g The schedule and detail commissioning items of Unit 1 first firing to PAC 1号机组首次点火至PAC时间表及详细的调试项 Day 38 Perfor-mance 第38天 12/15/2006 Test性能 试验 ? Baseload & Part load performance test基本负荷和部分负荷性能试验 ? Emission level check排气污染程度检查 ? Operational noise levels check运行噪音级检查 Day 39 No TestCooling冷却 第39天 没有试验 12/16/2006 Day 40 Load test ? Power System Stability (PSS) 第40天 负荷试验 Tests电力系统稳定性12/17/2006 (PSS)试验 ? Baseload performance test on gas气体基本负荷性能试验 ? Part load performance tests on gas气体基本负荷性能试验 ? Emission tests排放试验 ? Operational Noise levels measurement测量运行噪音级 Remove performance test equipment拆除性能试验设备 ? Restart unit and load to combine cycle base load重新起动机组,加载至联合循环基本负荷 ? Perform PSS tests执行PSS试验 Test to be done within 25 hours after GT compres-sor water wash.在燃机压缩机水洗后25小时做试验 Ensure unit operated at baseload for at least 2 hours prior to test.确保试验前机组至少以基本负荷运行2小时 Remove performance test equipment拆除性能试验设备 This test can be done any time during com-missioning period depend on customer’s deci-sion此项试验在调试期间随时可做,由客户决定 页次 16 / 16

2006年11月6日

版次 0


9F燃机启动调试步骤(4).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:标题第一章植物体的基本结构第一节观察和实验的用具

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: