船舶轮机英语集成(7)

2019-02-16 00:51

电动机烧了 The motor is burnt. 24.脱落 detach 管子发现泄漏。 The pipe is found leaking.

5. 进行 carry out 白合金部分脱落了 42.刮研 fit and scrape

应进行负载试验 The white metal is partly detached. 刮研主轴承轴瓦。

The load test should be carried out. 25.查看 detect Fit and scrape the main bearing bushes. 6.吹 blow 查看氟里昂系统有无泄漏 43.回装 fit back

管子必须用压缩空气吹清 Detect the Freon system for leakage. 所有拆卸的部件修理后装复。

The pipe should be blown with compressed 26.解体 disassemble Fit back all the removed parts after

air. 解体,清洁并检查高压油泵 Disassemble, repair.

7.铸 cast clean and check the H.P. fuel pump. 44.安装 fix

按原样铸造 一个 Cast one piece as per 27.脱开 disconnect 请在这里安装一盏行灯。

sample. 把起动空气管脱开 Please fix up a portable light here. 8.引起 cause Disconnect the starting air pipe. 喷油器修好后装入气缸盖。

损坏是有剧烈振动引起的 The damage was 将发 电机与原动机脱开。 Disconnect the Fix the injector into the cylinder

caused by violent vibration. generator from the prime mover. cover after repair.

9.倒角 chamfer 28.讨论 discuss 45.锻造 forge

油 槽 须 倒 角 Oil groove is to be 我要和你讨论一下关于主轴承的问题 。 按原样锻造一个。

chamfered. I want to discuss with you something Forge one piece according to the

法兰切削后须倒角 The flange should be about the main bearing. sample.

chamfered after being machined. 29.脱开 disengage 按草图锻造一把专用扳手。

10.换掉 change 把联动装置脱开。 Forge a new spanner according to the

把它们换掉,否则我拒绝验收 Disengage the linkage. sketch.

Have them changed, otherwise I refuse to 盘车机在完成修理工作时需脱开。 46.折断 fracture

accept them. The turning gear should be disengaged on 锚机右舷机架折断了。

11.龟裂 chap completion of repair work. The starboard side frame of the

轴瓦上的白合金龟裂了 The white metal on 30.拆卸 dismantle windlass is fracture.

the bearing bush is chapped. 拆卸填料函。 47.给 give

12.核查 check Dismantle the stuffing box. 请 给 我 一 把 板 手 。 Please give me a

用桥规核查主轴承 拆卸压缩机。 spanner.

Check the main bearing with bridge Dismantle the compressor. 48.加大黄油 grease

gauge. 拆卸一号主轴承上轴瓦。 用油脂枪给滚子轴承加大黄油。Grease the

修理前后要核查拐档 Check the crankshaft Dismantle the upper bush of No.1 main roller bearing with grease gun.

deflection before and after repair. bearing. 49.研磨 grind

13.清洁 clean 31.卸下 dismount 研磨阀与筏座。

装前须清洁 Clean it before fit back. 卸下气缸盖 Grind the valve to the seat.

14.阻塞 clog Dismount the cylinder cover. 50.敲 hammer

燃 油 滤 器 阻 塞 了 The fuel filter is 32.做 do 请不要这样敲。

clogged. 你得重新再做 (返工)。 Please don’t hammer it this way.

15.涂漆 coat You have to do it all over again. 51.交给 hand over

用红丹涂管子 Coat the pipe with red 33.拉 (拔出) draw 测量数据交给轮机长。

lead. 将缸套拉出。 Please hand over the measuring report to

泵壳里涂防护漆 The pump casing is to be

coated with anti-fouling. incline

16.完成 complete finish

你什么时候能完成修理工作? piston is a little bit inclined.

When can you complete (finish) the repair inform

job? 我。 17.连接 connect when you carry out the

把电动机和淡水泵连接起来 engine trial.

Connect the motor with the fresh water

pump 住在气缸套里。

Draw out the cylinder liner. the chief engineer. 柱塞应从导套里拉出。The plunger has to 52.倾斜 be drawn out from the sleeve. 活塞有一点倾斜。 34.修饰 dress up The 把轴瓦油路修饰一下。 53.通知 Dress up the oil way of the bush. 当你进行试车时,请通知 35.钻 drill Please inform me 用手摇钻来钻孔。 Drill it with a hand drill 54.轧住、咬住 jam 36.啮合 engage 一个活塞咬

18.腐蚀 corrode 啮合盘车机和飞轮。 One of the pistons jams in the

泵壳和叶轮均有腐蚀 The pump casing and Engage the turning gear with flywheel. cylinder.

impeller are corroded. 37.仔细检查 examine 55.保持 keep

19.盖 cover 把气缸盖送车间检查。Send the cylinder cover 保持通道干净。Keep the passage clean.

请把所有卸下的部件盖起来 tothe workshop for examination 保持机舱干净。Keep the engine clean.

Please cover all the removed parts. 检查水封,看看是否在橡皮圈有泄漏。 56.泄漏 leak

中国船员招聘网http://www.crewcn.com

----------------------- 页面 7-----------------------

中国海员之家网站航海英语系列 船 舶 轮 机 英 语 集 成 第 7 页

管子因腐蚀而漏了 Clean the journals and prepare for Send the condenser to the workshop for

The pipe leaks due to corrosion. survey. repair.


船舶轮机英语集成(7).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:2017-2022年中国教学地球仪行业深度分析及投资前景研究报告目录

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: