第一章 编制依据及原则 ········································································ 1 第二章 工程概述 ················································································· 3 第三章 施工总布臵 ··············································································· 5 第四章 施工总体方案与进度计划 ··························································· 7 第五章 项目组织机构 ········································································· 10 第六章 主要施工方法简述··································································· 15 第七章 质量管理体系与措施 ······························································ 50 第八章 安全管理体系与措施 ······························································· 63 第九章 应急管理 ············································································· 78 第十章 环境保护管理体系与措施 ······················································ 80 第十一章 资源配备计划 ······································································· 83

1

*********************工程施工组织设计

第一章 编制依据及原则

一、编制依据

1、依据本工程《********************************工程施工图设计图册》与《********************************工程工程地质勘察报告》 2、施工合同、工程量清单及施工图会审纪要。 3、现行有关施工规范、标准、规程。 4、本公司的技术力量及施工机械设备。

本工程在充分参考以上资料及相关信息的前提下,经专业技术人员精心安排、严谨构思后组织编写。

本施工组织设计未尽事项,今后在施工过程中可在此设计的基础上,根据实际情况进一步进行科学的完善和补充。 二、编制原则

1、认真贯彻国家对工程建设的各项方针和政策,严格执行工程建设程序。遵守招标文件的规定与投标书的承诺。

2、保证重点,统筹安排,遵循建筑施工工艺及其技术规律,坚持合理的施工程序和施工顺序。

3、采用流水施工方法、工程网络计划技术和其它现代管理方法,组织有节奏、均衡和连续地施工。

4、尽量利用先进施工技术,科学地确定施工方案。

5、严格控制工程质量,确保安全施工,努力缩短工期,不断降低工程

1

*********************工程施工组织设计

成本。

6、充分利用现有施工机械和设备,扩大机械化施工范围,提高施工项目机械化程度,不断改善劳动条件,提高劳动生产率。

7、科学地安排冬期和雨季施工项目,保证全年施工的均衡性和连续性。 8、科学地规划施工平面图,减少施工用地,合理储存建设物资,减少物资运输量。

2

*********************工程施工组织设计

第二章 工程概述

一、工程概况

工程建设地点: ********************************。

工程规模:本项目的主要建设内容为:工程包括开挖蓄洪湖、新建进水闸、排水泵站和调水泵站、厂房、管理楼及篮球场等。设计库容为151.39万立方米,死库容为8.76万立方米;水闸总净宽32米,设计过闸流量151.2立方米/秒;排水泵站设计流量为12.27立方米/秒,装机容量为1260千瓦;调水泵站设计流量为0.95立方米/秒。 二、水文地质

工程区位于********************************,在茅湾涌与西山涌汇合处东南侧,地下水属潜水类型,赋存于第四系地层中,受大气降水及地表水补给,水位变化明显受地表河涌水变化的影响,第四系各地层多处于饱和状态。地下水主要受大气降水补给,地表水径流、河流对地下水的补给、排泄及水量、水位变化,均构成较大影响。茅湾涌水对混凝土无腐蚀性,对钢筋混凝土结构中钢筋无腐蚀蚀性,对钢结构具有弱腐蚀性;地下水对混凝土无腐蚀性,对钢筋混凝土结构中钢筋无腐蚀性,对钢结构具有弱腐蚀性。

中山市三乡蓄水湖工程区地处珠三角地带,为河流冲淤积滩地,属珠江三角洲冲淤积平原及剥蚀残丘地貌。其工程区都位于

********************************,在茅湾涌与西山涌汇合处东南侧,

3

*********************工程施工组织设计

河涌水下地形较平坦,地面高程起伏不大。北东、南面主要穿越菜地、稻田以及公路、居民区,场地通视条件较好。根据工程性质,分别对两条围堤进行评价。现分述如下:

蓄水湖围堤地基土分层:场地岩土层主要由第四系人工填土层、现代河流冲积层和滨海相沉积层以及燕山期基岩组成。岩土可分8 个工程地质层,自上而下依次为:①人工填土、②粉质粘土、③粘土质中粗砂、④-1 淤泥、夹砂淤泥、④-2 含贝壳淤泥质粘土、⑤-1 粘土、⑤-2 砂质粘土、⑥-1 粘土质中粗砂、⑥-2 粘土质砾砂、⑦-1 砂质粘土、⑦-2 粘土、⑧-1(全风化)花岗岩、⑧-2(强风化)花岗岩、⑧-3(弱风化)花岗岩。整个堤围堤基地质结构可划分为双层结构(Ⅱ)和多层结构(Ⅲ):其中双层结构(Ⅱ)细分为Ⅱ1 表层为一般粘性土,中下部为淤泥,桩号为0+000~0+300;Ⅱ2 表层为粘性土,上部为软土,中下部为砂层,桩号为0+500~1+700、2+120~2+520;多层结构(Ⅲ)细分为Ⅲ1 表层为粘性土,上部为砂层,中部为淤泥,下部为粘土,桩号为0+300~0+500;Ⅲ2 上部为软土、中下部为砂层,下部为粘土,桩号为1+700~2+120。

西山涌出口右岸围堤岩土可分3个工程地质层,自上而下依次为:②粉质粘土、④-1 淤泥、⑤-1 粘土,整个堤围堤基地质结构为双层结构(Ⅱ1),其Ⅱ1 表层为一般粘性土,中下部为淤泥。

4


水利工程施工组织设计.doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:综合英语unit 12 Where the Sun Always Rises

相关阅读
本类排行
× 注册会员免费下载(下载后可以自由复制和排版)

马上注册会员

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: