instead, calculate the base osmotic pressure of the floodgate finally, draw the distribution map of the osmotic pressure.

3.The floodgate room is decorated and floodgate room stability is calculated:

⑴Confirm the size of the outline line of floodgate room confirmed the floodgate room is always wide by the water conservancy condition, floodgate , size and floodgate room top structure job bridge, traffic bridge, open and close pattern and size of the equipment of baseplate very.

⑵The floodgate room is calculated steadily choosing the unit of calculating, build one according to finishing, normal conservation storage one, normal conservation storage issue add special to is it make up three opeerating mode checking computations floodgate room resist slippery stability and ground bear the weight of strength checking computations to load, distribute state and subside to ground stress difference carry on computational analysis, judge sluice ground meet strength of bearing the weight of, is it slip steady and out of shape requirement to resist.

⑶The deep layer of floodgate room is slipped and the subsiding amount of ground is calculated according to design soil physics characteristic index that materials provide, checking computations foundation is it drive some ground soil slip to the low reaches to under loading function, confirm whether to carry on the subsiding amount of the ground to calculate or not.

4.Tow sides join building-bank,structure pattern, wing of wall, assign and the stability is calculated:

⑴By physical dimension and ground terms, floodgate of room,

9 confirm bank, level, wing of wall assign the pattern and size of section.

⑵Building an two kinks of operating modes of one and normal conservation storage according to finishing, the ground on other bank, wing wall bears the weight of strength, basis steadily to slip to resist most.

⑶Facilities of prevention of seepage in the wing wall of the upper reaches and pumping equipment on the downstream wing wall are designed.

5.The structure of floodgate room is calculated: ⑴Mound stress analysis of the floodgate:

Regard as floodgate firm to connect cantilever beam at baseplate by mound, regard the combination surfaces of the mound of the floodgate and baseplate as and calculate the chain of command, separately according to use issue (gate is it block water to shut off ) and overhaul issue two kinds of operating modes , mound vertical direct stress of , shearing stress, trough stress of the door, mound bottom level sectional side direction stress of mound bottom while calculating, analyse result of calculation, is it mix muscle design to go on.

⑵Stress analysis of the baseplate:

Make gate as the boundry, divide baseplate into two part from two part central vertical rivers direction separately. Accord to finishing and building one and using the operating mode of an improved variety, calculate the load on function and lath. Including the baseplate conducts oneself with dignity,china, mound and top structure are to cut strength and is it assign to go to it, France check the watch calculates according to elastic ground roof beam guo, try to get ground and calculation lath each sectional internal force against strength, is it carry on baseplate mix muscle design to analyse.

6.The level gate is designed: ⑴Leaf structure of the door.

10 ①The layout of the structure of leaf of the door:Confirm door leaf various kinds of component structure need, figure and position , Ge Liang and pattern, way of connecting, connection of department, pattern of walking and supporting and roof beam.

②The panel is designed :On the premise of giving full play to the intensity of the panel, design one thickness of panel with rational economy. And check some and crooked intensity of conversion stress with crooked whole of the panel after the girder section is confirmed.

③Level roof beam once, carrying, the botttom roof beam is designed: Adopt the section steel.By the internal force of every component, choose the section of every roof beam, carry on intensity, rigidity checking computation.

④The girder is designed: Confirm girder figure, position, sectional form, the size of section, the section changes, wing reason welding seam design and some steady checking computations of girder.

⑤Vertical roof beam once and department design:Confirm its pattern and position , is calculated and chosen sectional size and intensity checking computations by the internal force.

⑥The roof beam is designed:Is it confirm to support to walk roof beam structure patern is according to construct requirement design roof beam, and carry on the intensity to check to its dangerous section.

⑦Walk and support designing: Confirm its structure pattern, size carry on intensity checking compitation.

⑧Lead the device to design: Confirm the inside out, side and walk and support the pattern, the position and way of connecting.

⑨Stagnant water, lifting lug are designed:Confirm the type of the stagnant water and assign the way, is opened door strength to design, checking computations to the intensity of the lifting lug board.

⑵The door trough is buried the component underground.

11


(最新版)东风节制闸设计说明书说明书含图纸毕业设计论文(3).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:12第八课《小桥流水人家》学案

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: