UFGS 02 66 10 Test Fill(6)

2020-12-16 09:44

UFGS 02 66 10 Test Fill

SD-06 Test ReportsWeekly ReportsFinal Report

1.4 QUALITY ASSURANCE**************************************************************************

NOTE: This paragraph and references to the QC

inspector should be removed if a QC inspector will

not be used.

**************************************************************************The QC inspector shall be present during test fill construction, shall

review the Contractor's test data, and shall ensure that the Contractor has constructed each layer of the test fill as specified. The QC inspector shall meet the qualifications identified in Section [02 56 13 WASTE CONTAINMENT GEOMEMBRANE] [_____]. Submit the QC inspector qualifications, as specified.

PART 2 PRODUCTS

**************************************************************************

NOTE: Not all of the materials described below will

be included in each test fill. Delete materials

that are not applicable. The layer thicknesses

specified should be modified on a site specific

basis.**************************************************************************2.1 RANDOM FILL

Random fill shall consist of a [300] [_____] mm [12] [_____] inch layer as specified in Section [31 00 00 EARTHWORK] [_____] and as shown on the drawings.

2.2 CLAY BARRIER LAYER

The clay barrier layer shall consist of a [600] [_____] mm [24] [_____] inch compacted clay layer as specified in Section 02 56 14 CLAY BARRIER LAYER and as shown on the drawings.

2.3 GEOMEMBRANE

The geomembrane barrier layer shall be as specified in Section 02 56 13 WASTE CONTAINMENT GEOMEMBRANE and as shown on the drawings. A [smooth

geomembrane] [geomembrane textured on the [top] [bottom] side] [geomembrane textured on both sides] shall be placed in the test fill.2.4 GEOSYNTHETIC CLAY LINERThe geosynthetic clay liner shall be as specified in Section 02 56 15 GEOSYNTHETIC CLAY LINER (GCL) and as shown on the drawings.

2.5 GEOSYNTHETIC DRAINAGE LAYER

The geosynthetic drainage layer shall be as specified in Section 31 05 20 GEOSYNTHETIC DRAINAGE LAYER and as shown on the drawings.


UFGS 02 66 10 Test Fill(6).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:2012年最全的职称英语历年真题及答案1

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: