XX县年产2000吨地方风味肉制品,腊肉、香肠、风肉项目可行性研究(2)

2019-03-04 13:43

videoconference, Secretary of the provincial Co 香肠加工工艺流程

原料整理→淘洗切粒→配料→搅拌→装肠→扎节→排气→淘洗(清水水温度40℃左右)→晾晒→上炕烘烤(烘烤36小时)→出炕凉冷→检验→计量包装→储存待售→复检→出厂。

腊肉生产工艺流程

原料整理→配料→腌制(三天翻一次,七天出缸)→淘洗整理→上炕烘烤(烘烤36小时)→出炕凉冷→检验→计量包装→储存待售→复检→出厂。 (2)工艺说明 ①原料选择及修整

选择经卫生检验合格,肥瘦层次分明、无伤疤、不带奶脯的肋条肉,并去除净皮上的毛及污垢。切成重180~200g、长35~40cm 的薄条肉,方便悬挂。为了除去表面的浮油、污物,切条后的肋肉可以浸泡于30℃左右的清水中漂洗1~2min,然后沥干水分。 ②腌制

原料肉修整完毕后进行腌制,腌制间温度控制在4℃左右。在冬天天气特别干燥时腌制间要增加湿度,具体做法是保持地面湿润。

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eated videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \s \o resolve outstanding issues, obviously worked,\ory of the year. The County's departments at all levels must firmly establish the \old and silver\n development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \he war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \oved at the county level, up to five\ctive grasp of pollution control that focus, with the focus on three things: a good job, \he County created. Organization \back\nspection, the County garbage River, black and odorous River is \net\on, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \-stop strategy\oving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \s\al attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \nt from sewage treatment rate, running accuracy, compliance\d up the town's support network construction, is focusing on nanotubes home \on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to %up mud\deepening water of this year's \Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \one policy\es detailed cleaning, dredging plan, planning ahead of time cleaning out mud \ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the i ——腌制前准备腌制料:按配方表标明的量和比例取食盐、亚硝酸钠,混合均匀;另外准备花椒少量。

第一次上盐:原料肉表面涂上盐,要均匀、充分,待原料出水流失后,一般24小时后加第二次上盐。(注意再上盐时应先把水倒掉) ——第二次上盐:在全部肉面上涂满盐,一般腌2—3天。 ③原料肉腌制完成后除去表面的一些残留盐分和腌制配料,然后放入烘烤箱烘干,烘到肉表面呈金黄色。 ④检验、包装

对烘干好的肉进行检验,符合产品要求的进行包装;包装采用内待真空包装,然后检验是否漏气,封口不规整、或者封口时由于温度太高导致变形的剔除重新进行包装。符合要求的进行外包装,外包装封口也进行如上检验。 ⑤成品入库

包装完成后进行检验,符合标准的成品装箱入库。 3、主要设备方案

工艺设备的选型不仅要满足产品加工工艺技术的要求,而且要达到优质、高产、低消耗,实现项目投资经济效益的最大化。

treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \ videoconference, Secretary of the provincial Co

主要设备清单 序号 1 2 3 4 5 6 7 8 9 平衡器 XDJ-400洗肚机 ZTBMJ型猪蹄刨毛机 平板式运输机 双轨手推线 200型刨毛机 自动卸猪器 双轨滑轮 双轨提升机 设备名称 型 号 单位 台 台 台 台 米 台 台 套 台 根 根 台 数量 1 1 1 1 560 4 2 1445 4 800 120 2 10 镀锌叉档 11 扣脚链 12 切片机 reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eated videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \s \o resolve outstanding issues, obviously worked,\ory of the year. The County's departments at all levels must firmly establish the \old and silver\n development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \he war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \oved at the county level, up to five\ctive grasp of pollution control that focus, with the focus on three things: a good job, \he County created. Organization \back\nspection, the County garbage River, black and odorous River is \net\on, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \-stop strategy\oving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \s\al attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \nt from sewage treatment rate, running accuracy, compliance\d up the town's support network construction, is focusing on nanotubes home \on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to %up mud\deepening water of this year's \Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \one policy\es detailed cleaning, dredging plan, planning ahead of time cleaning out mud \ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the i 序号 13 切粒机 设备名称 型 号 单位 台 台 台 台 台 个 个 台 个 台 台 台 台 台 台 数量 2 1 2 2 3 4 6000 1 300 1 3 2 1 1 1 14 泵式搅拌机 15 鼓风机 16 锅炉 17 小型发电机 18 不锈钢工作平台 19 滑动扁担钩 20 喷码机 21 滑动吊链 22 手持带式电动劈半锯 23 圆盘锯 24 原料、成品运送输送带 25 螺旋预冷机 26 储氨器 27 螺杆式制冷压缩机组 treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \ videoconference, Secretary of the provincial Co 序号 28 打包机 设备名称 型 号 118针 单位 台 台 台 台 台 台 数量 2 1 1 2 1 1 1 1 2 1 2 1 1 1 1 29 颗粒包装机 30 002激光打标机 31 排风机 32 水泵 33 汽动盐水注射机 34 机动盐水注射机 35 圆封头式真空滚揉机 36 气动定量扭结灌肠机 37 100L/200L拌馅机 38 DZL-1000型真空包装机 39 绞肉机 40 电器设备 41 安全设备 42 环保设备 注射压力0.6mpa 台 功率1.5kw 台 台 台 台 台 套 套 套 reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eated


XX县年产2000吨地方风味肉制品,腊肉、香肠、风肉项目可行性研究(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:光的角谱分析法与光的传输

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: