UFGS 02 66 10 Test Fill(5)

2020-12-16 09:44

UFGS 02 66 10 Test Fill

a. Proposed modifications to the test fill design;b. Placement sequence;

c. Surface water control and diversion;d. Equipment to be used including operating speeds, traffic

patterns, and number of passes;e. Geosynthetics products to be used and geosynthetics manufacturer's equipment recommendations.

1.3 SUBMITTALS**************************************************************************

NOTE: Review submittal description (SD) definitions

in Section 01 33 00 SUBMITTAL PROCEDURES and edit

the following list to reflect only the submittals

required for the project.The Guide Specification technical editors have

designated those items that require Government

approval, due to their complexity or criticality,

with a "G." Generally, other submittal items can be

reviewed by the Contractor's Quality Control

System. Only add a “G” to an item, if the submittal

is sufficiently important or complex in context of

the project.For submittals requiring Government approval on Army

projects, a code of up to three characters within

the submittal tags may be used following the "G"

designation to indicate the approving authority. Codes for Army projects using the Resident

Management System (RMS) are: "AE" for

Architect-Engineer; "DO" for District Office

(Engineering Division or other organization in the

District Office); "AO" for Area Office; "RO" for

Resident Office; and "PO" for Project Office. Codes

following the "G" typically are not used for Navy,

Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed

item for Army projects.**************************************************************************Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for [Contractor Quality Control approval.] [information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Construction Plan

QC Inspector


UFGS 02 66 10 Test Fill(5).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:2012年最全的职称英语历年真题及答案1

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: