SAP AG
LO705 Qualit?tsprüfungen
Armin Heneka
Training System
Data Required
The demos and exercises are performed in plant 1000. All master data is available in training master ID3/400. You can also work with the IDES data for 4.6C.
User ID and Passwords for Course Participants Reference User ID:
LO705 (Authorization IDES_DEVELOP: All authorizations (without a user))
LO705_01 (Authorization IDES_ALL: All authorizations without development environment and user)
LO702_02 (Authorization IDES-USER: Profile is IDES user, without development environment and Customizing)
The standard format for User IDs is the Course ID, followed by the group number. The initial password is INIT. Use transaction ZUSR to copy these User Ids from the reference User ID. The single role “Z_LO705” exists in the training system. This role contains all of the menu paths that are important for this course. This role is assigned to the corresponding reference user Ids. You should inform the course participants that they can either work with the user menu or the SAP Easy Access menu during the course.
It is up to the course instructor which reference user ID is used to create the user IDs for the participants. Participants do not have to make changes to Customizing during the course.
Preparation in the System
*******Standard Customizing QM must be available in the system. Also see the IMG info: Quality Management -> Basic Settings -> Setting Up Clients
Example ABAPs
CATTs
The master data CATTs ZT_LO170_01 and ZT_LO705_01 must be run once in the master training system for an upgrade.
Movement data CATT ZT_LO705_02 must be run before each course.
Technical Hints
Before the course begins, you should check that you have access to the ITS. You will need to
01.07.2001
Seite 6
Establish Organizational Units
SAP AG
LO705 Qualit?tsprüfungen
Armin Heneka
use the ITS, for example, to do the system demonstration of results recording on the Internet
in unit 5 “Results recording”. You will find additional information about this demonstration in unit 5.
You should also check, before the start of the course, that the mySAP Workplace is available for the current training system. You can log on to the Workplace using your own user or the user “training”. You should check on the instructor’s PC whether or not the Workplace can be personalized and whether or not user-defined favorites can be created in the Workplace. You will find additional information in unit 9.
01.07.2001 Seite 7
SAP AG
LO705 Qualit?tsprüfungen
Armin Heneka
Goals and Objectives
? This course deals with the basic knowledge required for the quality inspection process in
a company. ? Starting with the QM master data, the areas of quality planning, quality inspection (results
recording, defects recording, inspection completion), and evaluations using the QM Information System are covered.
Course Structure and Flow
The QM inspection process is identical wherever it is used in the logistics supply chain. After planning, the quality inspection is performed. At this point, inspection results and defects can be recorded. The inspection is completed with the inspection completion and the data can then be evaluated using the QM Information System.
The course is structured so that after an introductory unit, QM master data (unit 3) and
inspection planning (unit 4) are covered in detail. 60% of the course time is needed for these units.
Unit 2: Inspection Lot
The participants should receive an overview of the general processes in a quality inspection. QM-specific terms and a short summary of the inspection process within the logistics supply chain are also included in this unit.
Unit 3: Master Data
The basics for inspection planning are covered in this unit. This includes the material master, sample determination, catalog data, inspection characteristics, and inspection methods.
Unit 4: Inspection Planning
The QM master data forms the basis for inspection planning. Starting from simple inspection plans, the structure of the inspection plan is explained. Optimization of inspection planning and the use of engineering change management complete this unit.
Unit 5: Results Recording
The single steps for results recording are explained. In addition to results recording for single inspection lots, participants learn how to record results for all inspection lots.
Unit 6: Defects Recording
You can use defects recording to determine the properties of a material or product. In this unit, the prerequisites and processes of defects recording are covered.
Unit 7: Usage Decision
The quality inspection is completed with the usage decision. This unit covers the prerequisites
01.07.2001
Seite 8
SAP AG
LO705 Qualit?tsprüfungen
Armin Heneka
for inspection completion and the consequences and effects of the usage decision.
Unit 8: Evaluations
Standard evaluations are dealt with, for example, the material analysis, vendor analysis, and
results history. Evaluation using BW is also briefly covered.
Unit 9: mySAP Workplace
This unit provides a general basis for working with the mySAP Workplace. It includes an explanation of the role concept and introduces the QM composite roles for the workplace.
01.07.2001 Seite 9
SAP AG
LO705 Qualit?tsprüfungen
Armin Heneka
Course Schedule
Course Schedule:
Day One: 300 minutes Approximate Content: Units and Topics Duration 20 mins 20 mins 45 mins 20 mins 90 mins 45 mins 45 mins Introduction Course Overview Inspection Lot Master Data Material Master Sample Determination Master Inspection Characteristic Catalogs Activities: Instructor and Participant Presentation, Introduction Presentation Presentation, Demo, Exercises Presentation, Demo Presentation, Demo, Exercises Presentation, Demo, Exercises Presentation, Demo, Exercises Additional notes:
Depending on the interests of the participants, more time may have to be spent on the sample determination section. However, you should aim to begin discussing the master inspection characteristic topic on the first day.
01.07.2001 Seite 10