首基样板评审策划 - 图文

2019-03-28 19:49

目 次

1 策划概述············································································1

1.1 编制目的·····································································1 1.2 编制依据·····································································1 1.3 工程建设的意义(简述)························································2 1.4 工程建设主要特点·····························································3 1.5 工程参建单位·································································4 2 工程创优目标·······································································4

2.1 质量控制目标·································································4 2.2 安全控制目标·································································4 2.3 文明施工和环境保护控制目标···················································5 2.4 工期控制目标·································································5 2.5 造价控制目标·································································6 2.6 工程档案管理目标·····························································6 3 监理资源配置及创优组织·····························································6

3.1 监理资源配置·································································6 3.2 监理创优组织································································12 4 监理创优措施······································································24

4.1 综合管理措施································································24 4.2 质量控制措施································································26 4.3 安全文明施工与环境保护控制措施··············································33 4.4 进度控制措施································································39 4.5 造价控制措施································································40 4.6 工程档案管理创优措施························································40

1.策划概 述

1.1 策划目的

为了实现本工程建设管理单位徐州供电公司“创优规划”中提出的“工程零缺陷移交、确保达标投产、确保国家电网公司优质工程,争创国家级优质工程”的创优目标及争取2011年10月31日投运的工程管理目标,减少返工和材料、人工浪费,特制定本策划。

1.2 策划依据

(1)国家及行业有关法律法规。

(2)建设管理单位编制的《工程建设管理纲要》。

(3) 《国家电网公司工程建设质量管理规定(试行)》国家电网基建〔2006〕699号 (4) 《国家电网公司工程建设质量责任考核办法(试行)》国家电网基建〔2006〕674号 (5) 《电力建设工程施工技术管理导则》国家电网工〔2003〕153号

(6) 《国家电网公司输变电工程建设创优规划编制纲要》基建质量〔2007〕89号 (7) 《国家电网公司输变电工程达标投产考核办法》2005年版 (8) 《国家电网公司输变电优质工程评选办法》2008年版

(9) 《国家电网公司输变电工程项目管理流动红旗竞赛实施办法》2010(167号)

(10) 《关于利用数码照片资料加强输变电工程安全质量过程控制的通知》基建安全〔2007〕25号

(11) 《关于强化输变电工程施工过程质量控制数码照片采集与管理的工作要求》基建质量〔2010〕322号

(12) 《国家电网公司输变电工程施工工艺示范手册》基建质量〔2006〕135号 (13) 《国家电网公司输变电工程施工工艺示范光盘》基建质量〔2009〕290号

(14) 《国家电网公司输变电工程工艺标准库》基建质量〔2010〕100号

(15) 《国家电网公司电力建设工程施工质量监理管理办法》国家电网基建〔2010〕166号 (16) 《国家电网公司输变电工程质量通病防治工作要求及技术措施》基建质量〔2010〕19号

1

( 17) 《输变电工程建设标准强制性条文实施管理规程》国家电网科〔2009〕642号Q/GDW248-2008

(18) 《国家电网公司电网建设项目档案管理办法(试行)》国家电网办〔2010〕250号 ( 19) 《国家电网公司基建安全管理规定》国家电网基建〔2010〕1020号

( 20) 《国家电网公司输变电工程施工危险点辨识及预控措施》国家电网基建安全〔2005〕50号 ( 21) 《输变电工程安全文明施工标准》国家电网Q/GDW 250-2009

(22) 《国家电网公司十八项电网重大反事故措施(试行)》国家电网生技〔2005〕400号 ( 23) 《协调统一基建类和安全生产类标准差异条款(变电部分)》办基建〔2008〕20号 (24) 《关于国家电网公司标准化建设成果(通用设计、通用设备)应用及管理办法》国家电网基建〔2009〕1321号

(25) 《国家电网公司“两型一化“变电站设计建设导则》国家电网基建〔2007〕1109号 ( 26) 《国家电网公司输变电工程试运行工作有关规定》国家电网基建〔2010〕613号

( 27) 《国家电网公司输变电工程建设创优规划编制纲要》等七个创建优质工程的指导性文件。 (28)本工程《监理规划》

1.3 工程建设主要特点

500kV岱山变电站工程是按照“两型一化”标准设计,本工程具有以下特点: 土建部分的主要特点

本期需拆除原西侧围墙征地扩建,为满足设计标高,需回填土方约8万立方米。扩建场地属中等液化,地基处理按变电站最终规模一次处理,主要建筑物和构架采用混凝土管桩,无功补偿设备及电缆沟采用水泥搅拌桩。

本工程主控通信楼,220kV保护小室、电源室等前期开关站阶段已经建成。本期新建建筑物有500kV保护小室2座,主变及35kV保护小室1座和消防室1座,建筑面积为446.32平方米,采用单层框架结构,基础采用钢筋砼条形基础。保护小室内装修、建筑外立面装修材料及风格、色调同前期。内墙采用白色乳胶漆,不设吊顶,顶棚采用乳胶漆涂料。外墙以白、绿为主,白色墙面辅以绿色条块,体现国家电网公司变电站建筑形象。

2

室外配电装置场地根据“两型一化”的实施意见,扩建场地仍然采用砂石化。站内道路采用公路型道路,路面采用混凝土路面,道路边缘高出场地0.15m,与电缆沟盖板顶面平齐。道路布置结合总平面布局及施工运输需要,尽量考虑运行、巡视通畅,检修方便、并满足安全消防的要求。 电气主接线的特点

电气主接线总体设计安全可靠,便于运行维护,500kV采用1个半断路器接线,220kV采用双母线双分段,35kV采用单母线接线。 二次系统部分特点

原220kV岱山开关站布置有220kV保护小室,在主控楼设置独立的计算机室、蓄电池室、直流电源室及通信机房。本期500kV岱山变电站将监控单元、UPS电源、保护管理信息子站等二次设备与通信设备布置于主控楼计算机室。500kV保护主保护实现双重化配置,配备35kV并联电抗器保护、站用变保护等,相关保护、控制设备就地布置。

原220kV岱山开关站远动信息采集由计算机监控系统完成,本期在原有基础上进行扩容改造,站控层新增2台远动工作站、2台主机、2台操作人员工作站和1台工程师站。间隔层按本期扩建规模增加测控单元。

配电装置以及主要电气设备的选择

500kV采用悬挂管母线、断路器三列式布置;220kV采用支持管母线、户外中型布置;35kV采用支持管母线,,无功补偿采用“一”字形布置。

500kV、220kV、35kV母线侧分别按短路电流水平63kA、50kA和40kA选择电气设备。主变压器采用单相、自耦、无励磁调压变压器,高一中阻抗值按20%考虑,主变中性点安装10欧姆小电抗。500kV、220kV和35kV均采用户外敞开式常规设备,500kV、220kV断路器选用SF6瓷柱式。本期至双泗2回500kV出线断路器装设合闸电阻,双泗I、II线及阚山I、II线出线用隔离开关采用超B类接地开关。低压并联电抗器采用油浸式电抗器。

1.4工程参建单位

项目法人单位:江苏省电力公司

建设管理单位:江苏省电力公司 500千伏输变电工程筹建处 工程监理单位:江苏兴力工程建设监理咨询有限公司 勘察设计单位:江苏省电力设计院

3

施工单位: 江苏省送变电公司

质监单位: 江苏省电力基本建设工程质量监督中心站

2.工程创优目标

2.1 质量控制目标

2.1.1 质量总目标

工程质量符合国家、行业及国家电网公司颁发的施工技术规程、质量验收规范及相关规定。过程控制数码照片真实完整规范。全面应用标准工艺,努力消除质量通病,工程确保国家电网公司优质工程。争创国家电网公司项目管理(安全、质量、项目)流动红旗。争创国家级优质工程。工程质量总评优良,并满足:

土建部分:分项、分部工程合格率100%,单位工程优良率 100%,观感得分率≥90%。 安装部分:分项、分部工程合格率100%,单位工程优良率100%。

2.2 安全控制目标

通过加强监理控制,做到: 不发生人身伤亡事故。

不发生因工程原因引起的电网及设备事故。 不发生一般施工机械设备损坏事故。 不发生火灾事故。 不发生环境污染事件。

不发生负主要责任的重大交通事故。 文明施工目标:

严格执行《国家电网公司输变电工程安全文明施工标准》,设施标准,行为规范、施工有序、环境整洁,努力消除安全通病。

4


首基样板评审策划 - 图文.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:《南齐书·列传第九·刘善明传》原文及翻译

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: