上海建桥学院采购与供应链管理期末考试复习资料(7)

2021-01-28 22:09

suppliers up to the customer.是一个互相连接的一系列活动,有关从供应商到客户的计划,协调和控制物料、零部件、制成品

Purchasing and Supply management 采购和供应管理can be seen as an integrated part of SCM 可以被看作一个供应链额一个整合的部分。

Materials requirements planning

物料需求计划

MRP starts in the sales department with drawing up a sales plan, providing an estimate of the volume to be sold. MRP is the input for the manufacturing planning and control system consisting of:MRP开始于在销售部门制定销售计划,提供了一个估计的要销售的数量。 MRP是生产计划和控制系统的输入

Master planning主计划

Plans at the level of the product families (product groups) are established. Customer orders, sales plan, planned stocks of finished products and the production and purchasing plans are linked together产品系列(产品组)计划被建立。客户订单、销售计划,成品库存计划和生产计划、采购计划是连在一起的。

Manufacturing Resources Planning (MRP-II) 生产资源计划

Records the Manufacturing Resources needed to realize the master plan.记录生产所需资源,以实现主计划。

Master production scheduling (MPS)主生产计划

Translates the master plan into specific materials requirements. MPS provides the input for calculating the net materials requirements.将总体计划细化到具体的物料需求。MPS提供了净物料需求计算结果的输入。

General capacity testing综合能力测试

The MPS should be tested for capacity limitations and this should be done for all potential bottleneck capacities. MPS应该做容量限制测试,这个应该为所有潜在的瓶颈容量进行。 Materials requirement planning (MRP-I)物料需求计划

The materials requirements planning explodes the requirements from the MPS level on a weekly basis, step by step, in accordance with the bill of materials.物料需求计划从在每周一次的MPS水平的基础上,一步一步按照材料清单做成。

Capacity requirements planning容量需求计划

Conceptually comparable with materials requirements planning. The current and planned manufacturing orders from the MRP provide the input for the detailed production line planning从概念上与物料需求计划做比较。从MRP获得的当前和计划的生产订单提供详细的生产线计划输入的数据。

Order release订单释放

Order releases change the status of the manufacturing orders from ‘planned’ to ‘released’. The decision to release is based on the availability of the required materials and capacity.订单释放将生产订单从‘计划’改为‘释放’。释放的决定是根据所需要物料的可用性和容量。 Priority management 优先管理

The priorities are directly derived from the MPS. Each unit receives a priority sheet which lists all manufacturing orders for that line or machine center.优先级是直接从主生产计划中获得。每个部件具有一个优先级表,列出了该生产线或生产中心的所有订单内容。

Capacity Management容量管理


上海建桥学院采购与供应链管理期末考试复习资料(7).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:风电项目前期工作管理办法

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: