施工现场英语500句(5)

2019-08-26 17:10

174 give me your opinion on this plan.

请把你对这个计划的意见告诉我。

八、技术资料和图纸(34句)

technical documents and drawings

175 we completed this task according to the drawing number sd-76.

我们按照图号sd-76的图纸完成了这项工作。

176 according to the technical standard (norm, rules of operation), the erection (alignment, testing )work is now getting on .

安装(校准、试验)工作正在根据技术标准(规范、操作规程)进行。

177 this is a plot plan (general layout ,general arrangement, detail ,section, erection ,flow sheet, pid, assembly, civil, electrical, control and instrumentation, projection, piping, isometric ) drawing.

这是一张平面布置(总平面、总布置、细部、剖面、安装、流程、带仪表控制点的管道、装配、土建、电气、自控和仪表、投影、配管、空视)图。

178 that is a general (front, rear, side, left, right, top, vertical, bottom, elevation, auxiliary, cut-away, birds eye) view.

那是全视(前视、后视、侧视、左视、右视、顶视、俯视、底视、立视、辅助、内部剖视、鸟瞰)图。

179 how many drawings are there in the set?

这套图纸有几张?

180 is this a copy for reproduction?

这是一份底图吗?

181 what is the edition of this drawing?

这张图纸是第几版?

182 is this drawing in effect?

这张图纸有效吗?

183 is this a revised edition?

这是修订版吗?

184 will it to be revised yet?

这图还要修订吗?

185 are there some modifications (revisions) on the drawing?

这张图上有些修改(修正)吗?

186 the information to be placed in each title block of a drawing include: drawing number, drawing size, scale, weight, sheet number and number of sheets, drawing title and signatures of persons preparing, checking and approving the drawing.

每张图纸的图标栏内容包括:图号、图纸尺寸、比例、重量、张号和张数、图标、以及图纸的制图、校对、批准人的签字。

187 there are various types of lines on the drawing such as: border lines, visible lines, invisible lines, break lines, phantom lines.

图上有各种形式的线条,诸如:边框线、实线、虚线、剖面线、中心线、引出线、尺寸线、断裂线、假想线。

188 we have not received this drawing, (instruction book, operation manual) please help us to get it.

我们还未收到这张图纸(说明书、操作手册),请帮助我们取得。

189 please send us further information about this item.

请将有关这个项目的进一步的资料送交我们。

190 I want additional information on this.

我需要这方面的补充资料。

191 please explain the meaning of this abbreviation (mark, symbol) on the drawing.

请解释图上这个缩写(标记、符号)的意义。

192 we comply with and carry out the GB standard (ansi, bs, afnor, jis, din) in this project.

在这个工程中我们遵守并执行中国国家标准gb。(美国标准、英国标准、法国标准、日本标准、联邦德国标准)

193 please make a sketch of this part on the paper.

请将这个零件的草图画在纸上。

194 would you lend me your information? (handbook, brochure)

可否将你的资料(手册、小册)借给我?

195 please bring us those drawings.

请把那些图纸带给我们。

196 this is a translated information, it maybe not quite sure.

这是翻译的资料,可能不太确切。

197 it is a mistake in translation.

那是一个翻译错误。

198 the copy is blurred, it is not very clear.

这个复制件被弄模糊了,不太清晰。

199 please give us a copy of this information .(technical specification, instruction, manual, document, diagram, catalog)

请给我们一份这个资料(技术规程、说明书、手册、文件、图表、目录样本)的复印本。

200 please send us a technical liaison letter about it .

请给我们一份有关此事的技术联络单。

201 i received this letter (report, detailed list )last week .

我上周收到此信。(报告、清单)

202 a working drawing must be clear and complete.

工作图必须简明完整。

203 just look at this drawing.

看看这张图吧。

please have a look at the drawing.

请看这张图。

204 please make a copy of this letter.

请把这信复制一份。

i have done six copies.

我已复制六份。

205 data on equipment can be found in the related information.

有关设备的数据可从有关的资料中找到。

206 such information would not avail much.

这些资料用处不大。

207 have you any idea how to use the manufacturer’s handbook.

你知道怎样使用这本厂家手册吗?

208 we regard these data as very useful .

我们认为这些数据是很有用的。

九、公用工程

utility

209、public utilities are carefully regulated here.

公用事业在这里受到仔细的管理。

210、the pressure maintained in the water main is two kilogram per square centimeter.

自来水总管里的水压保持为2公斤/平方厘米。

211、the water has been treated (softened),but it is not drinkable water.

这水经过处理(软化),但不是饮用水。

212、the common service voltage of electric power in our country is 220/380 volt.

我国普通供电电压为220/380伏。

213、there is a switch board (control panel, distribution box) mounted on the wall.

在墙上装有一个开关板(控制盘、配电箱)。

214、we have an emergency-standby electric generator with a capacity of 300 kilowatts.

我们有一台三百千瓦的事故备用发电机。

215、the substation equipped with a transformer of 500 kva is at the south of the plant.

在工程的南边有一座装有五百千伏安变电器的变电站。

216、the pressure of the compressed air at the work site is about 7kg/cm2.

工地用压缩空气的气压约为7公斤/平方厘米。

217、there is a steam heating system (air conditioning system ) in the work-shop.

这车间里装有一个蒸汽加热系统(空气调节系统)。

218、the post office is in renmin street, it is open from 7.a.m till midnight.

邮局在人民路,从上午7点一直开到半夜。

219、you can send the letter by airmail (regular mail, registered mail).

你可以邮寄航空信(平信、挂号信)。


施工现场英语500句(5).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:黄贺小学创建文明校园规划

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: