9F燃机启动调试步骤(2)

2019-02-17 17:06

g The schedule and detail commissioning items of Unit 1 first firing to PAC 1号机组首次点火至PAC时间表及详细的调试项 Day 5 第5天 11/12/2006 1. Combined cycle base load (PPM) DLN tun-operation联合循环基本负荷ing PPM (PPM)运行 mode to 2. Preliminary DLN tuning up base base Load load with strainer (PPM)带滤网DLN调初步DLN调整基本负荷 整PPM 模式至基本负荷 1. Restart unit and load to combined cycle base load with PPM重新起动机组,加载至联合循环基本负荷PPM 2. Perform DLN tuning 执行DLN调整 3. Performance heater commissioning执行加热器调试 3. EX2100 step response test (25%, 50%, 75% and 100%).EX2100阶跃响应试验(25%, 50%, 75% 和100%) 4. PT failure test at on-line condition (25% only)联机状态下PT故障试验(仅25%) 5. HRSG safety valve test if any HRSG安全阀门试验(如果有的话) 6. Perform normal shutdown afterwards and monitor flame out at correct speed dur-ing unit coast down执行正常停机,监视机组惰行期间正确速度时的熄火情况 7. Monitor vibration levels through out the test period监视整个试验期间的振动级 8. Check HRSG expansion.检查HRSG的膨胀 After Shut-down停机后 1. Install balance shots if required如果需要,安装平衡粒 2. Repair any leaks / defects identified 修复发现的泄漏/缺陷 3. Replace or clean the strainer of LP Hood spray, and drains spray and perform any other maintenance items as required更换或清洁低压罩喷嘴和疏水喷嘴,根据需要执行其它维护项 4. Inspect and clean start up temporary gas strainers and sealing/cooling air if required to clean检查和清洁起动临时气体滤网和密封/冷却空气(如果需要清洁的话) 页次 6 / 16

2006年11月6日

版次 0

g The schedule and detail commissioning items of Unit 1 first firing to PAC 1号机组首次点火至PAC时间表及详细的调试项 Day 6 第6天 11/13/2006 PPM base load for 30 hours PPM负荷30小时 Combined Cycle Base Load联合循环基本负荷 Day 7 PPM base load for 第7天 11/14/2006 30 hours PPM基 本负荷30小时 Combined Cycle Base Load联合循环基本负荷 Day/DateTest试验 天/日期 Day 8 Cooling 第8天 down冷11/15/2006 却 1. Combined cycle base load (PPM) 1. Restart unit and load to combined cycle operation联合循环基本负荷base load (PPM)重新起动机组,加载(PPM)运行 到联合循环基本负荷(PPM) 2. Continue to run 30 hours at PPM 2. Monitor vibration levels 监视振动级 base load继续以PPM基本负荷 运行30小时 Inspect and clean start up temporary gas strainers and sealing/cooling air if required to clean检查和清洁起动临时气体滤网和密封/冷却空气(如果需要清洁的话) 1. Combined cycle base load (PPM) Operation联合循环基本负荷(PPM)运行 2. Continue to run 30 hours at PPM base load继续以PPM基本负荷运行30小时 1. Continue to run combined cycle base load (PPM)继续运行联合循环基本负荷(PPM) 2. Monitor vibration levels 监视振动级 3. Perform normal shutdown afterwards and monitor flame out at correct speed dur-ing unit coast down执行正常停机,监视机组惰行期间正常速度时的熄火 Inspect and clean start up temporary gas strainers and sealing/cooling air if required to clean检查和清洁起动临时气体滤网和密封/冷却空气(如果需要清洁的话) Purpose of Test试验目的 Cooling down to remove all of strainers冷却后拆除所有滤网 Unit activities机组活动 Cooling down to remove all of strainers 冷却后拆除所有滤网 Remarks备注 Remove all of strainers for gas fuel, sealing and cooling air, steam strainers after comple-tion of 30 hours operation运行30小时结束后拆除气体燃料、密封空气和冷却空气的所有滤网及蒸汽滤网 2006年11月6日

版次 0

页次 7 / 16

g The schedule and detail commissioning items of Unit 1 first firing to PAC 1号机组首次点火至PAC时间表及详细的调试项 Day 09 Cooling 第9天 down冷11/16/2006 却 Day 10 Cooling 第10天 down冷11/17/2006 却 Day 11 第11天 11/18/2006 DLN tun-ing Pre-mixed mode to base Load DLN调整预混合模式至基本负荷DLN Day 12 Reliability 第12天 run 11/19/2006 168hrs, 1 day可靠 性运行168小时,第1天 Day 13 Reliability Cooling down to remove all of strainers冷却后拆除所有滤网 Cooling down to remove all of strainers冷却后拆除所有滤网 Inspect inlet air and exhaust area 检查进气和排气区域 Remove all of strainers for gas fuel, sealing and cooling air, steam strainer after completion of 30 hours operation运行30小时结束后拆除气体燃料、密封空气和冷却空气的所有滤网及蒸汽滤网 Remove all of strainers for gas fuel, sealing and cooling air, steam strainer after completion of 30 hours operation运行30小时结束后拆除气体燃料、密封空气和冷却空气的所有滤网及蒸汽滤网 CEMS ready to DLN tuning CEMS准备DLN调整 Cooling down to remove all of strainers冷却后拆除所有滤网 Cooling down to remove all of strainers冷却后拆除所有滤网 Inspect inlet air and exhaust area 检查进气和排气区域 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 2. DLN tuning without strainer for Premixed mode预混合模式无滤网DLN调整 3. Load reject test for 50% and 100% 50%和100%的甩负荷试验 1. Restart unit and load to combined cycle base load with PM重新起动机组,加载到联合循环基本负荷PM 2. Perform DLN tuning 执行DLN调整 3. Load reject test for 50% and 100% 50%和100%的甩负荷试验 4. Re-Synch to gird and base load重新并网和基本负荷 5. Prepare 168 hours reliability test run准备168小时可靠性试运 1. Combined cycle base load (PM) opera-tion联合循环基本负荷(PM)运行 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 CEMS ready to PM base load CEMS准备PM基本负荷 1. Combined cycle base load (PM) 1. Combined cycle base load (PM) opera-页次 8 / 16

CEMS ready to PM base load 2006年11月6日

版次 0

g The schedule and detail commissioning items of Unit 1 first firing to PAC 1号机组首次点火至PAC时间表及详细的调试项 第13天 11/20/2006 run operation联合循环基本负荷168hrs, (PM)运行 2 day可 靠性运行168小时,第2天 Test试验 Purpose of Test试验目的 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 tion联合循环基本负荷(PM)运行 CEMS准备PM基本负荷 Day/Date天/日期 Day 14 第14天 11/21/2006 Unit activities机组活动 1. Combined cycle base load (PM) opera-tion联合循环基本负荷(PM)运行 Remarks备注 CEMS ready to PM base load CEMS准备PM基本负荷 Reliability run 168hrs, 3 day可靠性运行168小时,第3天 Day 15 第15天 Reliability 11/22/2006 run 168hrs, 4 day可靠 性运行168小时,第4天 Day 16 第16天 Reliability 11/23/2006 run 168hrs, 5 day可靠 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 1. Combined cycle base load (PM) opera-tion联合循环基本负荷(PM)运行 CEMS ready to PM base load’ CEMS准备PM基本负荷 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 1. Combined cycle base load (PM) opera-tion联合循环基本负荷(PM)运行 CEMS ready to PM base load CEMS准备PM基本负荷 2006年11月6日

版次 0

页次 9 / 16

g The schedule and detail commissioning items of Unit 1 first firing to PAC 1号机组首次点火至PAC时间表及详细的调试项 性运行168小时,第5天 Day 17 Reliability 第17天 run 11/24/2006 168hrs, 6 day可靠 性运行168小时,第6天 Day 18 Reliability 第18天 run 11/25/2006 168hrs, 7 day可靠 性运行168小时,第7天 Day 19 8 days 第19天 start up 11/26/2006 and shut down dai- ly, 1 day每天起动和停机,共8天,第1天 Day/DateTest试验 天/日期 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 1. Combined cycle base load (PM) opera-tion联合循环基本负荷(PM)运行 CEMS ready to PM base load CEMS准备PM基本负荷 1. Combined cycle base load (PM) operation联合循环基本负荷(PM)运行 1. Combined cycle base load (PM) opera-tion联合循环基本负荷(PM)运行 2. Normal shut down after completion of 168 hours reliability run test168小时可靠性运行试验完成后正常停机 CEMS ready to PM base load CEMS准备PM基本负荷 8 days start up and shut down daily每天起动和停机,共8天 8 days start up and shut down daily每天起动和停机,共8天 8 days start up and shut down daily 每天起动和停机,共8天 Remarks备注 2006年11月6日

版次 0

Purpose of Test试验目的 Unit activities机组活动 页次 10 / 16


9F燃机启动调试步骤(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:标题第一章植物体的基本结构第一节观察和实验的用具

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: