A 基本条件类
天河·幸福里 工程项目部
1
目 录
A1 企业证照资料 ·········································································· (3)
A1-1 总包单位 ·····················································································(0) A1-2 分包单位 ·····················································································(4) A1-3 项目开工手续及其他材料 ································································(0)
A2 从业人员名册与资料 ································································· (5)
A2-1 总包单位 ·····················································································(0) A2-2 分包单位 ·····················································································(6) A2-3 务工人员信息(包括总分包) ························································ (14)
A3 文件 ···················································································· (19)
A3-1 法规文件 ··················································································· (20) A3-2 收发文、传达学习记录 ································································· (28) A3-3 安全作业指导书及工种安全技术操作规程 ········································· (29)
A4 安全质量标准化考核 ·······································································(178)
A4-1 安全质量标准化达标工地考核开工申报(增报)表(表二) ····················(178) A4-2 安全质量标准化达标工地月(季)度考核评分表(表一) ·······················(179) A4-3 安全质量标准化达标工地竣工考核评审表(表五) ····························(180)
填写说明:
台帐中(表二)(表一)(表五)均由工程项目部自行收集。(包括对分包单位的考核、评定。)
2
A1企业证照资料
A1—1 总包单位 ·······················································································(0)
★A1—1—1 企业营业执照、资质证书、安全生产许可证(略) ·····················(0) ★A1—1—2 总承包合同及备案表、安全协议书、企业内部管理协议(略) ······(0) A1—2 分包单位 ·························································································(4)
A1—2—1 工程项目合格分包方名录 ························································(4) ★A1—2—2 单位营业执照、资质证书、安全生产许可证(略) ·····················(0) ★A1—2—3 分包单位的分包合同与备案、安全协议书(略) ························(0) A1—3 项目开工手续及其他材料 ··································································(0)
★A1—3—1 中标通知书、施工许可证、报监申报表、开工报告、保险凭证等 ···(0) ★A1—3—2 食堂卫生许可证 ································································ (0)
3
工程项目合格分包方名录
工程名称 ×××× 工程 A1—2—1 序号 l 2 3 4 5 企 业 名 称 上海双收建筑工程有限公司 上海长凯岩土建筑工程有限公司 ×××基础施工有限公司 ×××钢结构安装股份有限公司 ×××特种作业防水工程股份有限公司 ×××建筑劳务有限公司 类 别 大型机械装拆 脚手架搭设、租赁 基础围护 钢结构制作、安装 地下室防水施工 资质等级 二级 二级 一级 二级 二级 承包性质 专业分包 专业分包 专业分包 专业分包 专业分包 负责人 张×× 李×× 吴×× 王×× 赵×× 人数 12 25 30 35 18 6 脚手架、钢筋劳务 一级 劳务分包 李×× 发布单位(盖章):××××公司
4
A2从业人员名册与资料
A2—1 总包单位 ························································································ (0)
★A2—1—1 项目经理任命文件 ····························································· (0) ★A2—1—2 项目安全员委派文件 ·························································· (0) A2—1—3 管理人员名册及上岗证书 ······················································· (0) A2—2 分包单位 ························································································ (6)
A2—2—1 项目经理任命文件 ································································ (6) A2—2—2 项目安全员委派文件 ····························································· (6) A2—2—3 管理人员名册及上岗证书 ······················································· (7) A2—3 务工人员信息(包括总分包) ····························································· (14)
A2—3—1 职工花名册:(包括以下内容:信息卡、健康证、岗前培训等) ···· (14) A2—3—2 特种作业人员持证名册 ························································· (15) A2—3—3 安全监护、中小型机械作业人员名册 ······································· (16)
5