北京某学校空调通风工程施工组织设计 - secret

2018-12-29 21:25

安装工程施工组织设计

北京XX学校国际部 施工组织设计

北京XXXX机电设备安装

工程有限公司

施工组织设计(安装工程) 第2页 共51页

目 录

第一章 编制依据及采用标准 ··········································································4 1.1编制依据 ···································································································4 1.2采用规程、规范、技术标准和图集··························································4 第二章 安装工程概述 ·······················································································5 2.2主要设备明细表························································································5 第三章 质量目标和综合管理措施 ·····································································8 3.1工期目标 ···································································································8 3.2质量目标和质量管理 ················································································8 3.2.1质量目标 ·······························································································8 3.2.2质量管理 ·······························································································8 3.3安全目标 ···································································································9 3.4文明施工目标 ···························································································9 3.5质量保证措施 ···························································································9 3.5.1一般质量保证措施 ················································································9 3.5.2暖通工程质量保证措施·······································································10 3.6质量通病防治措施 ··················································································12 3.6.1暖通工程质量通病防治措施 ·······························································12 3.7 各专业分项工程质量控制措施································································13 3.8保证工期措施 ·························································································14 3.9安全生产措施 ·························································································16 3.10文明施工及环境保护措施 ·····································································17 3.11成品保护措施 ·······················································································18 3.12消防措施 ·······························································································18 3.13现场保卫措施 ·······················································································19 3.14冬、雨季施工措施 ················································································19 第四章 施工组织机构 ·····················································································21 第五章 施工部署 ·····························································································23 5.1 技术准备工作 ·························································································23 5.5劳动力计划 ·····························································································25 5.6材料采购计划 ·························································································25 第六章 主要分项项目施工方法及技术措施 ····················································26

2

施工组织设计(安装工程) 第3页 共51页

一、暖 通 工 程 ·······················································································26 6.1 空调供回水工程施工··············································································26 6.2通风、空调工程······················································································30 6.3通风机、空调风机盘管安装: ·······························································33 6.4空调机电线管安装 ··················································································34 6.5调试 ········································································································34 6.6管道水压试验 ·························································································34 6.7清洗与消毒 ·····························································································35 第七章 关键部位及交叉作业的施工原则························································36 7.1 安装交叉施工的主要原则及技术措施 ··················································36 7.2 专业施工关键 ·······················································································37 第八章 降低成本技术措施 ··············································································38 第九章 工程档案 ···························································································39 9.1本工程施工资料的管理将按以下管理流程整理 ·····································39 9.2工程交工技术档案 ··················································································39 9.3竣工图 ····································································································40 第十章 竣工交接与服务承诺 ··········································································41 10.1有关工程的服务与承诺 ········································································41 10.2竣工图编制移交····················································································41 工艺附表一 风管制作流程图 ··································································42 工艺附表二 风管安装流程图 ··································································43 工艺附表三 暖通设备安装流程图···························································44 工艺附表四 通风空调工程调试工艺 ·······················································45 资料管理流程附表一 工程技术报审资料的管理流程图 ····························46 资料管理流程附表二 工程物资选样资料的管理流程图 ····························47 资料管理流程附表三 工程物资进场报验资料的管理流程图 ···················48 资料管理流程附表四 分项工程施工报验资料的管理流程图 ····················49 资料管理流程附表五 分部工程报验资料的管理流程图 ····························50 资料管理流程附表六 竣工报验资料的管理流程图 ···································51

3

施工组织设计(安装工程) 第4页 共51页

第一章 编制依据及采用标准

1.1编制依据

1.1.1暖通工程设计施工图。

1.1.2工程招标文件、施工工程概算、现场场地情况。 1.1.3国家及北京市有关文件规定。

1.2采用规程、规范、技术标准和图集 《采暖通风与空气调节设计规范》(GB50019-2003) 《建筑给排水设计规范》(GB50015-2003) 《建筑设计防火规范》(GB50016-2006) 《地源热泵系统工程技术规范》(GB50366-2005) 《锅炉房设计规范》(GB50041-92)

《电气装臵安装工程低压电器施工及验收规范》(GB50254-96) 《电气装臵安装工程电缆线路施工及验收规范》(GBJ50168-92) 《电气装臵安装工程盘柜及二次回路接线施工及验收规范》(GB50171-92)《 建筑电气安装工程质量检收评定标准》(GBJ303-2002)

4

施工组织设计(安装工程) 第5页 共51页

第二章 安装工程概述

2.1本项目为北京市地源热泵工程,目前2.15万平方米的冬夏空调。空调末端以风机盘管为主。

2.2主要设备明细表

主要暖通设备材料表 (教学楼A段) 序号 名 称 1 卧式暗装静压风机盘管 卧式暗装静压风机盘管 2 3 4 5 主要暖通设备材料表 (教学楼B段)

序号 名 称 卧式暗装静压风机盘管 1 2 3 4 5 6 7 8 9 10 11

5

型 号 HB-02 HB-04 HB-05 HB-06 HB-10 单位 台 台 台 台 台 数量 36 31 14 18 9 卧式暗装静压风机盘管 卧式暗装静压风机盘管 卧式暗装静压风机盘管 型 号 HB-02 HB-03 HB-04 HB-05 HB-06 HB-07 HB-08 HB-10 V=15000m3/h 单位 台 台 台 台 台 台 台 台 台 台 台 数量 37 5 6 15 28 1 2 26 1 2 卧式暗装静压风机盘管 卧式暗装静压风机盘管 卧式暗装静压风机盘管 卧式暗装静压风机盘管 卧式暗装静压风机盘管 卧式暗装静压风机盘管 卧式暗装静压风机盘管 KFPD-15C吊顶新风机 LY-5000T/W新风换气机 施工组织设计(安装工程) 第6页 共51页

主要暖通设备材料表 (教学楼C段) C区地下室 序号 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 1

名 称 卧式暗装静压型风机盘管 卧式暗装静压型风机盘管 LY-800T/W新风换气机 LY-5000T/W新风换气机 KFPD-15C薄型吊顶新风机组 YTPY-S-5A双速消防排烟风机排风机 YTPY-S-9A双速消防排烟风机排风机 SJG-SX-7双速风机(防爆型) SJG-3F斜流排风机 SJG-7E斜流排风机 C区一层 卧式暗装静压型风机盘管 卧式暗装静压型风机盘管 卧式暗装静压型风机盘管 卧式暗装静压型风机盘管 卧式暗装静压型风机盘管 惯流式空气幕FKM-090 惯流式空气幕FKM-120 KFPD-15C薄型吊顶新风机组 LY-5000T/W新风换气机 C区二层 卧式暗装静压型风机盘管 型 号 HB-02 HB-05 HB-02 HB-04 HB-07 HB-08 HB-12


北京某学校空调通风工程施工组织设计 - secret.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:年产800万米聚乙烯塑料包装项目可行性研究报告

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: