内容摘要
施工组织设计是项目建设和指导工程施工的重要文件,是建筑施工企业单位能以高质量、高速度、低成本、少消耗完成工程项目建筑的有力保证措施,也是加强管理、提高经济效益的重要手段,也是很正确处理施工中人员、机器、原料、方法、环境及工艺与设备,土建与安装写作,消耗与供应,管理与成产等各种各样的矛盾,科学合理地、计划而有序地均衡地组织项目施工生产的重要保障。施工组织设计在施工全过程乃至工程预结算中占有重要地位,组织设计不仅仅是组织施工、指导生产的作用,在客观上已成为经济管理工作中不可忽视的非常重要的组成部分。
一个施工项目的组织设计,内容包括:工程概况、施工部署、施工方案的选择、施工质量控制措施、施工进度控制措施、施工机械和设备供应、施工安全和工地环境管理措施、施工平面图和进度计划(流水图或网络图)、经济指标。
本文详细阐述了西善花园1#工程施工组织设计的编制依据和原则、施工方案等内容,本施工组织设计既可为建设管理单位提供决策依据,又可为承包商提供有效指导,并且是监理的重要参考资料。
关键词:施工组织设计;项目建设;施工生产
I
西善花园1#楼施工组织设计
目 录
内容摘要 ····························································································· I 引 言 ······························································································· 1 1 编制说明························································································· 2
1.1 编制说明 ················································································ 2 1.2 编制依据 ················································································ 2 1.3 编制原则 ················································································ 2 2 工程概况························································································· 4 3 主要工程量 ····················································································· 5 4 施工部署及施工进度计划 ··································································· 7
4.1 施工部署 ················································································ 7 4.2 施工进度计划 ·········································································· 7 5 施工组织机构 ·················································································· 9 6 施工准备······················································································· 10
6.1技术准备 ················································································ 10 6.2现场准备工作 ·········································································· 10
6.2.1组织准备 ········································································ 10 6.2.2生产准备 ········································································ 10 6.3施工准备工作 ········································································· 10
6.3.1现场用电布置 ·································································· 10 6.3.2施工用水用电 ·································································· 11 6.3.3围墙、大门、场区道路 ······················································ 11 6.3.4材料堆放的布置 ······························································· 11 6.3.5施工平面布置的管理措施 ··················································· 11 6.3.6雨季施工措施 ·································································· 11 6.3.7冬季施工措施 ·································································· 12
7 主要工程项目施工方法 ···································································· 14
7.1土方开挖 ················································································ 14
7.1.1 旧基础处理 ···································································· 14 7.1.2放设坡道 ········································································ 14
II
西善花园1#楼施工组织设计
7.1.3施工顺序和方法 ······························································· 14 7.1.4施工工艺 ········································································ 14 7.1.5坡道的设置 ····································································· 14 7.2回填土工程 ············································································· 14
7.2.1施工准备 ········································································ 14 7.2.2操作工艺 ········································································ 15 7.3钢筋工程 ················································································ 15 7.4模板工程 ················································································ 17 7.5混凝土工程 ············································································· 19
7.5.1施工准备 ········································································ 19 7.5.2混凝土的运输 ·································································· 20 7.5.3混凝土的浇筑与振捣 ························································· 20 7.5.4混凝土养护 ····································································· 20 7.5.5混凝土施工时容易出现的裂缝及预防 ···································· 20 7.6砌筑工程 ················································································ 21
7.6.1施工准备 ········································································ 21 7.6.2操作工艺 ········································································ 21 7.6.3质量标准 ········································································ 22 7.7 脚手架工程 ··········································································· 23
7.7.1构造要求 ········································································ 23 7.7.2 搭设要求 ······································································ 24 7.7.3 钢管脚手架搭设要点 ······················································· 25
8 主要材料计划 ················································································ 27 9 施工机械设备计划 ·········································································· 28 10 劳动力计划 ·················································································· 30 11 施工总平面图 ··············································································· 31 12 施工技术组织措施 ········································································· 32
12.1.1土石方工程 ···································································· 32 12.1.2模板工程 ······································································· 32 12.1.3钢筋工程 ······································································· 32 12.1.4混凝土工程 ···································································· 33
III
西善花园1#楼施工组织设计
12.1.5砌筑工程 ······································································· 34 12.2 工期保证措施 ······································································· 34
12.2.1工期目标主要分段控制点 ················································· 34 12.2.2组织管理措施 ································································· 35 12.2.3技术保证措施 ································································· 35
参考文献 ··························································································· 36
IV