This design is from the Central Plains to the transition region of Jilin Province in

eastern mountain area(Department of the Chinese second uplift)two highway construction drawing design.The first step is to route design,including:Graphic Design(design and calculation of horizontal curve),vertical section design(design and calculation of vertical curve),cross-sectional design(design roadbed width,side ditch,ditch lane,etc.),the design result swith plan,vertical section,transverse plane figure,straight curve angle table,table,design of the Subgrade Earthwork Calculation Table;the second step is the design of roadbed and road surface,wherein the roadbed design includes:width of road bed design,subgrade cross section design.Pavement with asphalt pavement,the design results include: the pavement structure design,the standard axle load conversion,design calculation,each layer of material allowable bending stress calculation,bending stress checking,design results of pavement structure,axle load conversion table.

KEY WORDS: secondary roads , roadbed , line , design


黄松甸至敦化二级公路施工图设计(K136+500-K138+600)(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:2014年MBA报考指南

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: