塔吊基础施工方案(4)

2019-01-27 19:47

19.80×7.90+19.80×2.10+16.91)×tg(45-42.00/2)-2×0.00×tg(45-42.00/2) = 77.60kN/m2

第8层土上部标高-19.10m,下部标高-20.60m

Ea8上 = (18.00×0.80+18.00×1.20+19.80×0.10+19.80×4.50+19.80×2.50 19.80×7.90+19.80×2.10+19.80×0.00+16.91)×tg2(45-12.00/2)-2×24.00×tg(45-12.00/2) = 217.85kN/m2

Ea8下 = (18.00×0.80+18.00×1.20+19.80×0.10+19.80×4.50+19.80×2.50 19.80×7.90+19.80×2.10+19.80×1.50+16.91)×tg2(45-12.00/2)-2×24.00×tg(45-12.00/2) = 237.33kN/m2

第9层土上部标高-20.60m,下部标高-21.60m

Ea9上 = (18.00×0.80+18.00×1.20+19.80×0.10+19.80×4.50+19.80×2.50 19.80×7.90+19.80×2.10+19.80×1.50+19.80×0.00+16.91)×tg2(45-35.00/2)-2×0.00×tg(45-35.00/2) = 114.14kN/m2

Ea9下 = (18.00×0.80+18.00×1.20+19.80×0.10+19.80×4.50+19.80×2.50 19.80×7.90+19.80×2.10+19.80×1.50+19.80×1.00+16.91)×tg2(45-35.00/2)-2×0.00×tg(45-35.00/2) = 119.50kN/m2

第10层土上部标高-21.60m,下部标高-26.60m

Ea10上 = (18.00×0.80+18.00×1.20+19.80×0.10+19.80×4.50+19.80×2.50 19.80×7.90+19.80×2.10+19.80×1.50+19.80×1.00+19.80×0.00

2

+16.91)×tg(45-42.00/2)-2×0.00×tg(45-42.00/2) = 87.42kN/m2

Ea10下 = (18.00×0.80+18.00×1.20+19.80×0.10+19.80×4.50+19.80×2.50 19.80×7.90+19.80×2.10+19.80×1.50+19.80×1.00+19.80×5.00 +16.91)×tg2(45-42.00/2)-2×0.00×tg(45-42.00/2) = 107.04kN/m2

2.作用在桩的被动土压力分布:

第7层土上部标高-17.00m,下部标高-19.10m

Ep7上 = (19.80×0.00)×tg2(45+42.00/2)+2×0.00×tg(45+42.00/2) = 0.01kN/m2

Ep7下 = (19.80×2.10)×tg2(45+42.00/2)+2×0.00×tg(45+42.00/2) = 209.75kN/m2

第8层土上部标高-19.10m,下部标高-20.60m Ep8

2

= (19.80×2.10+19.80×0.00)×tg2(45+12.00/2)+2×24.00×

tg(45+12.00/2) = 122.69kN/m2 Ep8

= (19.80×2.10+19.80×1.50)×tg2(45+12.00/2)+2×24.00×

tg(45+12.00/2) = 167.97kN/m2

第9层土上部标高-20.60m,下部标高-21.60m

Ep9上 = (19.80×2.10+19.80×1.50+19.80×0.00)×tg2(45+35.00/2)+2×0.00×tg(45+35.00/2) = 263.04kN/m2

Ep9下 = (19.80×2.10+19.80×1.50+19.80×1.00)×tg(45+35.00/2)+2×0.00×tg(45+35.00/2) = 336.09kN/m2

第10层土上部标高-21.60m,下部标高-26.60m Ep10

2

= (19.80×2.10+19.80×1.50+19.80×1.00+19.80×0.00)×

tg2(45+42.00/2)+2×0.00×tg(45+42.00/2) = 459.48kN/m2 Ep10

= (19.80×2.10+19.80×1.50+19.80×1.00+19.80×5.00)×

tg2(45+42.00/2)+2×0.00×tg(45+42.00/2) = 958.88kN/m2

三、桩侧面土压力产生的弯矩计算

1.主土压力对桩最低点的力矩(梯形转为矩形与三角形计算): Ma = 0.00×0.80×24.75+(22.05-0.00)×0.80/2×[23.95+0.80/3.0]+ 22.05×1.20×23.95+(37.26-22.05)×1.20/2×[22.75+1.20/3.0]+ 8.34×0.10×22.75+(20.72-8.34)×0.10/2×[22.65+0.10/3.0]+ 20.72×4.50×22.65+(79.15-20.72)×4.50/2×[18.15+4.50/3.0]+ 79.15×2.50×18.15+(88.01-79.15)×2.50/2×[15.65+2.50/3.0]+ 38.36×7.90×15.65+(69.36-38.36)×7.90/2×[7.75+7.90/3.0]+ 69.36×2.10×7.75+(77.60-69.36)×2.10/2×[5.65+2.10/3.0]+ 217.85×1.50×5.65+(237.33-217.85)×1.50/2×[4.15+1.50/3.0]+ 114.14×1.00×4.15+(119.50-114.14)×1.00/2×[3.15+1.00/3.0]+ 87.42×1.00×1.00+(99.78-87.42)×1.00/2×[0.00+1.00/3.0] = 19245.36kN.m/m

考虑到桩的直径作为计算宽度,D = 0.80m。

Ma = 0.80×19245.36=15396.29kN.m

2.被动土压力对桩最低点的力矩(梯形转为矩形与三角形计算): Mp = 0.01×2.10×7.75+(209.75-0.01)×2.10/2×[5.65+2.10/3.0]+ 122.69×1.50×5.65+(167.97-122.69)×1.50/2×[4.15+1.50/3.0]+ 263.04×1.00×4.15+(336.09-263.04)×1.00/2×[3.15+1.00/3.0]+ 459.48×1.00×1.00+(1273.51-459.48)×1.00/2×[0.00+1.00/3.0] = 4410.30kN.m/m

考虑到桩的直径作为计算宽度,D = 0.80m。 Mp = 0.80×4410.30=3528.24kN.m

3.支撑力矩:

Mm = 300.00×22.25450.00×18.75520.00×15.75300.00×12.75 = 27127.50kN.m

四、基础稳定性计算

桩式塔吊基础设置在深基坑旁边,除承受上部倾覆力矩 M0外,还要承受基坑两侧

主动土压力和被动土压力产生的力矩,在必要时候还要增加锚杆或内支撑。 塔吊基础的稳定性计算参照排桩的计算,计算简单图和计算公式如下:

塔吊基础的稳定性计算简图

其中安全系数 K 根据当地实际情况取值。

经过计算得到上式左边的弯矩和为27127.50+3528.24=30655.74kN.m 上式右边的弯矩和为1.50×(1552.00+15396.29)=25422.44kN.m

塔吊桩基础稳定性计算满足要求!


塔吊基础施工方案(4).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:中国大唐集团公司安全生产奖惩规定

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: