Prepare and apply three coats of polyurethane clear vanish in accordance with manufacturer's instructions to:
E General surfaces of wood
F Wood surfaces not exceeding 100mm girth
G Wood surfaces 200 - 300mm girth
To collection
Page No. 4/8/1
Page No. 4/8/2
M2 102
M 259
M 151
C Total Carried to Summary at the End of Elements 4/8/2
BILL NO. 4
ELEMENT NO. 9
EXTERNAL FINISHINGS
Cement and sand (1:4) backing including approved waterproofing additive finished smooth with a steel trowel:
A
50mm thick average laid to falls to receive bitumen roofing
M2
2,623
APP - Modified Bitumen
4mm thick EPDM APP modified bituminous water proofing membrane reinforced with polyester with 50mm side and 75mm end laps, fully bonded and torch applied onto solvent base primer conforming to ASTMD- 41 applied in accordance with manufacturers instructions; to
B
Flat roof terrace
M2
2,623
Concrete Pavers
Provide and lay 600mm x 600mm x 60mm thick approved precast concrete paving slabs; bedded on 50mm sand blinding including jointing with approved
water proof cement and sand mortar (1:4) in straight continuous joints not exceeding 2mm thick in both directions on bitumen (Measured Separately); flush pointed in water proofed grout as described on: C Flat roof terrace Parking Lines M2 1,930 D E 25mm wide yellow parking lines painted with road paint Rainwater Installation 160mm diameter uPVC PN 6 heavy duty drainage down pipe; M 402 plugged to wall/concrete with and including holderbats Extra over for 160mm water shoe. M 120 F 160mm diameter fulbora cast iron outlet. G 450 x 450mm stainless steel grating. H No 10 No 10 No 10 Total Carried to Summary at the End of Elements 4/9/1
PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS
BUILDINGS AT NAKAWA
PARKING TOWER BILL NO. 4 LEVEL 6 SUMMARY OF ELEMENTS
Element No. 2: Superstructure
Element No. 4: External Walls
Element No. 5: Interrnal Walls
Element No. 6: Windows
Element No. 7: Doors
Element No. 8: Internal Finishings
Element No. 9: External Finishings
Total Carried to General Summary S
Item R.C SUPERSTRUCTURE ELEMENT NO. 2 BILL NO. 4 PARKING TOWER PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Description Unit Quantity Rate, UGX. Amount USHS