E F G H I 35mmsq XLPE/PVC copper cable

2.5mmsq. SC PVC copper cable

35mmsq. SC PVC-I copper cable

25mm Heavy gauge PVC conduit

T5 1x28W 1200mm single bare batten fluroscent luminare Per M Per M Per M Per M Per Each 1 1 1 1 1

J K L M N O P Q R T U V W

T5 4x14W,600x600mm recessed fluroscent luminare Per Each

3 section PVC trunking size 250x65mm as Marshall Tufflex Per M

6.0mmsq. 4C PVC-SWA-PVC copper cable Per M

10.0mmsq SC PVC-I copper cable Per M

2.5mmsq. 4C PVC-SWA-PVC copper cable Per M

1.5mmsq SC PVC-I copper cable Per M

100mm diameter galvanised steel tubing 6M Per M

100mm diameter chlorinated poly vinyl chloride (CPVC) pipes 6m Per Each

80mm diameter ditto Per Each

65mm diameter ditto Per Each

25mm diameter ditto Per Each

80mm diameter CPVC globe valves Per Each

65mm diameter ditto Per Each

25mm diameter ditto Per Each

1 1 1 1 1 1 1

1 1 1 1 1 1 1

S

To collection 5/4

A

15mm diameter CPVC angle valves Per Each 1

B C D E F G H I J K L M N

160mm diameter uPVC soil waste water pipe 6M

110mm diameter ditto

38mm diameter ditto Floor trap

110 x 50mm diameter trapped floor gully

110mm ditto floor gully inlet

110mm diito wc connector 'P' outlet

32mm ditto self-releasing bottle trap

40 x 32mm diameter socket reducer

50mm Bronze gate valves

'S' trap WC bowl to BS 3402

32mm diameter back entry, low pressure flush valve

530 x 450mm counter top viterous china wash hand basin with one tap hole

Armitage Shanks viterous china semi-recessed toilet roll holder complete

Automatic hand dryer

Armitage shanks viterous china urinal bowl complete

Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each Per Each

1 1 1 1 1 1 1 1 1 1 1 1

1

1 1 1

O P Q

Ariston 80 liter pressure type water heater 6mm Plane glass mirror size 610x 475mm single bowl single drain stainless steel kichen sink size 1000 x 500 x 200mm To collection 5/5

Per Each Per Each Per M 1 1 R S T 1

COLLECTION

Page5/1

Page5/2

Page5/3

Page5/4

Page5/5

To the basic nett rates of materials used for work carried out on dayworks, an addition of 30% which is to include for unloading and storing as necessary, the use of hand plant, and machinery etc. available on site, profit and overheads. To collection of Day works 5/6

%

A

PLANT

D4 Tractor or equivalent

Hrs

3

-

B C

D7 Tractor or equivalent

Motor Grader Cat. 14 or equivalent (complete with scarifier)

Hrs Hrs Hrs 3

3

-

2 1/4 cu. Yd. Tractor excavator with loader attachment 3

- D - E F G H J K L

Mechanical excavator with 22 cu. Ft bucket capacity or equivalent

Portable Compressor with 2 breakers or equivalent with 1500 mm hoses and reels

Damp Truck (0.75 tonne)

Lorry tipper (7 tonne)

Concrete Mixer (14/10) complete for weight batch mixing

50 mm self priming centrifugal pump with hose and ancillary equipment

Concrete Vibrators

To the basic rates of plant used for work carried out on dayworks, an addition of 30% per cent, which is to include for driver and/or attendance, fuel and consumable stores supervision, insurance, road licence, profit and overheads.

Hrs hours hours hours hours hours hours

3 - 3

- 3

- 3

- 3

- 3

- 3 - - -


建筑类常见词汇,句子翻译(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:XX年小学新课改工作计划

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: