危险性较大的分部分项工程的验收
编制: 333 审核: 333 批准: 333 编制日期:33年33月33日
21
目 录
B2-4-1 模板工程安全验收表 ········································································ (26) B2-4-2 落地式钢管扣件脚手架搭设验收表 ······················································ (27) B2-4-3 悬挑式脚手架验收表 ········································································ (28) B2-4-4 门型脚手架验收表 ··········································································· (29) B2-4-5 附着式升降脚手架验收表 ·································································· (30) B2-4-6 吊篮式卸料平台验收表 ····································································· (34) B2-4-7 悬挑式卸料平台验收表 ····································································· (35) B2-4-8 落地式卸料平台验收表 ····································································· (36) B2-4-9 移动式操作平台验收表 ····································································· (37) B2-4-10 安全防护设施验收表 ······································································ (38) B2-4-11 施工现场临时用电验收表 ································································ (39) B2-4-12 桩工机械安装验收记录表 ································································ (40) B2-4-13 物料提升机验收表 ········································································· (41) B2-4-14 施工升降机验收表 ········································································· (42) B2-4-15 塔式起重机验收表 ········································································· (50) B2-4-16 施工机具验收记录表 ······································································ (58) B2-4-17 起重吊装验收表 ············································································ (60)
22
模板支撑系统验收记录表
B2-4-1
模板工程名称: 砼、梁、柱、楼板模板工程 施工部位: 3#房结构八层 施 工 单 位: 333333公司 支撑材料: 钢管 序号 1 验收项目 施工方案 验 收 要 求 方案完整,绘有施工详图,指导施工,支撑系统设计计算、审批手续齐全,作业前应进行安全交底,交底资料完整 支撑立柱材质:木杆应用松木或杉木,有效直径不得<80mm,并去皮,不得采用易变形、折裂、枯节的木材:如采用钢管,管子外径不得小于Φ4833.5的钢管,无严重锈蚀、裂纹、变形 立柱底部的垫块材料,应符合施工组织设计要求,不得用砖块垫高 按施工组织设计要求,支撑高度为(3)M时,立柱间水平撑设(2)道水平支撑,纵横向剪刀撑开档间距(5)M。立柱间距符合设计要求,纵向(1000)mm,横向(1000)mm 立柱接长杆件接头应错开,木杆接长按设计要求 4 5 木杆连件及扣件 作业环境 支撑木杆连接应采用符合要求的材料,不得采用铁丝、麻绳等绑扎;采用扣件固定其紧固力矩为45~50N2M,钢管支撑接长,应采用对接,不准绑接 2M以上高处支模作业,操作人员应有可靠的立足点,防护设施完善 检点记录 查安全资料1-4 结 果 有经审批的方案内容齐全,有交底记录 2 支撑材质 查支撑材料 (30根立杆) 查垫块(全数) 查方案与实物(纵、横距各30点) 查接头30点 测扣件力矩50点 查现场 采用Ф4833.5的钢管,无变形、锈蚀 用5㎝厚木材作垫块 立杆纵距950㎜,横距1000㎜,有二道水平支撑 接头错开 采用对接,紧固力矩均大于50N2M 有操作架 3 立柱稳定 验收意见: 经检查验收,模板支撑系统符合方案设计要求,同意上层钢筋施工。 验收人员: 333、333、333、333、333 23
合格牌编号 NO:05 验收日期 2004-3-28 监理 333 搭设班组负责人 333 技术负责人 333 落地式脚手架搭设验收记录表
B2-4-2
工程名称: 33333花苑 单位名称: 3333333公司 序号 1 2 3 4 5 6 7 8 9 10 11 12 13 14 验收项目 立杆基础 架体与建筑物拉结 防护栏杆及网 施工层底笆满铺 剪刀撑设置 脚手架材质 脚手架扣件 脚手架宽度 立杆间距 大小横杆 四步一隔离 登高设施 杆件搭设 通道口防护、重要设施防护棚 钢管脚手架接地 搭 设 要 求 坚实平整、有排水措施.立杆下铺5cm厚木板、搭设高>24米,应有基础设计方案 拉结点间距、水平、垂直距离符合要求,拉结材料符合要求,高度>24米不准采用柔性连接 自第二步起设栏杆扶手,按规定设置围档封闭,密目网符合要求,操作层及以下二步设踢脚板 踢脚板底笆与大横杆绑扎点不少于4点 不大于9m设一道剪刀撑,夹角为45°~60°,自下而上连续设置,高度超过24m时,在脚手拐角及中间沿纵向每隔60°跨横向平面内搭设斜杆 钢管脚手管外径不得小于Φ48mm,壁厚不得低于3.5mm,无严重锈蚀、裂纹、变形、扣件紧固力矩45~50N2m 按设计宽度(1)m搭设 立杆垂直偏差不大于全长的1/100H,立杆间纵距按设计(1.8m)m设置,偏差±50mm 横平竖直、大横杆的固定间距不大于6m、挠度不大于杆长1/150 每四步设一道隔离措施,第一道隔离设在结构的首层 应设在脚手架外侧,斜道坡度按设计(1/3)设置并设防滑条,上下爬梯装设稳固 接头错开,剪刀撑杆件接长不小于l m,立杆对接必须交叉进行 按结构高度,搭设通道防护棚:长度(3)m设计方案要求 四角应设接地保护及避雷装置 检验结果 有经审批的方案,基础坚实平整,有排水有垫板 每3H2L有一拉结点,刚性拉结 第二步以上已设扶手栏杆,围档封闭,并有三步踢脚板 底笆与大横杆四点绑扎 每9m设一剪刀撑,夹角在45°~60°之间,连续设置 钢管无严重锈蚀、裂纹、变形,扣件紧固,抽检50只力矩均大于50N2M 按设计宽度1m搭设 立杆纵距按设计(1.8m)m设置,偏差小于50mm 横平竖直,大横杆每一跨一固定 首层已设隔离措施,以上每四步一隔离 登高措施在脚手架外侧,有防滑条 剪刀撑杆件搭接长度为1m,接头错开 按结构高度已搭设双层防坠棚,上层为夹板,下层竹片 四角已设接地保护及避雷装置 验收意见: 经验收合格,在使用过程中应有专人进行“管、用、养、修” 参加验收人员:333、333、333、333 脚手架总高度 16m 验收日期 33年33月33日 注: 1.验收栏目内有数据的,必须在验收栏内填写实测的数据,无数据用文字说明。 2.此验收表只能作一次使用,分阶段验收合格后挂牌,每次验收合格后挂一次牌。验收合格牌必须有编号,并注明验收日期。 3.脚手架在使用过程中,必须要有定期的检查、保养制度。 监理负责人 333 专业单位技术负责人 333 24
验收时搭设高度 10.8m 合格牌编号 N0:01 搭设班组及负责人 333 总包单位技术负责人 333 25