加油站建设项目可行性研究报告

2018-12-06 18:50

-

目 录

1 概 述 ······················································································································ 1 1.1项目名称 ···································································································· 4 1.2项目建设地点 ···························································································· 4 1.3项目性质 ···································································································· 4 1.4项目申报单位 ···························································································· 4 1.5报告编制单位 ···························································································· 4 1.6报告编制依据 ···························································································· 4 1.7项目概况 ···································································································· 5 1.8投资效益 ···································································································· 6 1.9主要技术经济指标 ···················································································· 6 2 建设单位及项目概况 ···························································································· 8 2.1建设单位概况 ···························································································· 8 2.2项目概况 ···································································································· 8 3 项目所在地基本情况和行业准入分析 ······························································ 23 3.1株洲县及淦田镇经济社会发展情况 ······················································· 23 3.2株洲县及S211沿线加油站基本情况 ····················································· 24 3.3加油站行业准入分析 ··············································································· 25 4 征地及拆迁安置补偿 ·························································································· 26 4.1项目场址 ·································································································· 26 4.2用地规模与现状 ······················································································ 26 4.3土地的权属关系及获取方式 ··································································· 26

-

-

4.4征地补偿 ·································································································· 26 4.5土地利用的合理性分析 ··········································································· 26 5 环境保护和节能 ·································································································· 28 5.1环境现状 ·································································································· 28 5.2环境影响分析 ·························································································· 28 5.3水土保持 ·································································································· 31 5.4节能 ·········································································································· 31 6 财务评价 ·············································································································· 33 6.1油罐规模 ·································································································· 33 6.2财务评价依据 ·························································································· 33 6.3运营初期的销售预测 ··············································································· 33 6.4营业收入和税金的估算 ··········································································· 33 6.5产品成本估算依据 ·················································································· 34 6.6产品成本 ·································································································· 35 6.7赢利能力分析 ·························································································· 35 6.8评价结论 ·································································································· 36

附图: 1、总平面图。 附文:

1、湖南省商务厅 湘商改发[2009]5号 《关于同意新建郴州石盖塘加油站等12个加油站、点的批复》;

2、株洲县国土资源局《关于***八斗加油站用地的初步意见》;

-

-

3、湖南省建设项目选址意见书; 4、湖南省建设项目选址(定点)申请表; 5、资信证明;

6、***八斗加油站字号名称预先核准通知书。

-

-

1 概 述

1.1项目名称

***八斗加油站

1.2项目建设地点

***梓湖村田家冲组S211西侧

1.3项目性质

新建

1.4项目申报单位

***八斗加油站

1.5报告编制单位

编制单位:资质等级:乙级 资质证号:

发证机关:国家发展和改革委员会

1.6报告编制依据

1)株洲县城市总体规划(2006~2020); 2)《株洲县土地利用总体规划》(2006-2020)。

3)《湖南省商务厅关于同意新建郴州石盖加油站等12个加油站、点的批复》;

4)《湖南省建设项目选址意见书》;

5)《株洲县国土资源局关于***八斗加油站用地的初步意见》; 6)国家发改委《项目申请报告通用文本》及其说明; 7)《建设项目经济评价方法与参数》(第三版);

-

-

8)与项目相关的各种规范、标准;

9)《汽车加油加气站设计与施工规划》[GB50156-2002(2006版)]; 10)建设单位提供的项目用地蓝线图等相关基础资料; 11)关于编制项目申请报告的咨询服务协议书。

1.7项目概况

1.7.1建设目标、建设内容及建设规模

1)建设目标

用6个月左右的时间,以完全市场运作的方式,高质量建设一座二级汽车加油站,增加S211沿线汽车加油设施,以满足过往车辆、当地农用车辆及农用机械加油的需要。

2)建设内容及规模

本汽车加油站的建设内容有:加油机厂房、生活办公用房、卫生间、储油加油设施,以及围墙、绿化等附属设施。

拟建油罐总容积100m3,包括1个30m3的93#汽油储罐,1个30m3的97#汽油储罐和1个40m3的柴油储罐。加油机配置为4机8枪。

项目总用地面积931.5㎡,规划总建筑面积301.2㎡,其中:加油机厂房200.2㎡,生活办公用房49㎡,卫生间52㎡。

1.7.2建设期

2009年9月动工兴建,2010年3月底前全部完工。工期6个月。

1.7.3总投资

1)估算总投资

-


加油站建设项目可行性研究报告.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:起草领导讲话“六字经“

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: